Porphyry Drill Targets Identified at Sun Devil & Aztecs
Released
Released
Announcement PDF
ASX Release
13th Feb 2024
Copper Wolf Project: Porphyry drill targets identified at Sun Devil and
Aztecs prospects (BUX 100%)
•
Heli-supported field program completed at Sun Devil and Aztecs Prospects
•
Intense veining and potassic alteration mapped at Sun Devil
•
86 rock chips submitted for geochemical analysis, results expected mid-April
•
Two drill targets defined by integration of new mapping with historical data
•
Wolverine drill permitting underway, fieldwork continuing at Yellow Jacket
Buxton Resources Ltd (ASX:BUX) is pleased report that geological mapping at the
Sun Devil and Aztec prospects has defined at least two untested porphyry Cu-Mo
targets on 100% BUX tenure.
Figure 1: Buxton's mapping & chip sampling at Sun Devil and Aztecs prospects with mapped vein
intensity & alteration limits. Figure 2 is a cross section along line A-B.
PO Box 661
Nedlands WA 6009
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
CEO Marty Moloney commented “The Sun Devil and Aztecs prospects provide
windows into different levels of the Copper Wolf porphyry system which is otherwise
covered in this area. Decades of progress in understanding Arizonan geology and
porphyry deposits worldwide is now enabling our systematic, boots-on-the-ground
exploration to confidently define these targets at depth. Integrating the information
gathered in this field program, along with the historical data and rock chip assays,
expected mid-April, will inform future drill testing of these exciting targets."
The Sun Devil prospect is located 5 km west-southwest from CPW0002DD (see ASX
Announcement 14th December 2023), and 7 km west-southwest from the Wolverine
Prospect where Buxton recently reported favourable mapping and geochemical
results (see ASX Announcement 11th January 2024).
Mapping at the Sun Devil prospect has identified a ~0.5 km2 window of intense
porphyry style veining and alteration (Figure 3 & Figure 6 - Figure 10). Post-mineral
volcanics cover the alteration system to the east and west with contacts being
variably faulted or unconformable (see Figure 2).
Figure 2: Interpretive geological cross section looking northwest through the western Copper Wolf
Project area. Two target zones of potassic alteration are shown at depth. These are likely to have
been part of the same porphyry system that has been dissected by the Burro Fault.
Potassic alteration at Sun Devil consists of k-feldspar and biotite, commonly as halos
around intense quartz + iron-oxide stockwork veining. These alteration minerals are
overprinted by sericite - a mineral characteristic of "phyllic" alteration zone. This
PO Box 661
Nedlands WA 6009
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
alteration system overprints Proterozoic lithologies including meta-granitoid, metadolerite, schist and pegmatite.
Figure 3: Sun Devil prospect, near photo point "b" (Figure 1). Intense quartz + iron oxide stockwork
veining cutting altered intrusive rock with potassic alteration in the form of k-feldspar vein halos.
88 rock chip samples collected during the helicopter-assisted mapping program have
been submitted to ALS for geochemical analysis (see locations on Figure 1). Results
are expected by mid-April.
Buxton constructed an interpretive geological cross section (Figure 2) by integrating
our proprietary mapping along with the historical drilling records (see Discussion
below) and published mapping by Ferguson & Johnson (2013).
The interpretation indicates that Sun Devil and Aztecs were part of a single vertical
porphyry system, now offset by the Burro Fault. Targets 1 & 2 represent zones of
potassic alteration which are interpreted to be preserved below both prospects
(Figure 4). Supergene enrichment blankets (zones of enriched copper formed during
weathering) are also interpreted to be preserved below the level of the Lebon
drillholes - see Discussion below.
PO Box 661
Nedlands WA 6009
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Figure 4: Schematic ross section showing generalised alteration-mineralization zoning patterns for
porphyry Cu deposits by Sillitoe (2010). The chlorite-sericite alteration zone is not typically found in
Cu-Mo systems, whichh are dominantly sericitic. The interpreted positions of the Sun Devil and Aztecs
prior to tilting & faulting of the Copper Wolf West porphyry system are annotated. Oxidiation and
supergene enrichemnt will overprint these alteration relationships.
