Quarterly Activities Report & Appendix 5B
Released
Released
Announcement PDF
ASX Release
29 April 2025
QUARTERLY ACTIVITIES REPORT
for the period ending 31 March 2025
Graphite Bull Project (100% BUX)
•
•
Updated Mineral Resource Estimate (MRE) increases contained graphite by
345% to 2.25 Mt at a 7% Total Graphitic Carbon (TGC) cut-off, with 40% now
classified as Indicated Resources:
Ongoing qualification and metallurgical testwork continues, including
expanded downstream testing with BTR and SPG testwork by Dorfner
Anzaplan
Copper Wolf JV (51% IGO, 49% BUX, IGO option to earn 70%)
•
IGO has formally notified Buxton of its intent to commence Stage 2 Earn-in
(committing expenditure of AUD $5.35 million) to earn an additional 19%
interest.
Madman Project (100% BUX)
•
•
•
Approval of DEMIRS Programme of Work
Logistical reconnaissance completed & local stakeholder engagement
New applications lodged for Exploration and Miscellaneous Licenses
Centurion Project (100% BUX)
•
•
Earthworks and drilling contractors appointed (JB Contracting and TopDrill)
Drilling to test large-scale IOCG target is scheduled to begin in June 2025
Corporate
•
•
•
Gervaise Heddle appointed as Chair of the Board of Directors
Cash balance (31 March 2025) of approximately AUD $0.660 million
Subsequent to Quarter: $3.0 million placement secured at $0.025/share
www.buxtonresources.com.au
P O Bo x 661
15 R o b i ns o n St
T. 08- 9380 6063
N edlands W A 6009
Bel mo nt W A 6104
E . info@buxtonresources .co m.a u
Buxton Resources Limited (ASX: BUX & BUXO) (“Company” or “Buxton”) is pleased
to release the Quarterly activities report and Appendix 5B for the period ended 31
March 2025 (the Quarter).
Copper Wolf Project (IGO 51%, BUX 49%, IGO option to earn 70%)
Buxton’s Copper Wolf Project consists of Lode Mining Claims and Mineral Exploration
Permits in Yavapai County, Arizona. The Copper Wolf Project has multiple historical
resource estimates available that confirm the presence of a large Laramide porphyry
Cu-Mo system (see ASX 25 Oct 2021).
Porphyry Cu-Mo mineralisation at Copper Wolf is largely concealed by a post-mineral
(Tertiary) sequence of volcanic and sedimentary rocks. The Project is located within
one of the most prolifically endowed copper belts in the world, yet it has not seen any
drilling since the early 1990s. Buxton’s 2022 airborne magnetic survey was the first
geophysical work undertaken since the early 1960s. Historic exploration has consisted
of relatively wide spaced drilling which focussed on significant supergene copper
mineralisation. Buxton is targeting high grade, underground bulk mineable coppermolybdenum mineralisation.
On the 4 Oct 2022, Buxton received shareholder approval for Buxton and IGO to enter
into an earn-in and joint venture agreement for the Copper Wolf Project.
The Copper Wolf JV Project comprises tenure subject to the IGO JV (~12.5 km2, and
includes the supergene blanket which has been the focus of previous exploration
including historical resource estimates).
During the previous Quarter, Buxton announced that IGO have met the Stage 1 Earnin Requirement of the Copper Wolf Agreement (see ASX 22 Aug 2022 and 2 Sep
2022), that being expenditure of AUD $350k (exclusive of GST) and that IGO have
thereby earned a 51% interest in the BUX / IGO JV Tenements.
During the Quarter, IGO elected to earn an additional 19% interest, which if
completed will bring its stake to 70%, by investing an aggregate A$5.35 million in
exploration and development. IGO had previously sole-funded a drilling program that
resulted in exceptional intersections of porphyry mineralisation with assay results
including 405.38 m @ 0.35% Cu and 0.05% Mo in CPW002DD and 83.76m @ 0.4% Cu
and 0.06% Mo in CPW001DD (ASX 14 Dec 2023).
www.buxtonresources.com.au
P O Bo x 661
15 R o b i ns o n St
T. 08- 9380 6063
N edlands W A 6009
Bel mo nt W A 6104
E . info@buxtonresources .co m.a u
Copper Wolf Project (BUX 100%)
Buxton’s interests in the Copper Wolf Project area also include BUX 100% (non-IGO
JV) tenure over ~30.5 km2 covering substantial basement exposures where Buxton’s
exploration results indicate potential for copper-molybdenum porphyry mineralisation
at shallow depths such as at the Wolverine and Sun Devil / Aztecs prospects (Figure
1). Buxton also owns a 33.62 acre surface parcel with associated access and
groundwater infrastructure / rights within the area of the JV tenure, but which is not
subject to the JV. These tenements are encumbered by a Right of First Refusal (‘RoFR’)
established by the earn-in and joint venture agreement for the Copper Wolf Project
that commenced on 4 Oct 2022. IGO’s RoFR expires on 4 Oct 2027.
