Presentation - Battery Gigafactories Asia Pacific 2023
Released
Released
Announcement PDF
Tier 1 natural graphite
Tier 1 jurisdiction
Benchmark Gigafactories Asia Pacific 2023
Martin Moloney, CEO
DEVELOPING AND DISCOVERING CRITICAL MINERALS
DIRECTORS / SENIOR MANAGEMENT
Seamus Cornelius
Non-Executive Chairman
Eamon Hannon
Non-Executive Director
Anthony Maslin
Non-Executive Director
Stuart Fogarty
Non-Executive Director
Sam Wright
Company Secretary
Martin Moloney
CEO
Mark Thomas
Corporate and Finance Manager
REGISTERED OFFICE
TOP 5 SHAREHOLDERS
Suite 1, First Floor
• IGO – 18.19%
14-16 Rowland St
Subiaco WA 6008
• A & R Dearlove Pty Ltd
Postal Address PO Box 661 Nedlands WA 6909
• Citicorp Nominees Pty Ltd
Website: www.buxtonresources.com.au
ASX : BUX
171.3M shares
10.7M options
CAB: A$3.1M (30/6)
Mkt Cap: A$36.0M @ 21c 20/09/23
• National Business Holding Ltd
Phone +61 (0)8 9380 6063
Email: info@buxtonresources.com.au
CAPITAL STRUCTURE & FINANCIALS
• BNP Paribas Nominees Pty Ltd
We believe in a clean energy future and by
delivering the products needed for tomorrow’s
battery systems, we are making it happen.
PROJECT PIPELINE
RESOURCE
DEFINITION
DEVELOPMENT
DRILL TARGET
DEFINITION
West Kimberley JVs $3M over 4 years
Fraser Range JV
$17.8M spend to
date
Centurion
Narryer
100% BUX
IGO Spending
$5.35M over 3
years for 70%
Shogun
100% BUX
Royale
Committed JV forward spend ~$6M
JV spend to date > $24M
Lateron
BUX’s tenure interests > 8,250 km2
BUX Annual Tenement Commitments < $850k
All $ in AUD
GRAPHITE BULL
(100% BUX)
Western Australia – a Tier 1 Mining Jurisdiction
28 km to major regional road
500 km to Geraldton, 900 km to Perth
Baseline Flora and Fauna surveys completed - no areas of
concern
Initial groundwater investigations indicate ample local
supplies at <1,000 TDS
Excellent engagement with stakeholders (Native Title,
Pastoral and Local / State / Federal Government)
GRAPHITE BULL
(BUX 100%)
GRAPHITE BULL
Development story that gets better every time we touch it
1) High grade, at surface – 4 Mt @ 16.2% TGC
2) Excellent extensional upside
3) Outstanding flotation performance
Ease of concentrating
Concentrate grade and recovery
Flake size ideal for PSG
Sighter Flotation Results (ASX 13/03/2023)
(100% BUX)
Consultant
(Test)
Grade
(% TGC)
TGC
Recovery (%)
% Rec @ 95%
TGC Con
BL (BF2370)
98.2
90.7
93.7
IMO (FT02)
96.8
89.5
92.3
Exploration Drilling at GB003RC (ASX 02/03/2023)
4 Mt @ 16.2% TGC Resource
GRAPHITE BULL
(100% BUX)
Clear Opportunity for Resource Expansion at Shallow Depth
2014 Resource (4 Mt @ 16.2 % TGC) defined over 400m
strike / 170 - 200m depth
Geophysics (EM) & drilling defines resource expansion
targets over 2.3 km of strike and 1.5 km depth extent
Long section looking N
Plan view recent RC collars, Ground EM plates, extent of 2014 resource and historical intercepts (ASX 14/03/2023)
Ground EM results (ASX 07/02/2023)
Scout RC program highlights
GB001RC 33m @ 18.7% TGC from 11m
GB003RC 18m @ 16.2% TGC from 145m
GB004RC 32m @ 17.7% TGC from 49m
and 5m @ 24.8% TGC from 20m
NSI = No Significant Intercept
GB005RC 5m @ 24.5% TGC from 123m
GRAPHITE BULL
(100% BUX)
Metallurgical studies underway at ProGraphite and Anzaplan
First round of PSG test work results received August 2024…
99.97% TGC purity basic alkaline (caustic soda) roast at 250°C
Particle size distribution of SPG 15 (ASX 07/08/2023)
Spheronising gives excellent shape and size distribution, yield
is good and in line with industry expectations
Concentrate micronised well with little energy input
50% recovery through to SPG - opportunities to optimize
0.1 mm / 100 microns
SEM image of spheronised Graphite Bull concentrate (ASX 07/08/2023)
NEXT STEPS…
1) Electrochemistry
2) Resource expansion
3) Partnership discussions
Offtake
Equity Investment
We can provide 10-100 kg
samples of natural graphite
concentrate for downstream
anode test work
Feasibility
Production
THANKYOU FOR YOUR ATTENTION
FORWARD LOOKING STATEMENTS
COMPETENT PERSONS STATEMENT
The information in this report that relates to Exploration Results is based on information compiled by Mr Martin
This presentation has been prepared by Buxton Resources (“Buxton”). The information contained in this
Moloney, Member of the Australasian Institute of Geoscientists. Mr Moloney is a full-time employee of Buxton
presentation is a professional opinion only and is given in good faith. Certain information in this document
Resources Limited. Mr Moloney has sufficient experience which is relevant to the activity being undertaken to
has been derived from third parties and though Buxton has no reason to believe that it is not accurate,
qualify as a “Competent Person”, as defined in the 2012 edition of the Joint Ore Reserves Committee (JORC)
reliable or complete, it has not been independently audited or verified by Buxton. Any forward-looking
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Moloney consents
statements included in this document involve subjective judgement and analysis and are subject to
to the inclusion in this report of the matters based on the information in the form and context in which it appears.
uncertainties, risks and contingencies, many of which are outside the control of, and may be unknown to,
All exploration results and geological information has been previously reported in numerous Company ASX
Buxton. In particular they refer only to the date of this document, they assume the success of Buxton’s
announcements under the 2012 JORC Code. This information has not materially changed since it was initially
strategies, and they are subject to significant regulatory, business, competitive and economic risks and
reported.
uncertainties. Actual future events may vary materially from those in the forward looking statements.
Recipients of this document are cautioned not to place undue reliance on such forward-looking
statements. Buxton makes no representation or warranty as to the accuracy, reliability or completeness of
information in this document and does not take responsibility for updating any information or correcting
any error or omission which may become apparent after this document has been issued. To the extent
permitted by law, Buxton and its officers, employees, related corporations and agents disclaim all liability,
whether direct, indirect or consequential for any loss or damage arising out of, or in connection with, any
use or reliance on this presentation or information. All amounts are in A$ unless otherwise stated
AUTHORISED BY
The Board of Directors of Buxton Resources.
Previously Reported Results
There is information in this announcement relating to results (including those relating to historical drilling)
previously announced on:
24th October 2014 - Buxton Significantly Expands Graphite Resource at Yalbra
7th February 2023 – Exploration Update - Graphite Bull Project
19th April 2023 - Graphite Bull - Drilling Assays
7th August 2023 – Downstream Processing Success at Graphite Bull Project
Buxton Resources Ltd confirms that it is not aware of any new information or data that materially affects the
information included in this announcement or the announcement referenced above.
Share your feedback
Discover