Discussion on Historic Drilling
Historic drilling in this area is concentrated around the Aztecs prospect and totals
almost 2,600 metres (Table 1). The most recent program was completed in 2007 by
Lebon Gold and comprised three diamond drill holes SMC0701-703, all less than 250
metres deep. Geological and assay logs of these holes were reported by Eliopolous
& Nelson (2007). Buxton have recently acquired the Lebon drill core in excellent
condition (Figure 5).
PO Box 661
Nedlands WA 6009
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Prior to Lebon's work, Bear Creek Mining drilled a single hole "Stone No.3"using
rotary methods with 2.83 metres of diamond core collected at the bottom of hole
(Caviness, 1968) and Utah Corp (UC) subsequently drilled four wide spaced rotary /
diamond drill holes in the 1970s.
Buxton has sourced and compiled the original logs and tabulated assay data from all
historic drill holes. Significant intersections (multiple samples >.2% Cu) are
summarised in Table 1. Hole locations and assay data as sampled is provided in
Table 2 and Table 3 respectively.
The alteration notes from the Aztecs Prospect (from both Lebon and UC logs)
consistently describe sericite overprinting minor k-feldspar, which has then been
leached & oxidised during weathering. Eliopolous & Nelson (2007) also note that
"copper-bearing minerals are strongly fracture controlled, there are no (rare) copper
sulfides; copper shows are all "oxides"; including malachite, brochantite, azurite &
very rare chalcocite".
These observations are consistent with Buxton's surface mapping and provide strong
evidence that the upper portion of a typical porphyry Cu-Mo system is preserved
below Aztecs (e.g. Figure 4), and that promising targets for hypogene & supergene
mineralisation lie below the Lebon holes as shown on the cross section (Figure 2).
Eliopolous & Nelson (2007) also interpreted that post enrichment faulting must have
occurred with a normal offset downward to the West from RC-UC-02 such that the
supergene zone was inferred to lie ~60 metres vertically below the base of SMC0703.
Utah Corp's RC-UC-02 also intersected several zones of very high-grade Mo up to
1.52 m @ 2,950 ppm from 283.77 m downhole (see Table 3). Two additional assays
of 3.05 m @ 2,850 ppm Mo and 2.74 m @ 2,800 ppm Mo fall withing a composited
intersection of 23.77 m @ 846 ppm Mo from 190.81 m downhole (Table 1).
Significantly, SMC0703 intersected thin diorite porphyry dykes overprinted by
random vein stockwork with highly encouraging oxide copper grades including 2.29
m @ 3,020 ppm Cu from 6.10 m downhole (Table 1). Analysis of the Lebon core,
including age dating, can enable Buxton to establish the relationship between these
dykes and the intrusions intersected in Buxton's drilling at Bobcat (CPW0001DD &
2DD) and those mapped at Wolverine.
PO Box 661
Nedlands WA 6009
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Table 1: Assay composites from historical drilling demonstrating anomalous copper and molybdenum
values which are typical of leached / oxide zones above productive porphyry deposits.
Hole ID
SMC0703
From
(m)
6.10
To
(m)
9.14
Interval
(m)
3.05
Cu
(pct)
0.30
Mo
(ppm)
47
SMC0703
30.48
44.50
14.02
0.23
63
SMC0703
87.17
93.57
6.40
0.30
44
SMC0703
182.88
204.22
18.29
0.27
23
SMC0703
216.41
219.46
3.05
0.22
15
RC-UC-02
76.20
82.30
6.10
0.69
162
RC-UC-02
99.06
152.40
53.34
0.24
82
RC-UC-02
190.81
214.58
23.77
0.10
846
RC-UC-02
272.49
279.20
6.71
0.40
205
RC-UC-16
544.37
556.57
24.38
0.20
23
Notes
diorite porphyry, abundant veining & red
hematite on fractures
sheared fragmental & diorite, includes 1.83 m @
0.51% Cu (42.67 m-44.5 m)
basalt, maroon hematite coated, brochantite
proximal to quartz veins
quartz monzonite; including band of CuOxhematite (0.35% Cu 188.98 m-192.02 m)
quartz monzonite; band of blue CuOx-hematite
@ 216.87 m
black biotite schist, sericite-clay alteration,
chrysocolla along fractures
biotite granite, clay-sericite alteration, first
appearance of sulfides.