Figure 1: Copper Wolf Project tenure situation showing ~30.5 km2 area (pale orange coloured polygons)
for which Buxton has 100% interest in the subsurface estate. These areas include substantial basement
exposures indicating potential for copper-molybdenum porphyry mineralisation at shallower depths in
comparison to the Bobcat, Rattler and Coyote prospects. The BUX / IGO JV covers ~12.5 km2, and
includes the supergene blanket which has been the focus of previous exploration including historical
r es ource es t imat es . BRAL owns a 33.62 acre surface parcel with associated access and water rights.
www.buxtonresources.com.au
P O Bo x 661
15 R o b i ns o n St
T. 08- 9380 6063
N edlands W A 6009
Bel mo nt W A 6104
E . info@buxtonresources .co m.a u
Graphite Bull Project (BUX 100%)
The Graphite Bull Project (Exploration License E09/1985) is located 280 km East of
Carnarvon in the Murchison Region of Western Australia. In 2013 and 2014, Buxton
released Mineral Resource Estimates for the main zone of graphite mineralisation.
Buxton also undertook initial metallurgical studies at this time aimed at coarse flake
production. In 2023 and 2024 Buxton completed diamond and RC drilling programs
aimed at expanding the Resource utilising geophysical surveying and geological
mapping tied with resampling and analysis of the historical sample inventory.
During the previous Quarter, Buxton announced the results from assaying from the
most recent programs (see ASX 24 Oct 2024 and 12 Dec 2024). Standout, shallow,
high-grade results include:
•
•
•
•
GB012RC: 124 m @ 16.6% TGC from 44 m
GB013RC: 56 m @ 14.4% TGC from 8 m
GB011RC: 50 m @ 24.9% TGC from 38 m
GB009RC: 10 m @ 37.3% TGC from 12 m, including 6 m @ 47.3% TGC
During the Quarter, Buxton reported on the significant expansion of the Graphite Bull
Project’s Mineral Resource Estimate (MRE). The updated MRE was prepared by ERM,
and has significantly increased the scale of the project, with Total Resources now 20.7
Mt @ 10.8% TGC at a 7% TGC cutoff and contained graphite increasing by 345% to
2.25 Mt (Table 1, ASX 17 Feb 2025). Excellent continuity of mineralisation is evident,
with average thickness of ~45 m over 1.65 km strike.
Improved confidence from Buxton’s substantive and recent metallurgical,
groundwater, environmental, market and mining studies have led to the Project’s
maiden Indicated Resources to be defined which now account for 40% of the total
Resource reinforcing the project’s economic potential.
Graphite Bull Mineral Resource estimate, TGC ≥ 7%
JORC Resource
Clas s ificat ion
Tonnage Aver age TGC Grade
( Mt )
( %)
Contained Graphite
( T GC Mt )
Indicated
7.6
11.6
0.89
Inferred
13.1
10.4
1.34
Tot al
20. 7
10. 8
2. 25
www.buxtonresources.com.au
P O Bo x 661
15 R o b i ns o n St
T. 08- 9380 6063
N edlands W A 6009
Bel mo nt W A 6104
E . info@buxtonresources .co m.a u
During the previous Quarter major anode manufacturer BTR continued qualification
testwork on Graphite Bull ore and flake concentrate. An ore sample of ~738 kg from
2024 Infill Resource drilling was sent to BTR in late 2024 (ASX 31 Oct 2024). BTR has
advised Buxton that it has completed flotation testwork on this material and has since
requested additional flake concentrate to facilitate an expanded downstream testwork
program through to anode production optimised for an established South Korean cell
manufacturer.
