Graphite Bull Resource Expands 345%
Released
Released
Announcement PDF
ASX Release
17 February 2025
Graphite Bull Resource Expands 345%
•
Updated Mineral Resource Estimate (MRE) increases contained graphite by
345% to 2.25 Mt at a 7% Total Graphitic Carbon (TGC) cut-off, with 40% now
classified as Indicated Resources:
Indicated:
Inferred:
7.61 Mt @ 11.6% TGC
13.1 Mt @ 10.4% TGC
•
Graphite mineralisation crops out along a 1.6 km trend, with multiple highgrade zones, and newly identified hanging-wall zone both likely to enhance
project economics
•
Mineralisation remains open down-dip with multiple opportunities for
additional shallow Resource tonnes along strike
Buxton Resources Ltd (‘Buxton’; ASX:BUX) is pleased update shareholders on the
significant expansion of the Graphite Bull Project’s Mineral Resource Estimate (MRE).
The updated MRE was prepared by ERM, and has significantly increased the scale of
the project, with Total Resources now 20.7 Mt @ 10.8% TGC at a 7% TGC cutoff and
contained graphite increasing by 345% to 2.25 Mt (Table 1). Excellent continuity of
mineralisation is evident, with average thickness of ~45 m over 1.65 km strike (Fig 1).
Improved confidence from Buxton’s substantive and recent metallurgical,
groundwater, environmental, market and mining studies have led to the Project’s
maiden Indicated Resources to be defined which now account for 40% of the total
Resource reinforcing the project’s economic potential.
Table 1: Graphite Bull Mineral Resource estimate, TGC ≥ 7% (see also Notes to Table 2)
JORC Resource Tonnage Average TGC Grade Contained Graphite
Classification
(Mt)
(%)
(TGC Mt)
Indicated
7.6
11.6
0.89
Inferred
13.1
10.4
1.34
Total
20.7
10.8
2.25
CEO, Marty Moloney comments, “This outstanding outcome is the latest
encouraging result from multiple phases of work undertaken over the past 2 years.
This updated MRE improves the tonnage, thickness, strike extent and geological
confidence of the Graphite Bull Project, with numerous shallow drill targets
remaining as exploration upside.”
PO Box 661
15 Robinson Av
T: 08-9380 6063
This
Announcement
is
supported
a video overview from CEO Marty Moloney
Nedlands WA
6009
E:by
info@buxtonresources.com.au
Belmont WA 6104
W: www.buxtonresources.com.au
available on
Buxton’s InvestorHub
Visit our investor hub: investorhub.buxtonresources.com.au
Figure 1: Plan and long-section views of the 2025 MRE model along with contributing drillholes.
The grade & tonnage block model (see Figure 1 & Table 2) highlights the presence
of several shallow, high-grade zones, plus a significant hanging wall zone which are
each likely to enhance the flexibility of open pit operations.
Additional opportunities exist to expand the Resource, particularly along-strike at
shallow depths where multiple EM conductors remain untested by modern drilling.
Historic exploration confirms the presence of graphite at several of these targets
(Figure 3).
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
Visit our investor hub: investorhub.buxtonresources.com.au
Table 2: Grade-Tonnage table at selected cut-off grades (Indicated + Inferred classification)
TGC % Cut
Tonnage (Mt)
TGC %
Contained Graphite (kt)
Increase %
13
4.49
15.3
685
105
11
8.49
13.7
1,163
179
9
13.9
12.3
1,702
262
7
20.7
10.8
2,245
345
5
29.3
9.43
2,759
424
Notes:
1. Due to effects of rounding, the total may not represent the sum of all components.
2. Mineral Resource is reported from blocks at or above the 200 m RL, located approximately
200 m below topographic surface
3. Mineral Resources that are not Mineral Reserves do not have demonstrated economic
viability.
Figure 2: Graphite Bull Grade - Tonnage curve (Indicated + Inferred classification)
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
Visit our investor hub: investorhub.buxtonresources.com.au
Figure 3: Graphite Bull Project drilling with shallow EM conductivity image from the 2023 Loupe
Survey (see ASX 23 October 2023 for more details on this survey)
Next Steps
As previously reported (ASX 31 Oct 2024, ASX 15 Jan 2025), downstream
qualification testwork on Graphite Bull ore and flake is well underway at BTR’s inhouse laboratories. This work includes flotation, spheroidization, purification, and
anode / cell manufacture and builds on two years of successful SPG product testwork
in WA and Germany. BTR’s results, along with internal economic assessment of the
updated MRE, will then guide Buxton’s plans for further work at Graphite Bull.