base of volcanics at 544.37 metres. (eoh at
561.14 m)
Length-weighted composited >0.2% Cu or >400 ppm Mo. Buxton cautions that historical records from Utah
Corp (RC-UC prefixes) and Lebon Gold (SMC prefixes) do not comprehensively detail sampling techniques and
data per JORC 2012 reporting standards - see JORC 2012 Table 1: Section 1 below for more details.
Figure 5: Lebon drill core from 2007 in excellent condition recently acquired by Buxton.
PO Box 661
Nedlands WA 6009
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Figure 6: Photo point "a" from Figure 1. Intense quartz + iron oxide stockwork
veining containing biotite alteration halos overprinting Proterozoic host rock
(granitoid?). Iron oxides form during leaching of sulfides.
Figure 7: Photo point "b" from Figure 1. Outcrop dominated by quartz + iron
oxide stockwork veining with k-feldspar alteration overprinted by sericite.
PO Box 661
Nedlands WA 6009
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Figure 8: Photo point "c" from Figure 1. Residual quartz + iron oxide stockwork
veining in weathered porphyritic intrusive.
Figure 9: Photo point "d" from Figure 1. Intense quartz + iron oxide stockwork
veining with k-feldspar halos cutting Proterozoic metagrantic rocks, manganese
oxides coat fractures.
PO Box 661
Nedlands WA 6009
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Figure 10: Photo point "e" from Figure 1. Intense quartz + iron oxide vein
stockwork cutting bleached host rock.
Figure 11: Photo point "f" from Figure 1. Outcropping quartz + iron oxide
stockwork veining containing sericitic halos from the Aztecs prospect.
PO Box 661
Nedlands WA 6009
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Figure 12: Copper Wolf Project tenure situation showing ~30.2 km2 area (coloured & outlined
polygons) for which Buxton has 100% interest in the subsurface estate (unencumbered except for
IGO's First Right of Refusal, see Table 1, Section 2). These areas include substantial basement
exposures indicating potential for copper porphyry mineralisation at shallower depths in comparison
to the Bobcat, Rattler and Coyote prospects. The BUX / IGO JV covers ~11.0 km2 and includes the
supergene blanket which has been the focus of previous exploration including historical resource
estimates by Liontown and others.
The next steps at Copper Wolf West include a detailed review of the Lebon drill core.
Buxton is awaiting permits to drill at Wolverine, where a drone magnetic survey is
expected to commence late February / early March. Geological mapping and rock
chip sampling will continue on newly staked tenure around Yellow Jacket.
This release is authorised by the Board of Buxton Resources Limited. For further
information, please contact:
Martin Moloney
Chief Executive Officer
marty@buxtonresources.com.au
PO Box 661
Nedlands WA 6009
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
Sam Wright
Company Secretary
sam@buxtonresources.com.au
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
About the Copper Wolf Project
The Copper Wolf Project has multiple historical resource estimates available that confirm the presence of
a large porphyry Cu-Mo system. Porphyry Cu-Mo mineralisation at Copper Wolf has been dated at
70.3 Ma (Laramide age) and is largely concealed by a post-mineral (Tertiary) sequence of volcanic and
sedimentary rocks.
The Project is located within one of the most prolifically endowed copper belts in the world (Figure
13), yet it has not seen any drilling since the early 1990s. Buxton’s 2022 airborne magnetic survey was
the first geophysical work undertaken since the early 1960s. Historic exploration has consisted of
relatively wide spaced drilling which focussed on significant supergene copper mineralisation located
where the NW trending Cow Creek Fault intersects Laramide hypogene porphyry style mineralisation.