During the Quarter, BTR advised that the flotation testwork results on this material
strongly support their interest in undertaking further testwork. Buxton subsequently
supplied an additional ~100 kg of Graphite Bull flake concentrate to support an
expanded downstream testwork program (spheronization, coating & battery /
electrochemical testwork). BTR have now advised that results from this expanded
program are now expected in July 2025 (ASX 1 Apr 2025).
During the Quarter Dorfner Anzaplan GmbH reported results from Spheroidised
Purified Graphite (SPG) testwork (see ASX 15 Jan 2025).
Narryer Project (BUX 100%)
The Narryer Project was staked to target magmatic Ni-Cu-PGE sulphide mineralisation
along the Yilgarn Craton margin within the Murchison Region of WA.
Buxton has completed substantive systematic exploration programs since 2021,
including regional gravity / airborne EM programs and two rounds ground EM.
Buxton completed the first drilling program on the Project at the Ranger Prospect in
2024 (see ASX 23 August 2024). Assays confirmed that NY001RC intersected 60
metres @ 4.34% TGC from 192 m, including 20 metres @ 9.06% TGC from 231 m (ASX
4 Oct 2024). Buxton’s review of geophysical datasets suggests that this graphite
mineralisation extends close to surface at Ranger, and 19.1 km of strike was defined
as prospective for similar mineralisation which represents a new province-scale, 100%
owned graphite play.
Centurion Project (BUX 100%)
The Centurion Project consists of a single EL covering ~80 km2 located in the Great
Sandy Desert between Kiwirrkurra and Balgo. The EL covers a prominent dipolar and
www.buxtonresources.com.au
P O Bo x 661
15 R o b i ns o n St
T. 08- 9380 6063
N edlands W A 6009
Bel mo nt W A 6104
E . info@buxtonresources .co m.a u
offset magnetic and gravity anomaly pattern which is characteristic of Iron Oxide
Copper Gold (IOCG) deposits such as Olympic Dam and Prominent Hill.
The principal target is defined by magnetic & gravity anomaly 3,500 m by 5,000 m in
extent and 1500 nanoTesla magnetic and 10.1 milligal gravity in amplitude.
Although little is known of the pre-Canning geology, the Centurion Project is situated
in an excellent regional structural setting. Magnetic data indicates that the target is
located between 520 - 700 metres beneath ground level under post mineral cover
sequences of the Canning Basin.
A previous drillhole by CRA in 1991 encountered drilling difficulties and was
terminated at 432.30 m and failed to reach basement. The geological logs noted
chlorite-pyrite altered clasts in a boulder conglomerate assigned to the Permian Grant
Formation toward the end of the hole. This observation provides strong
encouragement that the geophysical response may be related to a hydrothermal
system, and that the basement interface may not be far below the base of that hole.
Buxton has entered in Heritage Protection Agreements with the Ngurra Kayanta and
Parna Ngururrpa Aboriginal Corporations. Provision for Buxton personnel and
contractors to pass through lands of the Kiwirrkurra People is provided by a third
access agreement. Buxton has also received permits from the Aboriginal Lands Trust
to complete statutory requirements to access the Project.
Buxton also received an Exploration Incentive Scheme grant for up to AUD $220k to
offset the cost of this drilling program (this grant expires in December 2025).
During 2024, Buxton announced that it had received all heritage clearances required
to allow for the commencement of drilling activities (see ASX 10 Oct 2024).
During the Quarter, Buxton appointed contractors for earthworks (JB Contracting) and
drilling (TopDrill) to undertake the maiden drilling program, which is scheduled to
commence in June 2025.
Madman Project (BUX 100%)
The Madman Project consists of Exploration License E69/4182located on unclaimed
crown land in the Little Sandy Desert approximately ~375km NE of Wiluna in Western
Australia. Interpretation of publicly available magnetic data indicated a relatively
www.buxtonresources.com.au
P O Bo x 661
15 R o b i ns o n St
T. 08- 9380 6063
N edlands W A 6009
Bel mo nt W A 6104
E . info@buxtonresources .co m.a u
shallow aeromagnetic anomaly similar in amplitude and geological setting to the Winu
and Havieron discoveries in the northern Paterson Province.
During the Quarter Buxton completed negotiations for a Heritage Agreement and
received PoW clearances to undertake initial drill testing. Buxton also undertook a
logistical reconnaissance visit to meet the owners/managers of the Glenayle and
Carnegie Stations and to determine optimal access routes to mobilise equipment to
the Project.