---ooo--This announcement is authorised by the Board of Buxton Resources Ltd. For further
information, please contact:
Martin Moloney
Sam Wright
Chief Executive Officer
Company Secretary
marty@buxtonresources.com.au
sam@buxtonresources.com.au
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
Visit our investor hub: investorhub.buxtonresources.com.au
MINERAL RESOURCE ESTIMATE – SUPPORTING INFORMATION
CP Assessment
The Competent Person (CP) is of the opinion that the Graphite Bull Graphite deposit is of
sufficient grade, quantity, and coherence to have reasonable prospects for eventual
economic extraction (RPEEE). The deposit is located 280 km east of Carnarvon, W.A. and is
readily accessible by sealed and unsealed roads. Western Australia is a mature mining
jurisdiction, with a large mining workforce experienced in open cut and underground mining
methods. The geological units hosting the graphite mineralisation outcrop and have been
mapped over a strike length of 1,600 m. Graphite mineralisation is observed at surface.
Metallurgical testwork to date on ore from diamond core within the Resource indicates that
flotation can achieve concentrate grades up to 98.2% TGC at 93.7% recovery. Additional
metallurgical testwork includes production of purified spheronised graphite and
electrochemical testwork on coated and uncoated PSG. Considered together, the
metallurgical work confirms that Graphite Bull is suitable feedstock for the production of
Active Anode Material for Lithium-Ion batteries.
Geology and Geological Interpretation
The Graphite Bull deposit lies within the Errabiddy Shear Zone, situated at the contact
between the Glenburgh Terrane of the Gascoyne Province and the Narryer Terrane of the
Yilgarn Carton, on the southwestern margin of the Capricorn Orogen. The known graphitic
mineralisation occurs as lenses in a graphitic paragneiss, with mineralisation hosted within
the northern limb of a large antiformal structure that extends across the tenement.
Four lithological domains (meta-pelites and gneisses) were interpreted and modelled using
LeapFrog software, with lithological contacts based upon drill hole logs and surface
mapping. Within these domains, four mineralisation domains were interpreted and
modelled, following the strike and dip of the lithological domains, and are based upon a
lower TGC (%) cut-off grade of 5%. The domains fall mostly within the northern limb of the
antiform. Three weathering domains (oxide, transitional and fresh) were modelled in
Leapfrog based upon drill sample logs and pXRF assays for other elements, such as sulphur.
Drilling Techniques
Buxton Resources have completed three programmes of drilling at Graphite Bull. In 2013
and 2014, 27 reverse circulation (RC) and 5 diamond core (DD) holes were drilled for 4,150
m, mainly targeting the western end of the deposit. In 2023, 5 RC holes (991 m) were drilled,
followed by 27 RC holes (3960 m) and 2 DD holes (1223 m) in 2024. All holes, with the
exception of four RC holes drilled to the north of the deposit in 2013, were used to support
the geological interpretation and grade interpolation
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
Visit our investor hub: investorhub.buxtonresources.com.au
Sampling and Sub-sampling Techniques
Diamond drilling at Graphite Bull produced HQ and PQ diameter core. Core samples for
geochemical analyses were taken from halved or quartered (for duplicate samples) cut using
standard industry practices. Core samples were typically cut at 1 m length intervals.
Reverse Circulation drilling produced samples that were collected at one-metre intervals. A
one metre ‘split’ sample (either 1:6 or 1:8) was collected in pre-numbered calico bags at the
time of drilling using a cone splitter integrated into the drill cyclone to produce an
approximate 2-2.5 kg sample, which is considered representative of the full drill metre.
All one metre split samples were sent to a certified laboratory for preparation.
laboratories used are ISO-certified and independent of Buxton.
All
Sample Analysis Methods
For the 2013, 2014 and 2023 programs the one metre splits were analysed for Total Graphitic
Carbon. The 2013/14 samples were analysed at Genalysis Intertek in Perth, Australia and
the 2023/24 samples were analysed by ALS Geochemistry in Perth. Laboratory sample
preparation for both Intertek and ALS consisted of drying, crushing, splitting and pulverizing
to better than 85% passing -75 micron.