Buxton is targeting high grade, underground bulk mineable copper-molybdenum mineralisation. In
this context, Buxton’s exploration approach can leverage the significant advances and ready
availability of modern geophysical targeting tools and mineral systems knowledge that have been
developed since exploration in this area ceased many decades ago.
Figure 13: Buxton’s Copper Wolf project is located in the prolific porphyry copper belt of SW USA /
Northern Mexico - most of the porphyry Cu-Mo deposits marked are current or previously operating
mines.
PO Box 661
Nedlands WA 6009
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Competent Persons
The information in this report that relates to Exploration Results is based on information compiled by
Mr Martin Moloney, Member of the Australian Institute of Geoscientists and Society of Economic
Geologist, and Mr Dale Cameron, Member of Australian Institute of Geoscientists. Mr Moloney and
Mr Cameron are full-time employees of Buxton Resources Ltd. Mr Moloney and Mr Cameron have
sufficient experience which is relevant to the activity being undertaken to qualify as a “Competent
Person” as defined in the 2012 edition of the Joint Ore Reserves Committee (JORC) Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Moloney and Mr
Cameron consent to the inclusion in this report of the matters based on the information in the form
and context in which it appears.
Validity of Referenced Results
Buxton confirms that it is not aware of any new information or data that materially affects the
information from previous ASX announcements which has been referenced in this announcement.
External Reports Referenced in this Release
Caviness, C.R., 1968, Final Report of Sheep Mountain, Yavapai County, Arizona, Internal Company
Report 06-01-0501, Bear Creek Mining Company.
Eliopolous G.J., & Nelson I., 2007, Sheep Mountain Drilling Project, Yavapai County, Arizona, USA,
Internal report to Lebon Gold Mines Limited.
Ferguson, C.A., and Johnson, B.J., 2013, Geologic map of the western half of the Columbia 7 ½ '
Quadrangle and the eastern half of the Copperopolis 7 ½ ' Quadrangle, Yavapai County, Arizona:
Arizona Geological Survey Digital Geologic Map DGM-109, scale 1:24,000
Sillitoe R.H., 2010, Porphyry Copper Systems. Economic Geology, 105 (1) p3–41
Tabulated Historic Drilling Data
Table 2: Copper Wolf West historical drill hole location details (NAD83).
Hole ID
Depth (m) Easting Northing Elevation Azi Dip Company / Year
RC-UC-02
297.48 370197 3767238
945
0 -90 Utah Corp 1969
RC-UC-16
561.14 369569 3766910
921
0 -90 Utah Corp 1974
RC-UC-19
581.26 369549 3767204
919
0 -90 Utah Corp 1978
RC-UC-20
297.18 370774 3767614
1077
0 -90 Utah Corp 1978
SMC0701
190.81 370375 3766988
1003 255 -60 Lebon Gold 2007
SMC0702
180.44 370451 3766975
997 255 -60 Lebon Gold 2007
SMC0703
247.50 370211 3766983
1009 255 -60 Lebon Gold 2007
Stone No.3
238.35 370904 3766909
1022
0 -90 Bear Ck 1968
Total:
2594.16
PO Box 661
Nedlands WA 6009
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
T. 08-9380 6063
E. info@buxtonresources.com.au
Cover (m)
0
545
430
226
3
21
6
160
www.buxtonresources.com.au
Table 3: Compiled assay data for historical drilling in the Copper Wolf West project area. Buxton
cautions that historical records from Utah Corp (RC-UC prefixes) and Lebon Gold (SMC prefixes) do
not comprehensively detail sampling techniques and data per JORC 2012 reporting standards - see
JORC 2012 Table 1: Section 1 below for more details.