Subsequent to the Quarter (on 11th April 2025), Buxton secured applications for an
additional Exploration License (E69/4283, covering 161 blocks or 502 km2) and a
Miscellaneous License 69/66, which secures site access from existing public roads.
Matrix Project (BUX earning 100%)
In May 2024, Buxton announced that it had entered into a binding Earn-In Agreement
to acquire 100% of the Matrix Manganese Project ("Matrix") located in
Mohave County, Arizona, from Solution Mining Pty Ltd ("Solution") (see ASX 14 May
2024).
The Matrix Project consists of 154 Lode Mining Claims (MTX 001 - MTX 154) covering
~12 km2 in Mohave County, Arizona. The Matrix Project claims cover the interpreted
western extension of the Artillery Peak manganese mineralisation.
The material terms of the Agreement are as follows:
• Buxton will Earn-In to 100% ownership of 154 BLM Lode Mining Claims by
spending AU$1.0M over a maximum of 2 years (14th May 2026).
• Buxton will issue Solution AU$150k equivalent in shares within 20 days after the
agreement is executed (priced at the 20-day VWAP), and a 1.5% NSR royalty.
Buxton retains a right of first refusal over this royalty.
• Buxton will issue Solution a second tranche of AU$100k in shares at the 2 years
anniversary, or on completing the Earn-In, whichever comes earliest.
• Mandatory commitments are limited to the claim maintenance fees (currently
US$25,410).
Should BUX subsequently either;
• IPO the project: Solution will get 10% of the new entity's capital structure, plus
priority right to subscribe to an additional 9.9% on the same terms as for other
investors of that IPO; or
www.buxtonresources.com.au
P O Bo x 661
15 R o b i ns o n St
T. 08- 9380 6063
N edlands W A 6009
Bel mo nt W A 6104
E . info@buxtonresources .co m.a u
•
Progress the project: Solution to get milestone payments payable, at BUX's
discretion in BUX shares or cash, as follows; 3% (of fair market value of the
project) at Resource, 2% at Feasibility Study and 1% at Decision to Mine
Manganese was first discovered in the region around 1880 at Artillery Peak. The
deposits at the Artillery Peak occur as two distinct types of deposit, stratiform
manganese deposits and vein manganese deposits. In 2011 American Manganese Inc.
(now Recyclico AMY.V) defined Indicated & Inferred Resources of 277 Mt @ 2.8% Mn.
A Tetra Tech study in 2012 focused on a smaller area with Indicated and Inferred
Resources of 82 Mt @ 2.3% Mn (with 198 Mt remaining current outside this area).
In the 1980s the US Bureau of Mines (USBoM) evaluated the feasibility of in-situ and
heap leaching for Mn extraction from domestic US ores. Of the 25 deposits examined,
the material tested from the Artillery Peak project area presented the fastest and
highest Mn recovery characteristics in column leaching, and was the only deposit
selected for further evaluation targeting suitability for in-situ recovery (ISR) methods work which was curtailed when the USBoM was abolished in 1996.
During the Quarter Buxton undertook interpretation of results from a drone magnetic
survey and defined initial drilling targets. Buxton also continued engaging with the
BLM to secure permitting and approvals for a maiden drilling program.
Shogun & Royale Projects (BUX 100%)
The Shogun and Royale Projects are located in the Paterson Region of Western
Australia. Exploration at Shogun Project is targeting magmatic Ni-Cu-Co-PGE
sulphide deposits. The Royale Project covers exploration targets for hydrothermal Cu
+/- Au – Mo deposits.
During the previous Quarter Buxton finalised negotiations and executed a Land
Access & Mineral Exploration Agreement executed with Jamukurnu-Yapalikunu
Aboriginal Corporation (JYAC). The Agreement will pave the way for Exploration
Licenses Applications E45/6229 & E45/6231 (Royale) and E45/6233 (Shogun) to be
granted in early 2025.
Subsequent to the Quarter-end, on 9th April 2025, Buxton received grant documents
for one of the Royale project Els (E45/6231).
www.buxtonresources.com.au
P O Bo x 661
15 R o b i ns o n St
T. 08- 9380 6063
N edlands W A 6009
Bel mo nt W A 6104
E . info@buxtonresources .co m.a u
Lateron Project (BUX 100%)
The Lateron Project consists of Exploration License E80/5545 located on unclaimed
crown land close to the Tanami Road, approximately 10 km East of Billiluna and 150
km South of Halls Creek in Western Australia. Buxton previously undertook
petrological analysis on fragments of diamond drill core recovered from the site of
AFMECO’s 1982 diamond drillhole S19. The report indicates the core fragments
consist of “biotite hornblende quartz diorite, with coarse titanite and sericite /
muscovite pyrite-magnetite-chalcopyrite overprint” – such rocks are typically
associated with magmatic-hydrothermal Cu-Au mineralisation. Airborne magnetics
indicates these intrusive rocks cover > 7 km2.