Sample analyses for TGC at Genalysis Intertek were by method C73/CSA to determine TGC
content, by weak acid digestion, followed by a 420°C roast and CS analyser, with a detection
limit of 0.1% - 40% TGC. Sample analyses at ALS were by C- IR18 method where Graphitic
C is determined by digesting the sample in 50% HCl to evolve carbonate as CO2. Residue
is filtered, washed, dried and then roasted at 425°C. The roasted residue is analysed for
carbon by oxidation, induction furnace and infrared spectroscopy. This method has a lower
detection limit of 0.02% TGC and an upper detection limit of 50% TGC.
A Quality Assurance and Quality Control (QAQC) program was used to monitor the drill
sampling and sample analyses, using certified reference materials, blanks and field
duplicates. The results of the QAQC programs indicate acceptable levels of accuracy and
precision of analytical results.
Estimation Methodology
A block model with parent cell sizes of 25 m (E) by 12.5 m (N) by 10 m(Z) was constructed,
with block sizes approximately half the typical drill spacing, which generally supports an
Indicated classification. Blocks and drill sample data were flagged according to the
geological, mineralisation and weathering domain models. Drill holes were composited to 2
m intervals, being the typical sample length, and composited sample data were statistically
reviewed to determine appropriate top cuts for TGC. The four mineralisation domains are
treated as hard estimation domains, with variograms modelled for TGC for the most
populated domain. The variogram model was used to support grade interpolation in the
other three TGC domains.
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
Visit our investor hub: investorhub.buxtonresources.com.au
Ordinary kriging (OK) was used to interpolate TGC grades using three estimation passes. A
sample search ellipse with radii 200 m x 200 m x 20 m was used, which was aligned with the
strike and dip of the mineralisation models. A minimum of 8 samples and maximum of 16
samples were used per block estimate, and a maximum of 5 samples per hole per block
estimate was used. Top cut and composited sample assays were interpolated.
Density measurements were taken from drill core samples segment using the Archimedes
method (water displacement). A total of 350 measurements have been taken since 2013. The
density measurements were flagged by lithological and weathering domain, and a mean
density values per lithological and weathering domains were calculated. The mean density
grades were assigned to the corresponding domain in the block model. Typical density
assignments include 2.3 t/m3 (oxide domain), 2.4 t/m3 (transitional) and 2.8 t/m3 (fresh rock
domain).
Mineral Resource Classification
The MRE has been classified in accordance with the JORC Code (2012). The Competent
Person classified the Graphite Bull Mineral Resource as Indicated, and Inferred based on drill
hole spacing, the quality assurance of the data, geological confidence in the continuity of
grade, quality of the local block grade estimates, and quantity and quality of density
measurement data. Consideration was also given to the results from metallurgical testwork,
to satisfy the requirements of reporting an Industrial Mineral Resource as per Clause 49 of
the JORC Code.
Indicated resources supported by drill spacing of approximately 60 m along strike, and with
at least two holes drilled per easting section. Indicated Mineral Resources at the eastern end
of the deposit are supported by 100 m spaced drill holes, but the Competent Person is
satisfied that there is adequate continuity of geology and mineralisation to support an
Indicated classification. Inferred Mineral Resources are based upon wider spaced drill
sections, of between 60 m and 150 m. Polygons were digitised for the mineralisation
domains using the above guidelines and were used as ‘cookie cutters’ to stamp the desired
classification level into the block model, on a domain by domain basis. This provided the
Competent Person complete control as to the assignment of classification into the block
model.
Block model validation indicates that the final block classification is a reasonable
representation of the input drill hole data and the geological features at the Project.
Cut-Off Grades
The MRE is reported above the 200 m RL, which is approximately at a depth of 200 m below
topographic surface. This depth is considered to be a reasonable depth to which
conventional open pit mining will reach.
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
Visit our investor hub: investorhub.buxtonresources.com.au
The MRE is reported above a cut-off grade of 7% TGC, which is recommended by Buxton
and based upon analyses of commodity prices, cost estimates for mining and processing,
and assumptions regarding a breakeven TGC grade. A grade tonnage table is included in
Table 2.