Hole ID
From (m) To (m) Interval (m) Cu (pct) Mo (ppm)
RC-UC-02
6.10
6.86
0.76
0.008
36
21.34
1.52
0.024
105
0.051
119
0.050
42
RC-UC-02
15.24
18.29
RC-UC-02
24.99
28.44
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
19.81
28.44
31.52
33.22
35.36
39.32
41.61
42.98
47.55
50.60
53.34
56.39
59.44
60.96
63.70
68.88
70.41
74.68
76.20
79.55
82.30
85.04
90.22
92.96
96.93
RC-UC-02
RC-UC-02
RC-UC-02
PO Box 661
Nedlands WA 6009
41.61
42.98
47.55
50.60
53.34
56.39
59.44
60.96
63.70
68.88
70.41
74.68
76.20
79.55
82.30
85.04
90.22
92.96
96.93
99.06
108.51
108.51
RC-UC-02
39.32
105.16
RC-UC-02
RC-UC-02
35.36
102.11
102.11
RC-UC-02
33.22
99.06
RC-UC-02
RC-UC-02
31.52
109.73
111.56
114.61
117.65
119.63
122.83
105.16
109.73
111.56
114.61
117.65
119.63
122.83
124.97
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
3.05
3.44
3.08
1.71
2.13
3.96
2.29
1.37
4.57
3.05
2.74
3.05
3.05
1.52
2.74
5.18
1.52
4.27
1.52
3.35
2.74
2.74
5.18
2.74
3.96
2.13
3.05
3.05
3.35
1.22
1.83
3.05
3.05
1.98
3.20
2.13
0.011
0.011
0.245
16
47
29
0.033
26
0.013
40
0.013
49
0.100
57
0.065
0.022
51
32
0.049
147
0.092
61
0.025
28
0.090
0.110
47
86
0.150
260
0.056
229
0.120
0.430
1.010
0.097
0.072
0.098
190
180
141
141
123
98
0.043
33
0.017
19
0.200
0.260
86
95
0.480
102
0.310
125
0.250
145
0.210
0.220
0.190
81
187
0.075
0.110
T. 08-9380 6063
E. info@buxtonresources.com.au
72
54
41
www.buxtonresources.com.au
Hole ID
From (m)
RC-UC-02
129.54
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
PO Box 661
Nedlands WA 6009
To (m)
Interval (m)
Cu (pct)
Mo (ppm)
133.50
3.96
0.260
15
124.97
129.54
133.50
135.64
135.64
138.99
140.82
143.56
146.61
148.13
149.66
152.40
156.67
159.72
162.76
166.42
168.86
173.74
179.83
184.71
186.84
189.89
190.81
193.55
196.29
199.64
202.69
206.05
209.09
212.14
214.58
215.19
219.46
225.55
230.89
233.48
234.70
235.98
240.79
245.67
248.72
253.59
259.63
138.99
140.82
143.56
146.61
148.13
149.66
152.40
156.67
159.72
162.76
166.42
168.86
173.74
179.83
184.71
186.84
189.89
190.81
193.55
196.29
199.64
202.69
206.05
209.09
212.14
214.58
215.19
219.46
225.55
230.89
233.48
234.70
235.98
240.79
245.67
248.72
253.59
259.63
260.42
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
4.57
2.13
3.35
1.83
2.74
3.05
1.52
1.52
2.74
4.27
3.05
3.05
3.66
2.44
4.88
6.10
4.88
2.13
3.05
0.91
2.74
2.74
3.35
3.05
3.35
3.05
3.05
2.44
0.61
4.27
6.10
5.33
2.59
1.22
1.28
4.82
4.88
3.05
4.88
6.04
0.79
0.034
49
0.099
25
0.380
52
0.370
0.280
55
71
0.430
102
0.210
130
0.150
0.240
193
53
0.027
41
0.200
56
0.015
49
0.033
36
0.017
82
0.052
74
0.044
41
0.130
28
0.065
54
0.130
0.052
61
32
0.220
2800
0.065
185
0.003
0.061
0.051
0.086
103
480
32
54
0.200
2850
0.650
2
0.120