During the Quarter Buxton continued negotiations on a Heritage Agreement.
West Kimberley Project (BUX / IGO JV)
The West Kimberley Project is targeting Nova-style magmatic Ni-Cu sulphide
mineralisation in Proterozoic belts of the West Kimberley Region of Western Australia.
Buxton have Farm-In and JV agreements over three separate Project areas (Merlin
Project, Quickshears Project and West Kimberley Regional Project) which fall within
the overall West Kimberly Project.
During the previous field season, IGO intersected massive sulphides in the maiden
drillhole at the Dogleg prospect (ASX 4 Oct 2023). A second hole intersected semimassive sulphides (ASX 19 Oct 2023). Assays received for the first Dogleg hole
contained 13.85m (true width 13.24m) at 4.35% Ni, 0.34% Cu, 0.15% Co from
177.34m, including: 5.86m (true width 5.60m) at 7.47% Ni, 0.31% Cu, 0.25% Co from
179.08m (ASX 6 Nov 2023). Buxton subsequently announced assay results for the
second hole 23WKDD004 returned 2.89 m (True Width 2.63 m) at 4.17% Ni, 0.83%
Cu, 0.14% Co from 233.63 m (see ASX 1 Feb 2024). These extremely high tenor results
lie outside the initial ground moving loop EM plate / drill target.
During the Quarter JV partner IGO Ltd announced the results of the 2024 field season
including the six diamond drill holes completed at Dogleg Ni-Cu-Co Prospect during,
totaling 2,245.60m
-
Best assay results were 3.40 m (True Width 3.06 m) at 1.47% Ni, 0.34% Cu,
0.05% Co from 289.78 metres in 24WKDD005
www.buxtonresources.com.au
P O Bo x 661
15 R o b i ns o n St
T. 08- 9380 6063
N edlands W A 6009
Bel mo nt W A 6104
E . info@buxtonresources .co m.a u
-
Downhole electromagnetic (DHEM) surveys have screened Dogleg for nearby
extensions, no follow-up anomalies identified
Ground electromagnetic (GEM) surveys at nearby Patrick and Tail prospects,
has effectively tested both targets
IGO are currently preparing plans for the 2025 field season in the West Kimberley JV
(ASX 14 Feb 2025).
Fraser Range Project (BUX retain 100% Iron Ore rights, 10% all other
metals / IGO 90% all other metals)
Exploration in the Fraser Range Project is targeting magmatic Ni-Cu sulphide
mineralisation along strike from IGO’s operating Nova mining operation. Buxton
remain free carried until completion of a feasibility study. During the Quarter, IGO
reported having commenced a strategic review of all Fraser Range JV Project tenure.
Buxton retains 100% interest in the iron-ore rights for the two Fraser Range BUX/IGO
JV tenements.
Prior to entering the JV with IGO, Buxton had undertaken substantive geophysical and
drilling programs that resulted in a significant magnetite discovery. The most recent
magnetite drilling was completed in 2011 (ASX 12 Sep 2011). Buxton then declared
and Exploration Target (ASX 3 Nov 2011) followed by a pre-JORC 2012 Inferred
Resource (ASX 5 Dec 2011). DTR met work indicates that a >67% mFe con could be
produced at grind sizes of 150-106 micron with DTR potentially over 30% (ASX 7 Dec
2011).
Project Generation
Buxton continues to undertake generative work across Western Australia and Arizona,
identifying new exploration opportunities and advancing early-stage project concepts.
Placement to Professional and Sophisticated Investors
Subsequent to the Quarter-end, Buxton secured firm commitments for a $3.0 million
Placement to professional and sophisticated investors at $0.025 per share. Proceeds
will fund ongoing project assessments and drilling and exploration programmes at
www.buxtonresources.com.au
P O Bo x 661
15 R o b i ns o n St
T. 08- 9380 6063
N edlands W A 6009
Bel mo nt W A 6104
E . info@buxtonresources .co m.a u
Centurion and Madman expected to commence in Q2 and Q3 of CY2025 respectively
(see ASX 7 Apr 2025)
Board Changes
During the previous Quarter, Buxton initiated a Chairman recruitment process,
appointing Sam Wright as interim Non-Executive Director.