Mining and Metallurgical Methods
The CP has assumed that any mining of the Graphite Bull deposit will be by conventional
open-pit mining methods.
Seven broad phases of investigative work conducted on metallurgy, process, and products
at Graphite Bull. They are:
1) “2015 Composites” a sample of 127 kg @ 20.6% TGC from 2013-14 diamond core
collected Sept-Dec 2014, divided into “Fresh” and “Saprolite” samples, testwork and
flotation by SGS Lakeside (Canada), final report August 2015
2) “Bulk1” a sample of 132 kg @ 16.1% TGC from 2013-14 diamond core submitted
November 2022, batch testwork in Perth by ALS managed by D Pass, Battery Limits
(BL) and Peter Adamini (IMO). Bulk flotation by ALS/BL, 11.6 kg of concentrate
delivered to ProGraphite (Germany) in April 2023. Interim uPSG and electrochemical
testwork report January 2024, final spheronization testwork reported January 2025.
3) “Bulk2” a sample of 125 kg @ 17.4% TGC from 2013-14 diamond core, submitted to
IMO Perth in Jan 2023 for comminution, batch testwork and bulk flotation, with 12.3
kg of concentrate delivered to Dorfner Anzaplan (Germany) in August 2023. Final
report August 2024, but Anzaplan are now re-doing aspects of that testwork at no
charge on con from Bulk3
4) “Bulk3” a sample of 1,029 kg of RC chips @ 19.5% TGC from February 2023 scout
drilling outside the 2014 Resource, submitted to ALS Balcatta/BL in Jan ‘24. Final
report received October ’24. Con samples provided to Anzaplan and BTR in August
2024, with positive feedback from BTR
5) “Bulk4” a sample of 740 kg of RC chips @ 13.75% TGC from August-September 2024
drilling within the 2014 Resource, sent to BTR in China for in-house testwork. Arrival
in China later this month, with feedback expected early 2025
6) Elevated titanium values at GB noted in both mineralised and unmineralized material
(up to >2.5% Ti) were investigated in mid-2024 (BL/ALS), work focussed on the
potential to recover any rutile from rougher tails by heavy liquid separation
7) A CPC Engineering desktop study of possible products, markets and “baskets” for
GB concentrate, August 2023.
The work had specific goals;
•
•
•
Demonstrate production by conventional means of a commercially saleable >94%
TGC Flake concentrate at >85% flotation recovery
Demonstrate amenability of GB concentrate to micronising and spheroidization
Demonstrate successful HF-free purification to >99.95% TGC in uPSG
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
Visit our investor hub: investorhub.buxtonresources.com.au
•
•
Produce bulk >94% concentrate sample for further work
Investigate a range of potential products and markets.
Outcomes have been good to excellent with all goals achieved since the 2015 work by SGS
in Canada. Recent results, on material from the same drill holes as 2015 work, have generally
exceeded expectations, with batch flotation tests reaching concentrate grades up to 98.2%
TGC at 93.7% recovery.
Spheroidisation returned yields over 50% (and up to 68% via a two-stage process reported
by Anzaplan in January 2025, see ASX 15 January 2025) with on-spec SG characteristics.
Purification of SG by non-HF reagents has reached 99.99% TGC.
Improvements since 2015 are attributed to the differing focus of work (finer grinds), and local
flotation expertise specific to WA graphite deposits.
Competent Persons – Graphite Bull
The information in this report that relates to the current Mineral Resource estimate is based on, and
fairly reflects, information compiled by Mr David Williams and Mr. Martin Moloney. Mr. Williams (B.
Sc. Hons) is a full-time employee of ERM and is a Member of the Australian Institute of Geoscientists
(RPGeo). Mr. Moloney, (B. App Sc. Hons) is a Member of the Australian Institute of Geoscientists and
Society of Economic Geologists. Mr Moloney is a full-time employee of Buxton Resources Ltd. Mr
Williams is fully independent of Buxton resources. David Williams and Martin Moloney and have
sufficient experience relevant to the style of mineralisation and type of deposit under consideration
and to the activity which they are undertaking to qualify as Competent Persons as defined in the 2012
Edition of the Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore
Reserves (JORC Code). Mr David Williams and Mr Martin Moloney consent to the disclosure of the
information in this report in the form and context in which it appears. Mr Martin Moloney assumes
responsibility for matters related to Sections 1 and 2 of JORC Table 1, while Mr David Williams
assumes responsibility for matters related to Section 3 of JORC Table 1.