450
0.038
71
0.042
85
0.087
44
0.180
135
0.099
138
0.052
41
0.120
0.120
0.059
0.110
0.036
0.061
T. 08-9380 6063
E. info@buxtonresources.com.au
24
45
35
32
62
88
www.buxtonresources.com.au
Hole ID
From (m)
RC-UC-02
262.86
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-02
RC-UC-16
RC-UC-16
RC-UC-16
RC-UC-16
RC-UC-16
RC-UC-16
RC-UC-16
RC-UC-16
RC-UC-16
RC-UC-16
RC-UC-16
RC-UC-16
RC-UC-16
RC-UC-16
RC-UC-19
RC-UC-19
RC-UC-19
RC-UC-19
RC-UC-19
RC-UC-19
RC-UC-19
RC-UC-19
RC-UC-19
RC-UC-19
RC-UC-19
PO Box 661
Nedlands WA 6009
To (m)
Interval (m)
Cu (pct)
Mo (ppm)
263.96
1.10
0.085
134
0.046
130
0.078
47
260.42
262.86
263.96
266.70
266.70
268.22
269.44
272.49
275.54
279.20
281.27
283.77
285.29
288.34
292.00
294.44
295.96
297.18
268.22
269.44
272.49
275.54
279.20
281.27
283.77
285.29
288.34
292.00
294.44
295.96
297.18
2.44
2.74
1.52
1.22
3.05
3.05
3.66
2.07
2.50
1.52
3.05
3.66
2.44
1.52
1.22
544.37
297.48
547.73
0.30
547.73
550.77
3.05
544.37
547.73
550.77
550.77
553.82
553.82
554.43
554.43
556.57
556.57
559.31
559.31
454.15
515.11
518.16
527.31
530.35
560.83
563.88
566.93
569.98
576.07
579.12
547.73
550.77
553.82
553.82
554.43
554.43
556.57
556.57
559.31
559.31
561.14
561.14
457.20
518.16
527.31
530.35
533.40
563.88
566.93
569.98
573.03
579.12
581.25
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
3.35
3.35
3.05
3.05
3.05
0.61
0.61
2.13
2.13
2.74
2.74
1.83
1.83
3.05
3.05
9.14
3.05
3.05
3.05
3.05
3.05
3.05
3.05
2.13
0.038
0.100
0.039
88
74
46
0.180
290
0.058
6
0.666
0.053
101
76
0.130
2950
0.100
109
0.072
118
0.049
0.056
0.032
97
163
13
0.090
-1
0.430
20
0.054
17
0.390
20
0.080
30
0.210
20
0.060
20
0.280
13
0.260
10
0.130
25
0.120
40
0.023
13
0.020
10
0.058
22
0.060
0.019
1
10
0.047
220
0.620
14
0.042
18
0.036
150
0.012
100
0.026
0.009
0.017
0.073
0.036
130
190
160
60
140
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Hole ID
From (m)
RC-UC-20
225.55
RC-UC-20
RC-UC-20
RC-UC-20
RC-UC-20
RC-UC-20
RC-UC-20
RC-UC-20
RC-UC-20
RC-UC-20
RC-UC-20
RC-UC-20
RC-UC-20
RC-UC-20
SMC0701
SMC0701
SMC0701
SMC0701
228.60
249.94
265.18
274.32
277.37
280.42
283.46
286.51
289.56
292.61
295.66
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
PO Box 661
Nedlands WA 6009
226.31
0.76
0.026
2
231.65
252.98
268.22
277.37
280.42
283.46
286.51
289.56
292.61
295.66
3.05
2.29
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
0.00
297.18
3.05
1.52
6.10
9.14
3.05
3.05
6.10
9.14
12.19
15.24
18.29
18.29
SMC0701
Mo (ppm)
228.60
SMC0701
SMC0701
Cu (pct)
226.31
12.19
SMC0701
Interval (m)
225.55
SMC0701
SMC0701
To (m)
222.50
21.34
24.38
27.43
30.48
33.53
36.58
39.62
42.67
45.72
48.77
51.82
54.86
57.91
60.96
64.01
67.06
70.10
73.15
76.20
79.25
