Quarterly Activities Report & Appendix 5B
Released
Released
Announcement PDF
ASX Release
29 July 2025
QUARTERLY ACTIVITIES REPORT
for the period ending 30 June 2025
Buxton Resources Limited (ASX: BUX & BUXO) (“Company” or “Buxton”) is pleased
to provide its Quarterly Activities Report and Appendix 5B for the period ended 30
June 2025 (the Quarter).
Centurion Project (100% BUX)
•
Earthworks completed in preparation for a maiden drill program targeting a
large-scale IOCG system.
Madman Project (100% BUX)
•
Heritage survey completed. Results expected August 2025.
Graphite Bull Project (100% BUX)
•
Continued downstream qualification testwork by a major international anode
manufacturer. Expanded test program returned successful results postQuarter.
Copper Wolf Project (IGO 51%, BUX 49%)
•
IGO continues planning for follow-up geophysical and drilling activities.
Fraser Range Project (100% BUX)
•
IGO formally withdrew from the Fraser Range JV. Buxton retains 100%
interest and substantial geophysical and drilling dataset.
Corporate
•
•
•
$3.0 million capital raising completed at $0.025/share
Extraordinary General Meeting held 30 May 2025
Cash balance (30 June 2025) of approximately AUD $2.706 million
PO Box 661
15 Robinson St
T. 08-9380 6063
Nedlands WA 6009
Belmont WA 6104
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Centurion Project (BUX 100%)
The Centurion Project consists of a single EL covering ~80 km2 located in the Great
Sandy Desert between Kiwirrkurra and Balgo. The EL covers a prominent dipolar and
offset magnetic and gravity anomaly pattern which is characteristic of Iron Oxide
Copper Gold (IOCG) deposits such as Olympic Dam and Prominent Hill.
The principal target is defined by magnetic & gravity anomaly 3,500 m by 5,000 m in
extent and 1500 nanoTesla magnetic and ~10 milligal gravity in amplitude (based on
open file GSWA datasets).
Although little is known of the pre-Canning geology, the Centurion Project is situated
in an excellent regional structural setting. Magnetic data indicates that the target is
located between 520 - 700 metres beneath ground level under post mineral cover
sequences of the Canning Basin.
A previous drillhole by CRA in 1991 encountered drilling difficulties due to the use
of air percussion in aquifers, and single shift operation. Their hole 91VE001DD was
terminated at 432.30 m having failed to reach basement. The geological logs noted
chlorite-pyrite altered clasts in a boulder conglomerate assigned to the Permian
Grant Formation toward the end of the hole. This observation provides strong
encouragement that the geophysical response may be related to a hydrothermal
system, and that the basement interface may not be far below the base of that hole.
Buxton has entered in Heritage Protection Agreements with the Ngurra Kayanta and
Parna Ngururrpa Aboriginal Corporations. Provision for Buxton personnel and
contractors to pass through lands of the Kiwirrkurra People is provided by a third
access agreement. Buxton has also received permits from the Aboriginal Lands Trust
to complete statutory requirements to access the Project.
Buxton announced that it had received all heritage clearances required to allow for
the commencement of drilling activities (see ASX 10 Oct 2024). Buxton has also
received an Exploration Incentive Scheme grant for up to AUD $220k to offset the
cost of this drilling program (ASX 21 May 2025).
During the Quarter, Buxton completed earthworks in preparation for drilling to
undertake the maiden drilling program, which is scheduled to commence in Q3 CY25
2025 (ASX 16 Jun 2025).
PO Box 661
15 Robinson St
T. 08-9380 6063
Nedlands WA 6009
Belmont WA 6104
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Madman Project (BUX 100%)
The Madman Project consists of Exploration License E69/4182 and application
E69/4283 covering ~525km2) located on unclaimed crown land in the Little Sandy
Desert approximately ~375km NE of Wiluna in Western Australia.
Interpretation of publicly available magnetic data indicated a relatively shallow
aeromagnetic anomaly similar in amplitude and geological setting to the Winu and
Havieron discoveries in the northern Paterson Province. Buxton has previously
received PoW clearances to undertake initial drill testing and has an Exploration
Incentive Scheme grant for up to AUD $180k to offset the cost of this drilling
program (ASX 1 May 2025).