The information in this report that relates to metallurgical test work managed by Battery Limits Pty
Ltd (BL) is based on, and fairly represents, information and supporting documentation reviewed by
Mr David Pass, BSc (Mineral Science and Chemistry), who is a Member of The Australasian Institute of
Mining and Metallurgy (AusIMM). Mr Pass is a full-time employee of BL, who has been engaged by
Buxton Resources Ltd to provide metallurgical consulting services. Mr Pass has approved and
consented to the inclusion in this document of the matters based on his information in the form and
context in which it appears. The information in this report that relates to metallurgical test work
managed by Independent Metallurgical Operations Pty Ltd (IMO) is based on, and fairly represents,
information and supporting documentation reviewed by Mr Peter Adamini, BSc (Mineral Science and
Chemistry), who is a Member of The Australasian Institute of Mining and Metallurgy (AusIMM). Mr
Adamini is a full-time employee of IMO, who has been engaged by Buxton Resources Ltd to provide
metallurgical consulting services. Mr Adamini has approved and consented to the inclusion in this
document of the matters based on his information in the form and context in which it appears.
The information in this report that relates to Exploration Results is based on information compiled by
Mr Martin Moloney. Mr. Moloney, (B. App Sc. Hons) is a Member of the Australian Institute of
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
Visit our investor hub: investorhub.buxtonresources.com.au
Geoscientists and Society of Economic Geologists. Mr Moloney is a full-time employee of Buxton
Resources Ltd. Mr Moloney has sufficient experience which is relevant to the activity being
undertaken to qualify as a “Competent Person” as defined in the 2012 edition of the Joint Ore
Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves. Mr Moloney consents to the inclusion in this report of the matters based
on the information in the form and context in which it appears.
Previously Reported Information – Graphite Bull Project
There is information in this announcement relating to exploration results previously announced on:
1. 24 October 2014 – Buxton significantly expands Graphite Resource at Yalbra
2. 13 March 2023 – Graphite Bull Update - Metallurgy
3. 19 April 2023 – Graphite Bull Drilling Assays
4. 23 October 2023 - Outstanding shallow conductors identified at Graphite Bull
5. 25 January 2024 – Anode Testing Success at Graphite Bull Project
6. 25 July 2024 – 84.6m of mineralisation intersected at Graphite Bull Project
7. 7 August 2024 – Anode testing success at Graphite Bull Project
8. 26 August 2024 – Graphite Bull & Narryer Project - Exploration Update
9. 24 October 2024 – Graphite Bull: Record Setting 124 m @ 16.6% TGC
10. 12 December 2024 – Graphite Bull delivers more shallow high-grade intersections
11. 15 January 2025 – Graphite Bull – Progress Update
Validity of Referenced Results
Buxton confirms that, except for the previous Mineral Resource Estimate (ASX Release 24 October
2014), which is superseded by the Mineral Resource Estimate published in this Release, it is not
aware of any new information or data that materially affects the information from previous ASX
Announcements which has been referenced in this Announcement.
About the Graphite Bull Project
The at-surface, high-grade Graphite Bull Project is located in the Tier 1 mining jurisdiction of Western
Australia, Gascoyne region, on granted Exploration License E09/1985. Graphite Bull was acquired by
Buxton in 2012 and by 2014 two resource estimates were completed. The Graphite Bull project
currently has a JORC (2012) compliant Inferred Resource of 20.73 Mt @ 10.8 % TGC (ASX 17/02/2025).
Due to projected growth of the global Lithium-ion battery market, and the essential part graphite will
play in that – graphite is the single largest component of Li-ion batteries – Buxton recommenced work
at Graphite Bull in 2022. Work since then has been focused on metallurgical test work through to final
product (Activated Anode Material), and increasing Resource confidence and size, with very promising
results to date.
