Graphite Bull Project - Progress Update
•
Spheroidised Purified Graphite (SPG) testwork completed by Dorfner
Anzaplan GmbH
•
Second round of Qualification test work by BTR New Material Group
underway
•
Expanded Resource estimation by ERM underway
Buxton Resources Ltd (‘Buxton’; ASX:BUX) is pleased update shareholders with
recent progress on the Graphite Bull Project.
In July 2024, ALS Metallurgy (Perth) produced 129 kg of flake concentrate @ 95.3%
TGC from a third bulk sample of RC chips derived from February 2023 scout drilling.
This concentrate sample was prepared in order to follow-up the “proof of concept”
testwork from flake through to anode by ProGraphite (ASX 25 Jan 2024).
Dorfner Anzaplan GmbH have now completed spheronisation testwork on a 20 kg
sub-sample of the July 2024 concentrate with final reporting imminent. BTR New
Material Group (BTR) reported positive assessment of a small (1.5 kg) sub-sample of
the same July 2024 flake concentrate in August 2024 (ASX 26 Aug 2024) and have
also indicated positive assessment of the preliminary spheronising results.
An ore sample of ~738 kg from 2024 Infill Resource drilling was sent to BTR in late
2024 (ASX 31 Oct 2024). BTR has completed flotation testwork on this material and
has since requested additional flake concentrate to facilitate an expanded
downstream testwork program through to anode production optimised for an
established South Korean cell manufacturer. This downstream testwork, including
spheroidization, purification, and anode / cell manufacture, is well underway in-house
at BTR with the next round of results expected in February 2025.
Geological modelling of the expanded Graphite Bull Resource is now complete, and
all assays are in hand. Resource Modelling and Estimates by ERM are well underway,
with completion expected by end January 2025.
CEO, Marty Moloney, comments, “Buxton’s 100% owned Graphite Bull Project
continues to make steady progress towards customer qualification and a Resource
update. We’re looking forward to the results from these parallel work streams to
enable economic modelling critical to securing industry investment for this Project.”
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
Visit our investor hub: investorhub.buxtonresources.com.au
About BTR
BTR New Material Group Co., Ltd. (“BTR”) is a fully vertically integrated Chinese
anode manufacturer, from upstream natural graphite mining to downstream lithiumion battery materials including anode, cathode and new materials for lithium-ion
batteries. BTR has held the top global market share for sale of anode materials for
14 years, and currently has >25% of global anode market share. The company serves
major lithium-ion battery manufacturers such as Panasonic, Samsung SDI, LGES, SK
on, CATL, and BYD.
BTR’s new 80 ktpa anode production plant in Kendal, Centra Java, represents a
US$750M investment and started production on August 7th 2024, becoming the first
anode production plant operated by Chinese company outside China. Stage 2 (also
80 ktpa) is in construction, with production scheduled for 2026. When completed
this single plant will consume ~320 ktpa of fine flake (-100um) graphite feedstock.
As of the end of August 2024, BTR has operating anode production capacity of
575,000 tpa.
Figure 1: Graphite Bull is ideally located to supply new anode facilities in Asia
This announcement is authorised by the Board of Buxton Resources Ltd. For
further information, please contact:
Martin Moloney
Sam Wright
Chief Executive Officer
Company Secretary
marty@buxtonresources.com.au
sam@buxtonresources.com.au
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
Visit our investor hub: investorhub.buxtonresources.com.au
Competent Persons – Graphite Bull
The information in this report that relates to Exploration Results is based on information compiled by
Mr Martin Moloney, Member of the Australian Institute of Geoscientists and Society of Economic
Geologist. Mr Moloney is a full-time employee of Buxton Resources Ltd. Mr Moloney has sufficient
experience which is relevant to the activity being undertaken to qualify as a “Competent Person” as
defined in the 2012 edition of the Joint Ore Reserves Committee (JORC) Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Moloney consents to the
inclusion in this report of the matters based on the information in the form and context in which it
appears.
Previously Reported Information – Graphite Bull Project
There is information in this announcement relating to exploration results previously announced on:
1.
2.
3.
4.
5.
6.
7.
8.