During the Quarter Buxton undertook a Heritage Survey, the completion of which
was announced subsequent to the Quarter (ASX 1 Jul 2025). Results are expected
in August.
Copper Wolf Project (IGO 51%, BUX 49%, IGO earning 70%)
Buxton’s Copper Wolf Project consists of Lode Mining Claims and Mineral
Exploration Permits in Yavapai County, Arizona. The Copper Wolf Project has
multiple historical resource estimates available that confirm the presence of a large
Laramide porphyry Cu-Mo system (see ASX 25 Oct 2021).
Porphyry Cu-Mo mineralisation at Copper Wolf is largely concealed by a post-mineral
(Tertiary) sequence of volcanic and sedimentary rocks. The Project is located within
one of the most prolifically endowed copper belts in the world, yet it has not seen
any drilling since the early 1990s. Buxton’s 2022 airborne magnetic survey was the
first geophysical work undertaken since the early 1960s. Historic exploration has
consisted of relatively wide spaced drilling which focussed on significant supergene
copper mineralisation. Buxton is targeting high grade, underground bulk mineable
copper-molybdenum mineralisation.
On the 4 Oct 2022, Buxton received shareholder approval for Buxton and IGO to
enter into an earn-in and joint venture agreement for the Copper Wolf Project.
PO Box 661
15 Robinson St
T. 08-9380 6063
Nedlands WA 6009
Belmont WA 6104
E. info@buxtonresources.com.au
www.buxtonresources.com.au
The Copper Wolf JV Project comprises tenure subject to the IGO JV (~12.5 km2, and
includes the supergene blanket which has been the focus of previous exploration
including historical resource estimates).
IGO had previously sole-funded a drilling program that resulted in exceptional
intersections of porphyry mineralisation with assay results including 405.38 m @
0.35% Cu and 0.05% Mo in CPW002DD and 83.76m @ 0.4% Cu and 0.06% Mo in
CPW001DD (ASX 14 Dec 2023).
IGO have met the Stage 1 Earn-in Requirement of the Copper Wolf Agreement (see
ASX 22 Aug 2022 and 2 Sep 2022), that being expenditure of AUD $350k (exclusive
of GST) and that IGO have thereby earned a 51% interest in the BUX / IGO JV
Tenements.
During the Quarter, IGO continued to assess the feasibility of undertaking
geophysical surveys and planning for drilling activities.
Copper Wolf Project (BUX 100%)
Buxton’s interests in the Copper Wolf Project area also include BUX 100% (non-IGO
JV) tenure over ~30.5 km2 covering substantial basement exposures where Buxton’s
exploration results indicate potential for copper-molybdenum porphyry
mineralisation at shallow depths such as at the Wolverine and Sun Devil / Aztecs
prospects (Figure 1). Buxton also owns a 33.62 acre surface parcel with associated
access and groundwater infrastructure / rights within the area of the JV tenure, but
which is not subject to the JV. These tenements are encumbered by a Right of First
Refusal (‘RoFR’) established by the earn-in and joint venture agreement (ASX 4 Oct
2022) and which expires 4 Oct 2027.
PO Box 661
15 Robinson St
T. 08-9380 6063
Nedlands WA 6009
Belmont WA 6104
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Figure 1: Copper Wolf Project tenure situation showing ~30.5 km2 area (pale orange coloured
polygons) for which Buxton has 100% interest in the subsurface estate. These areas include substantial
basement exposures indicating potential for copper-molybdenum porphyry mineralisation at
shallower depths in comparison to the Bobcat, Rattler and Coyote prospects. The BUX / IGO JV
covers ~12.5 km2, and includes the supergene blanket which has been the focus of previous
exploration including historical resource estimates. BRAL owns a 33.62 acre surface parcel with
associated access and water rights.
Graphite Bull Project (BUX 100%)
The Graphite Bull Project (Exploration License E09/1985) is located 280 km East of
Carnarvon in the Murchison Region of Western Australia. In 2013 and 2014, Buxton
released Mineral Resource Estimates for the main zone of graphite mineralisation.
Buxton also undertook initial metallurgical studies at this time aimed at coarse flake
production. In 2023 and 2024 Buxton completed diamond and RC drilling programs
aimed at expanding the Resource utilising geophysical surveying and geological
mapping tied with resampling and analysis of the historical sample inventory.