Benchmark Mineral Intelligence predicts that global capacity of anode material will increase over
fivefold between 2024 and the end of the decade, reach over 15Mtpa, a huge increase from the
2.3Mtpa of operational capacity in 2024. This battery-related demand means that by 2027, global
graphite production needs to double and that, by 2040, eight times current production will be
required to supply the world’s lithium-ion battery anode market. S&P Global have a bullish outlook
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
Visit our investor hub: investorhub.buxtonresources.com.au
for the flake graphite market over the medium and longer terms with forecast prices to rise over the
medium term as the market deficit grows; while some latent capacity could ramp up, but not expected
to be sufficient to meet demand. Prices forecast to rise > 150% by 2029 and > 180% by 2035.
Ex-China battery anode capacity, and investment, is also being spurred by US trade policy. Graphite
Bull is therefore a very attractive project, being a high-grade deposit located in a Tier 1, US FTA, non
FEOC, mining jurisdiction, with ore materials having demonstrated excellent electrochemical
performance and with outstanding Resource growth potential. Buxton has also recently confirmed
the discovery of a new graphite mineral system at the Blackhawk Project, some 100 km south from
Graphite Bull.
Figure 4: Location map for Buxton’s Graphite Bull & Blackhawk Projects.
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
Visit our investor hub: investorhub.buxtonresources.com.au
Table 3: Graphite Bull Drill hole collar detalis (historic CEC holes were not used for Resource
estimation).
HoleID
GB001RC
GB002RC
GB003RC
GB004RC
GB005RC
GB006DD
GB007DD
GB008RC
GB009RC
GB010RC
GB011RC
GB012RC
GB013RC
GB014RC
GB015RC
GB016RC
GB017RC
GB018RC
GB019RC
GB020RC
GB021RC
GB022RC
GB023RC
GB024RC
GB025RC
GB026RC
GB027RC
GB028RC
GB029RC
GB030RC
GB031RC
GB032RC
GB033RC
GB034RC
YBDD001
YBDD002
YBDD003
YBRC001
YBRC002
PO Box 661
Nedlands WA 6009
North
7172725.43
7172812.61
7172797.32
7172921.92
7172525.12
7172481.68
7172612.38
7172676.85
7172668.82
7172625.78
7172901.24
7172923.34
7172923.93
7172905.97
7172865.97
7172885.12
7172886.56
7172916.99
7172842.90
7172761.68
7172722.54
7172920.62
7172927.60
7172888.77
7172845.35
7172878.30
7172780.73
7172795.14
7172795.37
7172763.86
7172763.49
7172746.74
7172836.37
7172816.72
7172844.04
7172886.80
7172859.89
7172852.62
7172772.71
East
435175.28
435266.79
435490.16
435914.11
434069.91
435128.62
435709.78
435187.90
435086.30
435092.84
435920.33
435870.39
435870.30
435750.11
435643.05
435751.26
435750.89
435983.58
435506.06
435388.23
435319.29
436110.53
435981.17
436116.01
435640.04
435632.20
435034.68
435124.99
435126.17
434966.54
434841.50
434912.74
435116.37
435394.02
434901.21
434995.86
435001.14
434884.51
434938.28
15 Robinson Av
Belmont WA 6104
RL
Depth (m) Azimuth Dip
Type
373.35
252.00
331.09 -54.93 RC
377.37
180.00
346.48 -60.53 RC
379.47
228.00
349.30 -75.54 RC
384.86
120.00
347.93 -68.95 RC
376.53
211.00
349.18 -79.94 RC
384.17
641.40
337.56 -66.58 DD
381.30
582.30
336.30 -60.07 DD
375.56
150.00
345.43 -61.67 RC
381.96
66.00
348.01 -59.40 RC
384.41