25th July 2014 – 127 metres @ 13.4% TGC – Yalbra Graphite Drilling
24th October 2014 – Buxton significantly expands Graphite Resource at Yalbra
19th April 2023 – Graphite Bull Drilling Assays
25th January 2024 – Anode Testing Success at Graphite Bull Project
25th July 2024 - 84.6m of mineralisation intersected at Graphite Bull Project
26th August 2024 – Graphite Bull & Narryer Project - Exploration Update
24th October 2024 – Graphite Bull: Record Setting 124 m @ 16.6% TGC
31st October 2024 – Company Presentation
Validity of Referenced Results
Buxton confirms that it is not aware of any new information or data that materially affects the
information from previous ASX announcements which has been referenced in this announcement.
About the Graphite Bull Project
The at-surface, high-grade Graphite Bull Project is located in the Tier 1 mining jurisdiction of Western
Australia, Gascoyne region, on granted Exploration License E09/1985. Graphite Bull was acquired by
Buxton in 2012 and by 2014 two resource estimates were completed. The Graphite Bull project
currently has a JORC (2012) compliant Inferred Resource of 4 Mt @ 16.2 % TGC (ASX 24/10/2014).
Due to projected growth of the global Lithium-ion battery market, and the essential part graphite will
play in that – graphite is the single largest component of Li-ion batteries – Buxton recommenced work
at Graphite Bull in 2022. Work since then has been focused on metallurgical test work through to final
product (Activated Anode Material), and increasing Resource confidence and size, with very promising
results to date.
Benchmark Mineral Intelligence predicts that global capacity of anode material will increase over
fivefold between 2024 and the end of the decade, reach over 15Mtpa, a huge increase from the
2.3Mtpa of operational capacity in 2024. This battery-related demand means that by 2027, global
graphite production needs to double and that, by 2040, eight times current production will be
required to supply the world’s lithium-ion battery anode market. Ex-China battery anode capacity,
and investment, is being spurred by US IRA legislation. Graphite Bull is therefore a very attractive
project, being a high-grade deposit located in a Tier 1, US FTA mining jurisdiction, with ore materials
having demonstrated excellent electrochemical performance and with outstanding Resource growth
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
Visit our investor hub: investorhub.buxtonresources.com.au
potential. Buxton has also recently confirmed the discovery of a new graphite mineral system at the
Blackhawk Project, some 100 km south from Graphite Bull.
Figure 2: Buxton’s Graphite Bull & Blackhawk Projects are located within the Gascoyne / Murchison
Region of Western Australia.
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
Visit our investor hub: investorhub.buxtonresources.com.au
JORC Table: Section 1 – Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling techniques
Nature and quality of sampling (eg cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down-hole gamma sondes, or
handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report. In cases where ‘industry
standard’ work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases,
more explanation may be required, such as where there is
coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of detailed
information.
The Anzaplan results presented herein were derived
from samples from Reverse Circulation drilling.
Reverse Circulation drilling produced samples that were
collected at one-metre intervals. Metre delineation was
controlled by the driller by means of visual marks on the
mast chain on rig. A one metre ‘split’ sample was
collected in pre-numbered calico bags at the time of
drilling using a cone splitter integrated into the drill
cyclone to produce a 1-3kg sample, which is considered
representative of the full drill metre.
The residual material from each metre interval was
collected in 600mm x 900mm biodegradable bags
preserved at the drill site whilst laboratory analysis is
ongoing.
All one metre split samples were sent to the laboratory
for preparation. Sample weights are recorded on
submission to the laboratory. A compositing program
was then undertaken under laboratory conditions such
that 250g pulp composites were prepared. These
composites were generally two-metre samples for
mineralised intervals (with some 1m samples where
required by QA sampling). Three, four, or five-metre
composites were then used either side of the two / one
metre intervals for analysis.
All 1m pulps and bulk rejects are preserved for further
testwork if required.
Laboratory analysis for Total Graphitic Carbon was
undertaken by ALS Geochemistry in Perth.
Drilling techniques
Drill type (e.g., core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (e.g. core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit or other type, whether
core is oriented and if so, by what method, etc).
Reverse Circulation (RC) drilling used a Schramm T685
truck mounted rig (RC).
Drill sample recovery
Method of recording and assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
RC recoveries were considered good with available air
for drill sample recovery being deemed adequate for the
ground conditions and depth of sampling undertaken.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
Appropriate measures have been undertaken to
maximise sample recovery and ensure the
representative nature of samples, including:
-
Terminating RC holes when recovery amounts
are reduced at depth
Terminating RC holes when excess water is
encountered
No apparent relationship has been defined between
sample recovery and grade based on the various drilling
programs to date at Graphite Bull.