PO Box 661
15 Robinson St
T. 08-9380 6063
Nedlands WA 6009
Belmont WA 6104
E. info@buxtonresources.com.au
www.buxtonresources.com.au
In 2024, Buxton announced the results from assaying from the most recent programs
(see ASX 24 Oct 2024 and 12 Dec 2024). Standout, shallow, high-grade results
include:
•
•
•
•
GB012RC: 124 m @ 16.6% TGC from 44 m
GB013RC: 56 m @ 14.4% TGC from 8 m
GB011RC: 50 m @ 24.9% TGC from 38 m
GB009RC: 10 m @ 37.3% TGC from 12 m, including 6 m @ 47.3% TGC
In 2025, during the previous Quarter, Buxton reported on the significant expansion
of the Graphite Bull Project’s Mineral Resource Estimate (MRE). The updated MRE
was prepared by ERM, and has significantly increased the scale of the project, with
Total Resources now 20.7 Mt @ 10.8% TGC at a 7% TGC cutoff and contained
graphite increasing by 345% to 2.25 Mt (Table 1, ASX 17 Feb 2025). Excellent
continuity of mineralisation is evident, with average thickness of ~45 m over 1.65 km
strike.
Improved confidence from Buxton’s substantive and recent metallurgical,
groundwater, environmental, market and mining studies have led to the Project’s
maiden Indicated Resources to be defined which now account for 40% of the total
Resource reinforcing the project’s economic potential.
Table 1: Graphite Bull 2025 Mineral Resource estimate, TGC ≥ 7%
JORC Resource
Classification
Tonnage
(Mt)
Average TGC Grade
(%)
Contained Graphite
(TGC Mt)
Indicated
7.6
11.6
0.89
Inferred
13.1
10.4
1.34
Total
20.7
10.8
2.25
Buxton has previously announced results from Spheroidised Purified Graphite (SPG)
testwork by Dorfner Anzaplan GmbH (ASX 15 Jan 2025).
During the Quarter a major anode manufacturer continued qualification testwork on
Graphite Bull ore and flake concentrate. An ore sample of ~738 kg from 2024 Infill
Resource drilling was delivered in late 2024 (ASX 31 Oct 2024). This manufacturer
advised that the flotation testwork results on this material strongly support their
PO Box 661
15 Robinson St
T. 08-9380 6063
Nedlands WA 6009
Belmont WA 6104
E. info@buxtonresources.com.au
www.buxtonresources.com.au
interest in undertaking further testwork. Buxton subsequently supplied an additional
~100 kg of Graphite Bull flake concentrate to support an expanded downstream
testwork program (spheronization, coating & battery / electrochemical testwork ASX 1 Apr 2025). Subsequent to the Quarter, the manufacturer advised of successful
results from this expanded program (ASX 10 Jul 2025).
Subsequent to the Quarter, the DMPE advised that the Extension of Term for
E09/1985 was granted through to 23/1/2027.
Blackhawk Project (BUX 100%)
The Blackhawk (formerly Narryer) Project was initially staked to target magmatic NiCu-PGE sulphide mineralisation along the Yilgarn Craton margin within the
Murchison Region of WA. Buxton has completed substantive systematic exploration
programs since 2021, including regional gravity / airborne EM programs and two
rounds ground EM.
Buxton completed the first drilling program on the Project at the Ranger Prospect in
2024 (see ASX 23 August 2024). Assays confirmed that NY001RC intersected 60
metres @ 4.34% TGC from 192 m, including 20 metres @ 9.06% TGC from 231 m
(ASX 4 Oct 2024). Buxton’s review of geophysical datasets suggests that this
graphite mineralisation extends close to surface at Ranger, and 19.1 km of strike was
defined as prospective for similar mineralisation which represents a new provincescale, 100% owned graphite play.
Matrix Project (BUX earning 100%)
In May 2024, Buxton announced that it had entered into a binding Earn-In
Agreement to acquire 100% of the Matrix Manganese Project ("Matrix") located in
Mohave County, Arizona, from Solution Mining Pty Ltd ("Solution") (see ASX 14 May
2024).
The Matrix Project consists of 154 Lode Mining Claims (MTX 001 - MTX 154) covering
~12 km2 in Mohave County, Arizona. The Matrix Project claims cover the interpreted
western extension of the Artillery Peak manganese mineralisation.
