Wolverine Rig Secured for Maiden Drill Program
Released
Released
Announcement PDF
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
View online: https://buxtonresources.com.au/link/yz8gXr
ASX:BUX
ASX Release Buxton Resources Ltd (ASX:BUX) 4 November 2026
Wolverine Project: Rig Secured for
Maiden Drilling Program
• Drilling contract executed with LSG Drilling for the maiden diamond core program at
the Wolverine Cu–Mo porphyry project, Arizona, with rig mobilisation scheduled for
early November 2026
• All approvals in place and site preparation complete – BLM Notice of Operations
extended and amended, access tracks and drill pads constructed, and dedicated water
bores installed
• Three diamond core holes for ~1,650 m (~5,400 ft) to test outcropping porphyry Cu–
Mo mineralisation across the Wolverine and Copper Chief target areas – neither of
which has previously been drill tested
Buxton Managing Director Martin Moloney commented:
“Signing the drilling contract is the final step before we put a rig on the ground at Wolverine.
With permitting, access, pads and water all in place, we’re set to mobilise in early November
and deliver the first drill test of these outcropping porphyry copper–molybdenum targets.
Wolverine sits within the same Laramide-age system as the neighbouring Copper Wolf project,
and the targets are backed by strong geological, geochemical and geophysical support from
Buxton’s own work. We look forward to updating shareholders as the program progresses.”
Buxton Resources Limited (ASX: BUX) (“Buxton” or “the Company”) is pleased to advise that
it has executed a drilling services contract with LSG Drilling for the maiden diamond core
drilling program at the Company’s Wolverine copper–molybdenum (Cu–Mo) porphyry project
in Yavapai County, Arizona. The program comprises three diamond core holes for
approximately 1,650 metres (~5,400 feet): two holes (P1 and P2) at Wolverine, and the third
(P3) at Copper Chief. The Wolverine Project comprises Buxton’s 100%-owned claims together
with the adjoining Copper Chief ground, which Buxton holds under a lease and option
agreement.
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
View online: https://buxtonresources.com.au/link/yz8gXr
ASX:BUX
Figure 1: Wolverine Project planned diamond drillhole collars and traces on vertical derivative magnetics /
terrain image & inversion shells. Rock-chip labels show Cu ppm / Mo ppm. Buxton’s mapping to date covers the
SW of the project area, as shown by chip-sample locations. Veining and dykes interpreted to be related to
porphyry-style mineralisation are extensive in the mapped area. NE-trending zones evident in the magnetics are
interpreted to reflect mafic host rocks and/or high concentrations of magnetite-bearing porphyry-style veins.
Both associations are observed to strongly favour copper mineralisation in previous drilling in the Copper Wolf
Project area (see BUX ASX 06/09/2023 & 14/12/2023). Further mapping and sampling across the project area is
planned for the upcoming Arizona winter field season.
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
View online: https://buxtonresources.com.au/link/yz8gXr
ASX:BUX
Figure 2: Wolverine Project section 3,769,832N looking north showing planned diamond holes P1 and P2 relative
to drone-magnetic MVI inversion isoshells, mapped porphyry dykes, vein intensity and rock-chip samples, with
vertical derivative magnetics draped on topography.
Table 1: Planned drill collar parameters (NAD83 UTM Zone 12N). P1 and P2 coordinates corrected from those
shown in the ASX announcement of 21 October 2026.
Plan ID Target area Easting Northing Planned
depth (m)
Planned
azimuth
Planned
dip
P1 Wolverine 375667 3769804 650 65° −50°
P2 Wolverine 375742 3769723 550 85° −50°
P3 Copper Chief 376428 3769314 450 330° −60°
Total ~1,650
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
View online: https://buxtonresources.com.au/link/yz8gXr
ASX:BUX
Figure 3: Wolverine Project completed drill pad for planned hole P2 at the Wolverine prospect (Table 1).
All approvals and site preparation required for the program are complete:
- Bureau of Land Management (BLM) Notice of Operations extended to April 2028 and
amended to cover up to four drill pads
- Dedicated water bores installed to service the program
- Earthworks complete, with access tracks and drill pads constructed to contractor
specification
-
The program is expected to take approximately 6 weeks to complete, with first assay results
expected in early 2027. Buxton will provide a further update once drilling has commenced.
This announcement is authorised by the Board of Buxton Resources Ltd. For further
information, please contact:
Martin Moloney
Managing Director
marty@buxtonresources.com.au
Sam Wright
Company Secretary
sam@buxtonresources.com.au
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
View online: https://buxtonresources.com.au/link/yz8gXr
ASX:BUX
About the Wolverine Project
The Wolverine Project is a copper–molybdenum (Cu–Mo) porphyry target held 100% by Buxton,
located ~65 km north-northeast of Phoenix, Arizona, immediately adjacent to the Copper Wolf
porphyry project (now IGO 100%). The area lies within one of the most prolifically endowed copper
belts in the world, host to numerous major porphyry Cu–Mo deposits across the south-western USA
and northern Mexico.
Buxton’s approach leverages the significant advances in geophysical targeting tools and mineral-
systems knowledge developed since historical exploration in the area ceased in the early 1990s. The
Company’s tenure comprises federal unpatented lode mining claims administered by the BLM, a
Mineral Exploration Permit administered by the Arizona State Land Department (ASLD), together
covering 12.18 km2
and the surface and mineral rights held under the Copper Chief Lease and Option
Agreement.