Logging
PO Box 661
Nedlands WA 6009
Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
15 Robinson Av
Belmont WA 6104
Reverse Circulation Drilling
For the RC program, chip trays were collected from each
one metre interval this was used to log lithology,
oxidation and visual graphite content estimate a streak
test was used to assist with visual estimates alongside
historical samples.
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
Visit our investor hub: investorhub.buxtonresources.com.au
The total length and percentage of the relevant
intersections logged.
Visual estimates for TGC were based on comparison with
historic samples from Buxton’s 2014 program, YBRC0018
and YBRC0019 which constituted 276 metres of
previously assayed material with grades from 0.1% to
30.9% TGC. This included 52 samples greater than 10%
TGC. 19 samples from 5-10% and 87 samples from 0-5%.
Samples were noted if they were wet or where recovery
was significantly impacted.
Photographs of all RC chip trays where then taken at
BUX’s core processing facility at the Project, and in Perth
and retained on file with the original chip trays stored at
BUX’s storage facility in Peth.
Logging is considered to be semi-quantitative.
The visual logging has been augmented by
lithogeochemical analysis using portable XRF data
collected on prepared pulps returned from ALS (for the
RC samples) and from analyses collected directly on
diamond core. Thorough statistical treatment of this
data was undertaken, including validation, mitigating
closure effects, k-means cluster analysis and principal
component analysis to generate a classification that was
verified firstly on the core logging and against other
quantitative data such as magnetic susceptibility and
density dataset. This lithological classification was then
utilised by a contract structural geologist, who had
undertaken ~2 weeks of surface mapping at Graphite
Bull, to develop a 3D solid geology model.
Sub-sampling
techniques and
sample preparation
If core, whether cut or sawn and whether quarter, half or
all core taken.
If non-core, whether riffled, tube sampled, rotary split,
etc and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected, including
for instance results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to the grain size of
the material being sampled.
Reverse Circulation Drilling
All RC one-metre sub-samples from drill holes were
collected from a cone splitter respectively, to produce an
~15% routine split sample for analysis. Field duplicates
were collected for the RC programs.
Samples were submitted to ALS Geochemistry for
sample preparation and analysis. Samples were
pulverised to better than 85% passing -75 micron and
analysed for %TGC by C- IR18 method where Graphitic C
is determined by digesting sample in 50% HCl to evolve
carbonate as CO2. Residue is filtered, washed, dried and
then roasted at 425C. The roasted residue is analysed for
carbon by oxidation, induction furnace and infrared
spectroscopy. This method has a lower detection limit of
0.02% TGC and an upper detection limit of 50% TGC.
The sample sizes are considered appropriate for the
grain size and abundance levels of the material being
sampled.
June 2024 ALS Metallurgy
Bulk Sample “Bulk3”
After ALS Geochemistry reported results for the 1 m
splits, the sample residue remaining on site (in green
bags) was retrieved and a bulk composite of 988 kg
prepared. ALS Metallurgy use a LOI method to
determine Total Graphitic Carbon to be 19.0%. Several
bench scale tests were run and then a bulk flotation run
on remaining material produced 129 kg of 95.3%
graphitic carbon flake concentrate.
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
Visit our investor hub: investorhub.buxtonresources.com.au
ANZAPLAN Spheronising Testwork
A 20 kg sample of the ALS Metallurgy “Bulk3”
concentrate sample was provided to ANZAPLAN GMBH
in Germany for spheronisation testwork. Pre-grinding
was undertaken on a on Netzsch CSM 80. This system
from Netzsch combines a mechanical impact mill with a
deflector wheel classifier. The material is accelerated by
beaters and spun against the grinding track, while a
classifier sifts out fine particles. Spheroidization was
completed on the Netzsch CSM 165.
The Netzsch CSM 165 is a classifier mill that combines a
mechanical impact mill with an air classifier.
Optimization process parameters were generated for a
Spherical Graphite (SG) product with D50 ~18 μm and
post spheroidization of SG fines for a potential additional
SG product (D50 ~8 μm) which were assessed for Tap
Density and BET (Brunauer-Emmett-Teller surface area is
a technique for measuring the surface area of powders
based on the physical adsorption of an inert gas onto a
the sample's surface).
Quality of assay data
and laboratory tests
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation,
etc.
Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (ie lack of bias)
and precision have been established.