The material terms of the Agreement are as follows:
PO Box 661
15 Robinson St
T. 08-9380 6063
Nedlands WA 6009
Belmont WA 6104
E. info@buxtonresources.com.au
www.buxtonresources.com.au
•
•
•
•
Buxton will Earn-In to 100% ownership of 154 BLM Lode Mining Claims by
spending AU$1.0M over a maximum of 2 years (14th May 2026).
Buxton will issue Solution AU$150k equivalent in shares within 20 days after
the agreement is executed (priced at the 20-day VWAP), and a 1.5% NSR
royalty. Buxton retains a right of first refusal over this royalty.
Buxton will issue Solution a second tranche of AU$100k in shares at the 2 years
anniversary, or on completing the Earn-In, whichever comes earliest.
Mandatory commitments are limited to the claim maintenance fees (currently
US$25,410).
Should BUX subsequently either;
• IPO the project: Solution will get 10% of the new entity's capital structure,
plus priority right to subscribe to an additional 9.9% on the same terms as for
other investors of that IPO; or
• Progress the project: Solution to get milestone payments payable, at BUX's
discretion in BUX shares or cash, as follows; 3% (of fair market value of the
project) at Resource, 2% at Feasibility Study and 1% at Decision to Mine
Manganese was first discovered in the region around 1880 at Artillery Peak. The
deposits at the Artillery Peak occur as two distinct types of deposit, stratiform
manganese deposits and vein manganese deposits. In 2011 American Manganese
Inc. (now Recyclico AMY.V) defined Indicated & Inferred Resources of 277 Mt @ 2.8%
Mn. A Tetra Tech study in 2012 focused on a smaller area with Indicated and Inferred
Resources of 82 Mt @ 2.3% Mn (with 198 Mt remaining current outside this area).
In the 1980s the US Bureau of Mines (USBoM) evaluated the feasibility of in-situ and
heap leaching for Mn extraction from domestic US ores. Of the 25 deposits
examined, the material tested from the Artillery Peak project area presented the
fastest and highest Mn recovery characteristics in column leaching, and was the only
deposit selected for further evaluation targeting suitability for in-situ recovery (ISR)
methods - work which was curtailed when the USBoM was abolished in 1996.
During the Quarter Buxton continued engaging with the BLM to secure permitting
and approvals for a maiden drilling program. These BLM approvals are now pending
a bond payment which can be made anytime at Buxton’s discretion ahead of the
commercial decision to commence a drilling program.
PO Box 661
15 Robinson St
T. 08-9380 6063
Nedlands WA 6009
Belmont WA 6104
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Shogun & Royale Projects (BUX 100%)
The Shogun and Royale Projects are located in the Paterson Region of Western
Australia. Exploration at Shogun Project is targeting magmatic Ni-Cu-Co-PGE
sulphide deposits. The Royale Project covers exploration targets for hydrothermal
Cu +/- Au – Mo deposits.
Buxton has finalised negotiations and executed a Land Access & Mineral Exploration
Agreement with Jamukurnu-Yapalikunu Aboriginal Corporation (JYAC).
During the Quarter, Buxton announced the grant of one of the Royale ELs (ASX 28
Apr 2025). An second license was subsequently granted at Royale, the first license
Shogun was also granted.
During the Quarter, Buxton undertook planning for a geophysical survey in Q3/Q4
2025.
Lateron Project (BUX 100%)
The Lateron Project consists of Exploration License E80/5545 located on unclaimed
crown land close to the Tanami Road, approximately 10 km East of Billiluna and 150
km South of Halls Creek in Western Australia. Buxton previously undertook
petrological analysis on fragments of diamond drill core recovered from the site of
AFMECO’s 1982 diamond drillhole S19. The report indicates the core fragments
consist of “biotite hornblende quartz diorite, with coarse titanite and sericite /
muscovite pyrite-magnetite-chalcopyrite overprint” – such rocks are typically
associated with magmatic-hydrothermal Cu-Au mineralisation. Airborne magnetics
indicates these intrusive rocks cover > 7 km2.
During the Quarter Buxton received approval from DEMIRS for co-funding up to
$28,117 towards an airborne geophysical survey over the project.