At Wolverine, outcropping mineralised porphyry dykes intrude Proterozoic granitoids, offering the
potential to test the porphyry system at shallower depths than in the covered parts of the district.
Reconnaissance rock-chip sampling at Wolverine has returned strongly anomalous copper up to
14.15% Cu (141,500 ppm) and molybdenum up to 1,160 ppm Mo (separate samples, Figure 1).
Drone-magnetic surveying flown in 2024 revealed a 1,200 m × 250 m cluster of NE-trending magnetic
anomalies that coincide with mapped, mineralised porphyry dykes at surface. These magnetic features
are interpreted to reflect mafic host rocks and/or high concentrations of magnetite-bearing porphyry-
style veins — both associations observed to strongly favour copper mineralisation in the adjacent
Copper Wolf discovery hole CPW0002DD. The potential for these features to coincide is considered
strongly favourable for a high-grade hypogene porphyry Cu discovery.
A U–Pb zircon age of 69.6 ± 0.4 Ma (Laramide, Figure 1) confirms that Wolverine forms part of the
same porphyry system as Copper Wolf, where mineralisation has been dated at 70.3 Ma. Critically,
mineralisation outcrops at Wolverine and the target has not previously been drilled.
The Copper Chief target lies on ground contiguous with Buxton’s tenure and is held under the Copper
Chief Lease and Option Agreement. Under the Copper Chief Lease and Option Agreement, effective
10 November 2023, Buxton Resources Arizona LLC holds exclusive exploration rights over a private fee
parcel and unpatented lode mining claims covering 0.59 km2
for an initial five-year term, in return for
annual payments of US$25,000, together with the option to acquire the property for US$700,000 at
any time during the term, subject to a 5% net smelter return royalty, of which up to 3.5% may be
bought back for a total of US$5 million.
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
View online: https://buxtonresources.com.au/link/yz8gXr
ASX:BUX
Competent Person’s Statement
The information in this announcement that relates to Exploration Results and geological interpretation
is based on information compiled by Mr Martin Moloney, a Member of the Australian Institute of
Geoscientists and the Society of Economic Geologists. Mr Moloney is a full-time employee of Buxton
Resources Ltd and has sufficient experience relevant to the style of mineralisation and type of deposit
under consideration, and to the activity being undertaken, to qualify as a Competent Person as defined
in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves. Mr Moloney consents to the inclusion in
this announcement of the matters based on his information in the form and context in which it
appears.
Previously Reported Information
There is information in this announcement relating to exploration results previously announced on:
Wolverine Project
- 11 Jan 2024 Extension to Cu-Mo Porphyry System Discovered at Surface
- 01 May 2024 Copper Wolf Project - Wolverine prospectivity enhanced
- 21 Oct 2026 Wolverine Project: Drilling Program Update
Copper Wolf Project (now held 100% by IGO)
- 06 Sep 2023 626.8m porphyry Cu-Mo sulphide observed in second drill hole
- 14 Dec 2023 Assay Results from 2nd
Diamond Hole at Copper Wolf Project
Validity of Referenced Results
Buxton confirms that it is not aware of any new information or data that materially affects the
information included in the original market announcements referenced in this announcement, which
include relevant JORC Table 1 information, and that the form and context in which the Competent
Person’s findings are presented have not been materially modified from the original market
announcements.
The Copper Wolf results announced on 6 September 2023 and 14 December 2023 relate to drillhole
CPW0002DD. Following completion of the Copper Wolf Asset Sale Agreement on 29 June 2026, IGO
holds 100% of the Copper Wolf Project, and Buxton no longer holds any interest in that project or has
access to exploration data generated after completion. Buxton’s confirmation above, as it relates to
those announcements, is therefore limited to information known to Buxton up to completion of the
sale. Those results are referenced in this announcement only to provide geological context for the
adjoining Wolverine Project.
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
View online: https://buxtonresources.com.au/link/yz8gXr
ASX:BUX
Cautionary Note Regarding Forward-Looking Information
This Announcement contains forward-looking statements and forward-looking information within the
meaning of applicable Australian securities laws, which are based on expectations, estimates and
projections as of the date of publication. This forward-looking information includes, or may be based
upon, without limitation, estimates, forecasts and statements as to management’s expectations with
respect to, among other things, the timing required to execute the Company’s programs, access
conditions across the Company’s project areas, and drilling conditions.
Wherever possible, words such as “anticipate”, “believe”, “expect”, “intend”, “should”, “may” and
similar expressions have been used to identify such forward-looking information. Forward-looking
information is based on the opinions and estimates of management at the date the information is
given, and on information available to management at such time. Forward-looking information
involves significant risks, uncertainties, assumptions, and other factors that could cause actual results,
performance or achievements to differ materially from the results discussed or implied in the forward-
looking information. These factors, including, but not limited to, fluctuations in currency markets,
fluctuations in commodity prices, the ability of the Company to access sufficient capital on favourable
terms or at all, weather and access conditions, contractor and equipment availability, changes in
national and local government legislation, taxation, controls, regulations, the speculative nature of
mineral exploration and development, obtaining necessary licences and permits, the inherent risks
involved in the exploration and development of mineral properties, and the possibility of project cost
overruns or unanticipated costs and expenses, should be considered carefully.
The Company does not undertake, and assumes no obligation, to update or revise any such forward-
looking statements or forward-looking information contained herein to reflect new events or
circumstances, except as may be required by law. No stock exchange, regulation services provider,
securities commission or other regulatory authority has approved or disapproved the information
contained in this Announcement.
Share your feedback
Discover