Verification of
sampling and
assaying
The verification of significant intersections by either
independent or alternative company personnel.
A combined 68% yield was achieved using this two-step
process with highly encouraging Tap density and BET
values that indicate the feed concentrate has good
process flexibility such that it can utilised for a variety of
SG products.
ALS Geochemistry run a global quality program which
includes inter-laboratory test programs and regularly
scheduled internal audits that meet all requirements of
ISO/IEC 17025:2017 and ISO 9001:2015.
The C-IR18 and LOI methods are considered a (total)
graphitic carbon method appropriate for this type of
sample material.
The release does not include data from geophysical or
handheld XRF tools.
Quality Control and Quality Assurance procedures
implemented to check sampling and assaying precision
included duplicate samples using the same sub-sampling
technique. Standards and blanks were also included to
ensure sampling quality at a rate of 1 in 10.
The QA results indicate that an appropriate level of
laboratory precision and accuracy has been established.
Senior company geological personnel onsite for the
entirety of the drilling and logging process.
The logging is be validated by a BUX on-site geologist
and in Perth and compiled onto the BUX MX Deposit drill
hole database
Assay data is be imported directly from digital assay files
from contract analytical company ALS (Perth) and
merged in the Company MX Deposit drill hole database.
Data is backed up regularly in off-site secure servers.
No new geophysical results are used in exploration
results reported.
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
Visit our investor hub: investorhub.buxtonresources.com.au
The use of twinned holes.
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.
Location of data
points
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing and
distribution
Data spacing for reporting of Exploration Results.
Orientation of data in
relation to geological
structure
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which
this is known, considering the deposit type.
If the relationship between the drilling orientation and
the orientation of key mineralised structures is considered
to have introduced a sampling bias, this should be
assessed and reported if material.
The measures taken to ensure sample security.
Sample security
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
No historic holes were twinned as part of this program,
however the program did include a component of check
drilling in the existing Resource area. This program also
utilised scissor holes to confirm mineralisation
orientation and continuity.
Logging and sampling were recorded directly into a
digital database (MX Deposit).
No adjustments to assay data have been made.
The surface hole collar location was initially surveyed
using a handheld GPS unit with an expected accuracy of
±6 m for easting and northing with elevation also
recorded. The collar positions were subsequently picked
up by differential GPS (reported above).
Drill path gyroscopic surveys were at 0m and at
subsequent 30m downhole intervals to final hole depth
using an Axis Gyro tool.
All coordinates are presented in GDA2020 / MGA Zone
50 South grid system.
Topographic control was provided by a Digital Elevation
Model (DEM) derived from the 2024 Drone survey which
provided a DEM with a 0.05cm resolution and +/- 0.5m
vertical accuracy.
The ore samples used as an input to the Bulk 3
metallurgical sample are derived from outside the
existing Resource, but from within the area expected to
be classified within the upcoming Resource upgrade.
This sample is not considered suitable for establishing
geological and grade continuity. Samples for the Bulk3
sample feed were targeted based on achieving a
maximum amount of resulting flake and was therefore of
a slightly higher grade (19.0% TCG) than the 2014
resource grade (16.2% TGC).
The orientation of the drilling aimed to reduce sampling
bias within the access limitations imposed by
topographic relief.
The drilling orientation was designed to intersect the
interpreted orientation of mineralised zones at a high
angle.
The chain-of-sample custody is managed by the BUX
staff from collection at the rig to the submission of the
samples to ALS Limited – Perth for analysis.
Samples are being stored at the drill site before being
transported and processed at BUX’s secure sample
processing and storage facility in Belmont, Perth.
Sample reconciliation advice is sent by ALS-Perth to
BUX’s Geological Database Administrator on receipt of
the samples.
Any inconsistences between the despatch paperwork
and samples received is resolved with BUX before
sample preparation commences.
Sample preparation and analysis is completed at one of
the ALS laboratories in Perth.
Audits or reviews
PO Box 661
Nedlands WA 6009
The results of any audits or reviews of sampling
techniques and data.
15 Robinson Av
Belmont WA 6104
The risk of deliberate or accidental loss or contamination
of samples is considered very low.
Sampling procedures are essentially identical to those
followed by Buxton in 2013/14 which have previously
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
Visit our investor hub: investorhub.buxtonresources.com.au
been reviewed and found to be adequate by an
independent resource geologist.