During the Quarter, Buxton appointed Gervaise Heddle as Non-Executive Director
and Chair. Sam Wright resigned from the Board but remains Company Secretary (ASX
17 Mar 2025).
Corporate
The Company’s Quarterly Cashflow Report (Appendix 5B) follows this activities report.
The Company had $0.660 million in cash as at 31 March 2024. Exploration
Expenditure for the Quarter was AUD $0.198 million with most of this expenditure
being associated with the MRE upgrade at the Graphite Bull Project, along with other
ongoing project assessment. Buxton is also continuing to actively pursue copper and
other commodity opportunities in the USA.
The aggregate amount of payments to related parties and their associates included in
the current Quarter cash flows from operating activities were approximately $21k
comprising directors fees, salaries and superannuation. Corporate and other
administration expenditure was AUD $101k for the Quarter which represents general
costs associated with running the Company, including ASX fees, legal fees, rent,
marketing, etc. Cash outflows for the Quarter were in line with management
expectations. The company is adequately funded to continue its current activities and
will continue to demonstrate appropriate fiscal management.
This announcement is authorised by the Board.
contact:
Martin Moloney
Chief Executive Officer
marty@buxtonresources.com.au
For further information, please
Sam Wright
Company Secretary
sam@buxtonresources.com.au
www.buxtonresources.com.au
P O Bo x 661
15 R o b i ns o n St
T. 08- 9380 6063
N edlands W A 6009
Bel mo nt W A 6104
E . info@buxtonresources .co m.a u
Appendix 1
Changes in interests in mining tenements Buxton Resources Ltd
01/01/25 – 31/03/25
Te n e me n t
% at
be ginn in g
of Quarte r
Loc ation / Proje c t
% at e n d of
Qu arte r
In te re sts in min in g
te nements relinquished,
re du c e d or lapse d
In te re st in min in g
te nements ac qu ire d or
in c re ase d
* changes occurred between end of the Quarter and issuing this report
ELA04/2451
West Kimberley - Baracus / IGO JV
16
16
E04/2462
West Kimberley - Baracus / IGO JV
16
16
E04/2060
West Kimberley Regional - IGO JV
20
20
E04/2407
West Kimberley Regional - IGO JV
20
20
E04/2408
West Kimberley Regional - IGO JV
20
20
E04/2411
West Kimberley Regional - IGO JV
20
20
E04/2527
West Kimberley Regional - IGO JV
20
20
E04/2530
West Kimberley Regional - IGO JV
20
20
E04/2536
West Kimberley Regional - IGO JV
20
20
E04/2549
West Kimberley Regional - IGO JV
20
20
E04/2550
West Kimberley Regional - IGO JV
20
20
E04/2578
West Kimberley Regional - IGO JV
20
20
E04/2579
West Kimberley Regional - IGO JV
20
20
E04/2580
West Kimberley Regional - IGO JV
20
20
E04/2581
West Kimberley Regional - IGO JV
20
20
E04/2584
West Kimberley Regional - IGO JV
20
20
E04/2585
West Kimberley Regional - IGO JV
20
20
E04/2609
West Kimberley Regional - IGO JV
20
20
E04/2611
West Kimberley Regional - IGO JV
20
20
E04/2612
West Kimberley Regional - IGO JV
20
20
E04/2613
West Kimberley Regional - IGO JV
20
20
E04/2614
West Kimberley Regional - IGO JV
20
20
www.buxtonresources.com.au
P O Bo x 661
15 R o b i ns o n St
T. 08- 9380 6063
N edlands W A 6009
Bel mo nt W A 6104
E . info@buxtonresources .co m.a u
E04/2615
West Kimberley Regional - IGO JV
20
20
E04/2617
West Kimberley Regional - IGO JV
20
20
E04/2629
West Kimberley Regional - IGO JV
20
20
E04/2630
West Kimberley Regional - IGO JV
20
20
E04/2631
West Kimberley Regional - IGO JV
20
20
E04/2648
West Kimberley Regional - IGO JV
20
20
E04/2649
West Kimberley Regional - IGO JV
20
20
E04/2650
West Kimberley Regional - IGO JV
20
20
E04/2651
West Kimberley Regional - IGO JV
20
20
E04/1972
West Kimberley – IGO/NWC/TT JV
16
16