West Kimberley Project (BUX / IGO JV)
The West Kimberley Project is targeting Nova-style magmatic Ni-Cu sulphide
mineralisation in Proterozoic belts of the West Kimberley Region of Western
Australia. Buxton have Farm-In and JV agreements over three separate Project areas
PO Box 661
15 Robinson St
T. 08-9380 6063
Nedlands WA 6009
Belmont WA 6104
E. info@buxtonresources.com.au
www.buxtonresources.com.au
(Merlin Project, Quickshears Project and West Kimberley Regional Project) which fall
within the overall West Kimberly Project.
During the previous field season, IGO intersected massive sulphides in the maiden
drillhole at the Dogleg prospect (ASX 4 Oct 2023). A second hole intersected semimassive sulphides (ASX 19 Oct 2023). Assays received for the first Dogleg hole
contained 13.85m (true width 13.24m) at 4.35% Ni, 0.34% Cu, 0.15% Co from
177.34m, including: 5.86m (true width 5.60m) at 7.47% Ni, 0.31% Cu, 0.25% Co from
179.08m (ASX 6 Nov 2023). Buxton subsequently announced assay results for the
second hole 23WKDD004 returned 2.89 m (True Width 2.63 m) at 4.17% Ni, 0.83%
Cu, 0.14% Co from 233.63 m (see ASX 1 Feb 2024). These extremely high tenor
results lie outside the initial ground moving loop EM plate / drill target.
IGO Ltd previously announced the results of the 2024 field season including the six
diamond drill holes completed at Dogleg Ni-Cu-Co Prospect during, totaling
2,245.60m
-
Best assay results were 3.40 m (True Width 3.06 m) at 1.47% Ni, 0.34% Cu,
0.05% Co from 289.78 metres in 24WKDD005
Downhole electromagnetic (DHEM) surveys have screened Dogleg for nearby
extensions, no follow-up anomalies identified
Ground electromagnetic (GEM) surveys at nearby Patrick and Tail prospects,
has effectively tested both targets
IGO are currently preparing plans for the 2025 field season in the West Kimberley JV
(ASX 14 Feb 2025).
Subsequent to the Quarter, the JV withdrew several Exploration License applications
(see Appendix 1).
Fraser Range Project (BUX 100%)
Exploration in the Fraser Range Project has predominantly targeted magmatic Ni-Cu
sulphide mineralisation along strike from IGO’s operating Nova mining operation.
The project has been subject to a JV with IGO established by a ‘Letter Agreement –
Joint Venture – Fraser Range tenements’ (Fraser Range JVA) between IGO and
Buxton dated 19 August 2016. During the Quarter, IGO completed a strategic review
of all Fraser Range JV Project tenure and commenced the process to withdraw from
the JV. On 12th June 2025, IGO notified Buxton that it has elected to terminate and
PO Box 661
15 Robinson St
T. 08-9380 6063
Nedlands WA 6009
Belmont WA 6104
E. info@buxtonresources.com.au
www.buxtonresources.com.au
withdraw from the Fraser Range JVA in accordance with paragraph 10 of the Fraser
Range JVA on and from 30 June 2025. As a result Buxton has reverted to 100%
ownership of all interests in E28/1959 and E28/2201, including IGO’s database that
spans significant geophysical surveys, plus 572 AC holes for 66,677m, 18 RC holes
for 3,246m and 21 DD for 12,283m from these two tenements.
Prior to entering the JV with IGO, Buxton had itself undertaken substantive
geophysical and drilling programs that resulted in a significant magnetite discovery.
The most recent magnetite drilling was completed in 2011 (ASX 12 Sep 2011).
Buxton then declared and Exploration Target (ASX 3 Nov 2011) followed by a preJORC 2012 Inferred Resource (ASX 5 Dec 2011). DTR met work indicates that a
>67% mFe con could be produced at grind sizes of 150-106 micron with DTR
potentially over 30% (ASX 7 Dec 2011).
Project Generation
Buxton continues to undertake generative work across Western Australia and
Arizona, identifying new exploration opportunities and advancing early-stage project
concepts.
During the Quarter this work has resulted in applications over several new Project
areas in Western Australia (Fairlight, Montello, Valiant & Mantis). These areas are
now the subject of focussed compilation and assessment work.
