Matrix Manganese Project - Drone Survey Commenced
Released
Released
Announcement PDF
ASX Release
3rd July 2024
Matrix Manganese Project – Drone Survey Commenced
Buxton Resources Ltd (‘Buxton’; ASX:BUX) is pleased to advise that drone magnetic
surveys have commenced at the Matrix Project in Arizona (Figure 1).
Figure 1: Dawn greets the Matrix Project magnetic survey drone - looking East over the Chapin
Wash toward the Artillery Mountains, Mohave County, Arizona.
Buxton’s CEO Marty Moloney said; “This survey is the first step towards targeting
our maiden drill program at the Matrix Project, and I'm pleased that it has
commenced so soon after closing the acquisition."
The survey will be flown at 30 metre flight lines for 1,290 line-kilometres to provide
magnetic imagery at 6 metre resolution and photogrammetry / elevation products
at 0.03 metre resolution (Figure 2).
Buxton's new survey aims to provide an improved basis for refining the structural
model (Figure 3) ahead of first-pass drilling. Available open-file airborne magnetic
imagery over the Matrix Project is based on a USGS survey flown in 1977 with 1,600
metre flight lines. Detailed orthophoto coverage (restricted to the tenure area) will
provide a basis for the Project environmental baseline status. The survey is expected
to take 2 weeks to complete.
Buxton looks forward to updating shareholders on progress at this exciting project.
Figure 2: Matrix Manganese Project, Mojave County, Arizona. Known manganese mineralisation
surrounds the Project on three sides and includes the Artillery Peak project which has a NI43-101
compliant resource of 277 Mt @ 2.8% Mn. Line of cross section A-A’ (Figure 3) is indicated.
---000---
This announcement is authorised by the Board of Buxton Resources Ltd.
For further information, please contact:
Martin Moloney
Chief Executive Officer
marty@buxtonresources.com.au
Sam Wright
Company Secretary
sam@buxtonresources.com.au
Figure 3: Matrix Project geological cross section, modified after Spencer et al 2015 1
About the Matrix Project
The Matrix Project consists of 154 Lode Mining Claims (MTX 001 - MTX 154) covering ~12 km2 in
Mohave County, Arizona. The Matrix Project claims cover the interpreted western extension of the
Artillery Peak mineralisation. Buxton is targeting deposits of highly soluble manganese amenable to
in-situ recovery mining methods.
Manganese was first discovered in the region around 1880. The deposits at the Artillery Peak occur
as two distinct types of deposit, stratiform manganese deposits and vein manganese deposits. In
2011 American Manganese Inc. (now RecycLiCo TSX.V:AMY) defined Indicated & Inferred Resources
of 277 Mt @ 2.8% Mn. A Tetra Tech study in 2012 focused on a smaller area with Indicated and
Inferred Resources of 82 Mt @ 2.3% Mn (with 198 Mt remaining current outside this area). 2
In the 1980s the US Bureau of Mines evaluated the feasibility of in-situ and heap leaching for Mn
extraction from domestic US ores. Of the 25 deposits examined, the Artillery Peak sample (3.5% Mn)
presented the fastest and highest Mn recovery characteristics in column leaching 3, and was the only
deposit select for further evaluation targeting suitability for insitu recovery methods 4 - work which was
curtailed when the USBoM was abolished in 1996.
1
Spencer, J.E., Richard, S .M., Johnson, B.J., Love, D.S., Pearthree, P.A., and Reynolds, S .J., (2015), Geologic map of the
Artillery Peak and Rawhide Wash 7 ½ ' Quadrangles, Mohave and La Paz Counties, Arizona: Arizona Geological Survey
Digital Geologic Map DGM -100, version 2.0, scale 1:24,000, 2 sheets. Section line B-B’
2
Tribe, N. (2011). Mineral Resource Evaluation Report on the Artillery Mountain Manganese Property, Mohave County,
Arizona, U.S.A
3
Pahlman, J. E., Khalafalla, S. E. (1988). Leaching of Domestic Manganese Ores with Dissolved SO2. United States: U.S.
Department of the Interior, Bureau of Mines.
4
Brink, S. E., Blake, R., & Marozas, D. (1995). Petrographic and Geochemical Analyses of Leach Samples From Artillery Peak,
Mohave County, AZ. Report of Investigations to United States Department of the Interior & Bureau of Mines
Figure 4: The Matrix Manganese Project, located in Arizona, around 3 hours’ drive from Phoenix.
Cautionary Note Regarding Forward-Looking Information
This Announcement contains forward-looking statements and forward-looking information within the
meaning of applicable Australian securities laws, which are based on expectations, estimates and
projections as of the date of publication. This forward-looking information includes, or may be based
upon, without limitation, estimates, forecasts and statements as to management’s expectations with
respect to, among other things, the timing required to execute the Company’s programs, and the
length of time required to obtain permits, certifications and approvals.
Wherever possible, words such as “anticipate”, “believe”, “expect”, “intend”, "should", "intend",
“may” and similar expressions have been used to identify such forward-looking information. Forwardlooking information is based on the opinions and estimates of management at the date the
information is given, and on information available to management at such time. Forward-looking
information involves significant risks, uncertainties, assumptions, and other factors that could cause
actual results, performance or achievements to differ materially from the results discussed or implied
in the forward-looking information. These factors, including, but not limited to, fluctuations in
currency markets, fluctuations in commodity prices, the ability of the Company to access sufficient
capital on favourable terms or at all, changes in national and local government legislation, taxation,
controls, regulations, political or economic developments in Australia or other countries in which the
Company does business or may carry on business in the future, operational or technical difficulties in
connection with exploration or development activities, employee relations, the speculative nature of
mineral exploration and development, obtaining necessary licenses and permits, contests over title
to properties, especially title to undeveloped properties, the inherent risks involved in the exploration
and development of mineral properties, the uncertainties involved in interpreting drill results and
other geological data, environmental hazards, industrial accidents, limitations of insurance coverage
and the possibility of project cost overruns or unanticipated costs and expenses, and should be
considered carefully.
Many of these uncertainties and contingencies can affect the Company’s actual results and could
cause actual results to differ materially from those expressed or implied in any forward-looking
statements made by, or on behalf of, the Company. Prospective investors should not place undue
reliance on any forward-looking information. Although the forward-looking information contained on
in this Announcement is based upon what management believes, or believed at the time, to be
reasonable assumptions, the Company cannot assure prospective purchasers that actual results will
be consistent with such forward-looking information, as there may be other factors that cause results
not to be as anticipated, estimated or intended, and neither the Company nor any other person
assumes responsibility for the accuracy and completeness of any such forward-looking information.
The Company does not undertake, and assumes no obligation, to update or revise any such forwardlooking statements or forward-looking information contained herein to reflect new events or
circumstances, except as may be required by law. No stock exchange, regulation services provider,
securities commission or other regulatory authority has approved or disapproved the information
contained in this Announcement.
Share your feedback
Discover