E04/2423
West Kimberley – IGO/NWC/TT JV
20
20
E28/1959
Fraser Range - IGO JV
10
10
E28/2201
Fraser Range - IGO JV
10
10
E09/2427
Narryer
100
100
E09/2428
Narryer
100
100
E09/2429
Narryer
100
100
E09/2922
Narryer
100
100
ELA09/2920
Narryer
100
100
E09/1985
Graphite Bull
100
100
L09/102
Graphite Bull
100
100
L09/103
Graphite Bull
100
100
E69/4182
Madman
100
100
E80/5545
Lateron
100
100
E80/5579
Centurion
100
100
L80/117
Centurion
100
100
LA80/125
Centurion
100
100
MEP 008121028
MEP 008123390
MEP 008124215
MEP 008124640
SM-01
through
SM-54
CW-01
through
CW-215
Copper
Chief #1-5
& Copper
Copper Wolf
(Section 16 T8NR1W G&SR Meridian)
Copper Wolf
(Section 9 T8NR1W G&SR Meridian)
Copper Wolf
(Section 29 T8NR1W G&SR Meridian)
Copper Wolf
(Section 13 T8NR1W G&SR Meridian)
Copper Wolf, Yavapai Co, Arizona
(Federal Lode Mining Claims)
100
100
100
100
100
100
100
100
100
100
Copper Wolf, Yavapai Co, Arizona
(Federal Lode Mining Claims)
100
100
Copper Wolf, Yavapai Co, Arizona
(Federal Lode Mining Claims)
0
100 (option)
www.buxtonresources.com.au
P O Bo x 661
15 R o b i ns o n St
T. 08- 9380 6063
N edlands W A 6009
Bel mo nt W A 6104
E . info@buxtonresources .co m.a u
Chief #1819
CW-216
through
CW-407
MTX 001 MTX 154
ELA45/6229
Copper Wolf, Yavapai Co, Arizona
(Federal Lode Mining Claims)
0
100
Matrix Project, Mohave Co, Arizona
(Federal Lode Mining Claims)
0
0 (earning
100%)
Royale
100
100
EL45/6231
Royale
100
100
ELA45/7017
Royale
100
100
ELA45/6233
Shogun
100
100
ELA45/7018
Shogun
100
100
Abbr eviat ions and D efinit ions us ed in T enement Schedule:
E = Exploration Licence (WA), ELA = Exploration Licence Application (WA), L – Miscellaneous License (WA), LA – Miscellaneous
License Application (WA), MEP = Mineral Exploration Permit (Arizona)
www.buxtonresources.com.au
P O Bo x 661
15 R o b i ns o n St
T. 08- 9380 6063
N edlands W A 6009
Bel mo nt W A 6104
E . info@buxtonresources .co m.a u
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Buxton Resources Limited
ABN
Quarter ended (“current quarter”)
86 125 049 550
31 March 2025
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts f rom customers
1.2
Payments f or
Year to date
(9 months)
$A’000
10
234
(198)
(2,300)
(b) development
-
-
(c) production
-
-
(d) staf f costs
(149)
(695)
(e) administration and corporate costs
(101)
(464)
(a) exploration & evaluation
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
3
16
1.5
Interest and other costs of f inance paid
(5)
(15)
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other - GST
18
64
1.9
Net cash provided by/(used in) operating
activities
(422)
(3,160)
2.
Cash flows from investing activities
2.1
Payments to acquire or f or:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
(7)
(d) exploration & evaluation
-
-
(e) investments
-
-
(f )
-
-
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Year to date
(9 months)
$A’000
Current quarter
$A’000
Proceeds f rom the disposal of :
(a) entities
-
-
(b) tenements interests
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash f lows f rom loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash provided by/(used in) investing
activities
-
(7)
3.
Cash flows from financing activities
3.1
Proceeds f rom issues of equity securities
(excluding convertible debt securities)
-
966
3.2
Proceeds f rom issue of convertible debt
securities
-
-
3.3
Proceeds f rom exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
(52)
3.5
Proceeds f rom borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9i
Other – repayment of ROU lease
(13)
(41)
3.9ii
Other – loan repayment (CEO)
23
68
3.10
Net cash from financing activities
10
941
4.
Net increase/(decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
pe