138.00
346.38 -60.97 RC
387.18
120.00
348.24 -80.54 RC
385.35
192.00
345.78 -80.31 RC
384.99
96.00
345.17 -55.69 RC
384.60
90.00
345.10 -60.69 RC
385.69
168.00
342.68 -70.36 RC
387.30
246.00
343.20 -75.38 RC
387.00
180.00
345.09 -60.66 RC
385.33
168.00
341.22 -75.49 RC
379.52
180.00
344.80 -65.88 RC
377.81
192.00
344.92 -65.26 RC
374.65
114.00
343.63 -60.99 RC
388.89
132.00
340.36 -61.20 RC
385.29
84.00
343.57 -55.65 RC
390.14
162.00
340.56 -60.54 RC
386.09
210.00
347.24 -76.47 RC
384.37
96.00
344.27 -55.78 RC
378.93
174.00
344.76 -61.16 RC
375.42
162.00
344.72 -67.73 RC
375.38
138.00
164.60 -65.55 RC
378.96
156.00
344.09 -60.53 RC
374.83
126.00
344.30 -61.10 RC
380.91
150.00
344.55 -60.63 RC
374.55
114.00
344.69 -55.01 RC
383.30
156.00
335.07 -60.61 RC
376.02
173.00
180.00 -55.00 DD
375.84
178.00
180.00 -55.00 DD
376.64
69.00
360.00 -80.00 DD
374.41
124.00
155.00 -55.00 RC
381.61
110.00
340.00 -55.00 RC
Year
2023
2023
2023
2023
2023
2024
2024
2024
2024
2024
2024
2024
2024
2024
2024
2024
2024
2024
2024
2024
2024
2024
2024
2024
2024
2024
2024
2024
2024
2024
2024
2024
2024
2024
2014
2014
2014
2013
2013
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
Visit our investor hub: investorhub.buxtonresources.com.au
HoleID
YBRC003
YBRC004
YBRC005
YBRC006
YBRC007
YBRC008
YBRC009
YBRC010
YBRC011
YBRC012
YBRC013
YBRC014
YBRC015
YBRC017
YBRC018
YBRC019
YBRC021
YBRC022
YBRC023
YBRC024
YBRC025
YBRC026
YBRC027
YBRC028
YBRC029
YBRD016
YBRD020
CEC_01
CEC_02
CEC_03
CEC_04
CEC_06
CEC_08
CEC_09
CEC_10
CEC_11
CEC_12
CEC_13
CEC_18
CEC_19
CEC_20
CEC_21
PO Box 661
Nedlands WA 6009
North
7172854.70
7172850.83
7172772.65
7172875.27
7174481.49
7174547.49
7174432.49
7174511.49
7172847.13
7172887.96
7172937.44
7172825.28
7172858.20
7172840.15
7172801.66
7172753.70
7172846.37
7172799.26
7172793.13
7172716.22
7172810.56
7172825.95
7172879.91
7172817.30
7172758.84
7172839.69
7172817.73
7172400.49
7172111.49
7172961.49
7172487.49
7172836.49
7172781.49
7172754.49
7172882.49
7172863.49
7172866.49
7172860.49
7172851.49
7172750.49
7172748.49
7172765.49
East
435330.86
435200.21
435116.78
434892.00
432600.02
432625.02
432601.02
432594.02
435001.76
434995.49
434992.73
435003.92
434788.01
434900.64
434782.59
434603.42
434859.63
434738.74
434604.75
434611.11
434691.20
434960.58
434933.80
434907.11
434704.81
434797.25
434844.71
434105.02
433981.02
434138.02
432713.02
434868.02
434938.02
435085.02
435210.02
436352.02
436332.02
435334.02
434928.02
434964.02
434761.02
434808.02
15 Robinson Av
Belmont WA 6104
RL
Depth (m) Azimuth Dip
Type
378.48
70.00
360.00 -55.00 RC
375.63
70.00
360.00 -55.00 RC
376.56
45.00
200.00 -55.00 RC
374.38
150.00
165.00 -60.00 RC
365.38
110.00
360.00 -55.00 RC
362.10
84.00
360.00 -55.00 RC
362.50
148.00
360.00 -55.00 RC
362.80
78.00
360.00 -55.00 RC
377.06
100.00
180.00 -55.00 RC
375.73
180.00
175.00 -55.00 RC
374.04
150.00
180.00 -55.00 RC
378.16
55.00
180.00 -55.00 RC
375.84
200.00
175.00 -60.00 RC
376.42
90.00
180.00 -55.00 RC
378.95
114.00
155.00 -50.00 RC
385.60
162.00
180.00 -55.00 RC
374.17
225.00
180.00 -55.00 RC
376.56
156.00
180.00 -55.00 RC
383.45
80.00
180.00 -55.00 RC
387.12
108.00
180.00 -55.00 RC
378.78
174.00
175.00 -58.00 RC
377.54
180.00
180.00 -