Placement to Professional and Sophisticated Investors
During the Quarter, Buxton completed a $3.0 million Placement to professional and
sophisticated investors at $0.025 per share. Proceeds are allocated to fund ongoing
project assessments and earthworks and drilling at Centurion and heritage surveys
and earthworks / drilling at Madman in Q2 / Q3 of CY2025 (see ASX 7 Apr 2025)
Corporate
The Company’s Quarterly Cashflow Report (Appendix 5B) follows this Activities
Report. The Company had $2.706 million in cash as at 30 June 2025. Exploration
Expenditure for the Quarter was AUD $0.681 million with most of this expenditure
being associated with the earthworks at Centurion and the heritage survey at
Madman, along with project generation that resulted in several new applications in
PO Box 661
15 Robinson St
T. 08-9380 6063
Nedlands WA 6009
Belmont WA 6104
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Western Australia. Buxton is also continuing to actively pursue copper and other
commodity opportunities in the USA.
The aggregate amount of payments to related parties and their associates included
in the current Quarter cash flows from operating activities were approximately $43k
comprising directors fees, salaries and superannuation. Corporate and other
administration expenditure was AUD $209k for the Quarter which represents general
costs associated with running the Company, including ASX fees, legal fees, rent,
marketing, etc. Cash outflows for the Quarter were in line with management
expectations. The company is adequately funded to continue its current activities
and will continue to demonstrate appropriate fiscal management.
This announcement is authorised by the Board. For further information, please
contact:
Martin Moloney
Chief Executive Officer
marty@buxtonresources.com.au
Sam Wright
Company Secretary
sam@buxtonresources.com.au
PO Box 661
15 Robinson St
T. 08-9380 6063
Nedlands WA 6009
Belmont WA 6104
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Appendix 1
Changes in interests in mining tenements Buxton Resources Ltd during the Quarter
Interests in mining
tenements relinquished,
reduced or lapsed
Tenement
Location / Project
E09/2722
Narryer (Relinquished)
% at
beginning
of Quarter
100
E09/2428
Narryer (Voluntary Partial Surrender)
100
100
E09/2427
Narryer (Voluntary Partial Surrender)
100
100
E04/2579
West Kimberley Regional JV
(Withdrawn after the Quater)
West Kimberley Regional JV
(Withdrawn after the Quater)
West Kimberley Regional JV
(Withdrawn after the Quater)
West Kimberley Regional JV
(Withdrawn after the Quater)
20
0*
20
0*
20
0*
20
0*
E09/3020
Valiant
0
100
E45/7100
Fairlight
0
100
E69/4283
Madman
0
100
E69/4295
Montello
0
100
L69/66
Madman (subsequently withdrawn
after the Quarter)
Mantis (applied for after the Quarter)
0
0*
0
0*
Centurion (applied for after the
Quarter)
0
0*
E04/2648
E04/2649
E04/2650
Interest in mining
tenements acquired or
increased
E45/7152
E80/6156
* changes occurred between end of the Quarter and issuing this report
ELA04/2451
West Kimberley - Baracus / IGO JV
16
% at end of
Quarter
0
16
E04/2462
West Kimberley - Baracus / IGO JV
16
16
E04/2060
West Kimberley Regional - IGO JV
20
20
E04/2407
West Kimberley Regional - IGO JV
20
20
E04/2408
West Kimberley Regional - IGO JV
20
20
E04/2411
West Kimberley Regional - IGO JV
20
20
E04/2527
West Kimberley Regional - IGO JV
20
20
E04/2530
West Kimberley Regional - IGO JV
20
20
E04/2536
West Kimberley Regional - IGO JV
20
20
E04/2549
West Kimberley Regional - IGO JV
20
20
E04/2550
West Kimberley Regional - IGO JV
20
20
E04/2578
West Kimberley Regional - IGO JV
20
20
ELA04/2579
West Kimberley Regional - IGO JV
20
20*
E04/2580
West Kimberley Regional - IGO JV
20
20
E04/2581
West Kimberley Regional - IGO JV
20
20
PO Box 661
15 Robinson St
T. 08-9380 6063
Nedlands WA 6009
Belmont WA 6104