JORC Table: Section 2 – Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral tenement and
land tenure status
Type, reference name/number, location and ownership
including agreements or material issues with third parties
such as joint ventures, partnerships, overriding royalties,
native title interests, historical sites, wilderness or
national park and environmental settings.
BUX have a 100% interest in exploration license E09/1985.
Exploration done by
other parties
Geology
The security of the tenure held at the time of reporting
along with any known impediments to obtaining a licence
to operate in the area.
Acknowledgment and appraisal of exploration by other
parties.
Deposit type, geological setting and style of
mineralisation.
A 0.75% Gross Revenue Royalty was granted under a
Tenement Sale Agreement dated 31 March 2016, between
Montezuma Mining Company Ltd (“Montezuma”) and
Buxton Resources Limited. This royalty is currently held by
Electric Royalties Ltd (TSXV:ELEC & OTCQB:ELECF).
The tenement is in good standing with DEMIRS and there
are no known impediments for exploration on this
tenement.
Numerous exploration parties have held portions of the
area covered by BUX tenure previously. The only
substantive historical exploration for graphite was
undertaken by CEC in 1974 – see WAMEX report A6556.
No other parties were involved in the exploration program
that generated data that was used in this release.
The Graphite Bull Project area lies within the Errabiddy
Shear Zone, situated at the contact between the
Glenburgh Terrane of the Gascoyne Province and the
Narryer Terrane of the Yilgarn Carton, on the
southwestern margin of the Capricorn Orogen.
The known graphitic mineralisation occurs as lenses in
graphitic paragneiss assigned to the Quartpot Pelite. This
unit has been interpreted to have been deposited
between 2000 Ma and 1985 Ma in a fore-arc setting to the
Dalgaringa continental margin arc (part of the Glenburgh
Terrain), and subsequently deformed between 1965–1950
Ma during the Glenburgh Orogeny within the Errabiddy
Shear Zone which represents the suture between the
colliding Pilbara–Glenburgh and Yilgarn Cratons.
Drill hole Information
A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material
drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar
o dip and azimuth of the hole
All units at Graphite Bull show evidence for
metamorphism in the amphibolite to granulite facies, with
the production of voluminous leucosomes and
leucogranites within the pelitic lithologies.
Sample for the Bulk3 composite were derived from 2023
RC drillholes as follows.
Hole ID
East
GB003RC
435490
North
Azi
Dip
Depth range
7172797 349
-75.5
145 - 156m
196 - 210m
GB004RC
435914
7172922 348
-69.0
o down hole length and interception depth
Data aggregation
methods
PO Box 661
Nedlands WA 6009
o hole length
If the exclusion of this information is justified on the basis
that the information is not Material and this exclusion
does not detract from the understanding of the report,
the Competent Person should clearly explain why this is
the case.
In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations
(e.g. cutting of high grades) and cut-off grades are
usually Material and should be stated.
15 Robinson Av
Belmont WA 6104
20 - 38m
67 - 77m
GB005RC
434070
7172922 349
-80.0
122 - 128m
No reporting of composites or metal equivalent values has
been included in this release.
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
Visit our investor hub: investorhub.buxtonresources.com.au
Where aggregate intercepts incorporate short lengths of
high grade results and longer lengths of low grade
results, the procedure used for such aggregation should
be stated and some typical examples of such
aggregations should be shown in detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
Relationship between
mineralisation widths
and intercept lengths
These relationships are particularly important in the
reporting of Exploration Results.
If the geometry of the mineralisation with respect to the
drill hole angle is known, its nature should be reported.
If it is not known and only the down hole lengths are
reported, there should be a clear statement to this effect
(eg ‘down hole length, true width not known’).
Diagrams
Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported. These should
include, but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.
Where comprehensive reporting of all Exploration Results
is not practicable, representative reporting of both low
and high grades and/or widths should be practiced to
avoid misleading reporting of Exploration Results.
Balanced reporting
Well-drilled graphite mineralisation, and modelling of
Ground EM results, indicate that graphite mineralisation
has a consistently steep dip (75-85 degrees) toward the
south-southeast. Drillholes have been planned
approximately normal to this direction. however folding
and faulting results in local variation documented by
analysis of recent surface structural mapping and logging
of orientated diamond drilling core.
See text and figures in body of release.
The basis of reporting mineralised intervals is described
above. The release is considered comprehensive and
balanced with respect to assays and visually estimated
grades and widths intersected in the drilling program.
Other substantive
exploration data
Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potenti