E. info@buxtonresources.com.au
www.buxtonresources.com.au
E04/2584
West Kimberley Regional - IGO JV
20
20
E04/2585
West Kimberley Regional - IGO JV
20
20
E04/2609
West Kimberley Regional - IGO JV
20
20
E04/2611
West Kimberley Regional - IGO JV
20
20
E04/2612
West Kimberley Regional - IGO JV
20
20
E04/2613
West Kimberley Regional - IGO JV
20
20
E04/2614
West Kimberley Regional - IGO JV
20
20
E04/2615
West Kimberley Regional - IGO JV
20
20
E04/2617
West Kimberley Regional - IGO JV
20
20
E04/2629
West Kimberley Regional - IGO JV
20
20
E04/2630
West Kimberley Regional - IGO JV
20
20
E04/2631
West Kimberley Regional - IGO JV
20
20
ELA04/2648
West Kimberley Regional - IGO JV
20
20*
ELA04/2649
West Kimberley Regional - IGO JV
20
20*
ELA04/2650
West Kimberley Regional - IGO JV
20
20*
E04/2651
West Kimberley Regional - IGO JV
20
20
E04/1972
West Kimberley – IGO/NWC/TT JV
16
16
E04/2423
West Kimberley – IGO/NWC/TT JV
20
20
E28/1959
Fraser Range - IGO JV
10
10
E28/2201
Fraser Range - IGO JV
10
10
E09/2427
Narryer
100
100
E09/2428
Narryer
100
100
E09/2429
Narryer
100
100
ELA09/2920
Narryer
100
100
E09/1985
Graphite Bull
100
100
L09/102
Graphite Bull
100
100
L09/103
Graphite Bull
100
100
E69/4182
Madman
100
100
ELA69/4283
Madman
100
100
E80/5545
Lateron
100
100
E80/5579
Centurion
100
100
L80/117
Centurion
100
100
L80/125
Centurion
100
100
MEP 008121028
MEP 008123390
MEP 008124215
MEP 008124640
Copper Wolf
(Section 16 T8NR1W G&SR Meridian)
Copper Wolf
(Section 9 T8NR1W G&SR Meridian)
Copper Wolf
(Section 29 T8NR1W G&SR Meridian)
Copper Wolf
(Section 13 T8NR1W G&SR Meridian)
100
100
100
100
100
100
100
100
PO Box 661
15 Robinson St
T. 08-9380 6063
Nedlands WA 6009
Belmont WA 6104
E. info@buxtonresources.com.au
www.buxtonresources.com.au
SM-01
through
SM-54
CW-01
through
CW-215
Copper
Chief #1-5
& Copper
Chief #1819
CW-216
through
CW-407
MTX 001 MTX 154
E45/6229
Copper Wolf, Yavapai Co, Arizona
(Federal Lode Mining Claims)
100
100
Copper Wolf, Yavapai Co, Arizona
(Federal Lode Mining Claims)
100
100
Copper Wolf, Yavapai Co, Arizona
(Federal Lode Mining Claims)
0
100 (option)
Copper Wolf, Yavapai Co, Arizona
(Federal Lode Mining Claims)
0
100
Matrix Project, Mohave Co, Arizona
(Federal Lode Mining Claims)
0
0 (earning
100%)
Royale
100
100
E45/6231
Royale
100
100
ELA45/7017
Royale
100
100
E45/6233
Shogun
100
100
ELA45/7018
Shogun
100
100
Abbreviations and Definitions used in Tenement Schedule:
E = Exploration Licence (WA), ELA = Exploration Licence Application (WA), L – Miscellaneous License (WA), LA –
Miscellaneous License Application (WA), MEP = Mineral Exploration Permit (Arizona)
PO Box 661
15 Robinson St
T. 08-9380 6063
Nedlands WA 6009
Belmont WA 6104
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Buxton Resources Limited
ABN
Quarter ended (“current quarter”)
86 125 049 550
30 June 2025
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(12 months)
$A’000
130
364
(681)
(2,980)
(b) development
-
-
(c) production
-
-
(d) staff costs
(267)
(963)
(e) administration and corporate costs
(209)
(673)
-
-
(a) exploration & evaluation
1.3
Dividends received (see note 3)
1.4
Interest received
28
44
1.5
Interest and other costs of finance paid
(6)
(21)
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
298
298
1.8
Other - GST
(45)
19
1.9
Net cash used in operating activities
(752)
(3,912)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(1)
(8)
(d) exploration & evaluation
-
-
(e) investments
-
-
(f)
-
-
(c) property, plant and equipment
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(12 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements interests
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash used in investing activities
(1)
(8)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
3,000
3,966
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securitie