82.30
15.24
21.34
24.38
27.43
30.48
33.53
36.58
39.62
42.67
45.72
48.77
51.82
54.86
57.91
60.96
64.01
67.06
70.10
73.15
76.20
79.25
82.30
85.34
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
0.005
140
0.060
0.078
0.001
6
6
5
0.076
14
0.051
48
0.054
0.780
0.048
0.044
0.043
0.048
0.096
0.008
0.006
0.008
0.011
0.007
0.024
0.007
0.007
0.006
0.005
0.011
0.007
0.006
0.018
0.013
0.025
0.009
0.023
0.010
0.012
0.007
0.011
0.014
0.027
0.041
0.045
0.059
0.031
T. 08-9380 6063
E. info@buxtonresources.com.au
65
36
22
16
20
24
20
56
60
77
48
37
54
67
49
50
27
69
14
28
48
90
63
50
61
39
30
17
63
33
59
31
33
42
29
www.buxtonresources.com.au
Hole ID
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
From (m)
To (m)
Interval (m)
Cu (pct)
Mo (ppm)
88.39
91.44
3.05
0.027
34
85.34
91.44
94.49
103.63
106.68
SMC0701
106.68
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0701
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
PO Box 661
Nedlands WA 6009
97.54
100.58
100.58
SMC0701
94.49
97.54
SMC0701
SMC0701
88.39
109.73
112.78
115.82
118.87
121.92
124.97
128.02
131.06
134.11
137.16
140.21
143.26
146.30
149.35
152.40
155.45
158.50
161.54
164.59
167.64
170.69
173.74
176.78
179.83
182.88
185.93
188.98
21.34
24.38
27.43
30.48
33.53
36.58
39.62
103.63
109.73
112.78
115.82
118.87
121.92
124.97
128.02
131.06
134.11
137.16
140.21
143.26
146.30
149.35
152.40
155.45
158.50
161.54
164.59
167.64
170.69
173.74
176.78
179.83
182.88
185.93
188.98
190.81
24.38
27.43
30.48
33.53
36.58
39.62
42.67
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
1.83
3.05
3.05
3.05
3.05
3.05
3.05
3.05
0.013
0.045
0.041
0.055
0.069
0.061
0.076
0.087
0.018
0.014
0.014
0.011
0.056
0.032
0.012
0.011
0.027
0.058
0.018
0.047
0.032
0.046
0.019
0.017
0.028
0.019
0.010
36
23
18
39
15
27
15
23
29
24
31
21
87
21
13
12
18
31
47
34
29
27
20
26
23
19
9
0.015
11
0.044
15
0.018
0.055
0.026
0.017
0.008
0.005
0.005
0.016
0.027
0.057
0.005
0.011
T. 08-9380 6063
E. info@buxtonresources.com.au
13
25
10
10
10
24
33
45
24
29
26
47
www.buxtonresources.com.au
Hole ID
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
From (m)
To (m)
Interval (m)
Cu (pct)
Mo (ppm)
45.72
48.77
3.05
0.008
43
42.67
48.77
51.82
54.86
57.91
60.96
64.01
67.06
70.10
73.15
76.20
79.25
82.30
85.34
88.39
91.44
94.49
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
PO Box 661
Nedlands WA 6009
60.96
64.01
67.06
70.10
73.15
76.20
79.25
82.30
85.34
88.39
91.44
94.49
97.54
106.68
106.68
SMC0702
57.91
103.63
SMC0702
SMC0702
54.86
100.58
100.58
SMC0702
51.82
97.54
SMC0702
SMC0702
45.72
109.73
112.78
115.82
118.87
121.92
124.97
128.02
131.06
134.11
137.16
140.21
143.26
146.30
149.35
152.40
155.45
158.50
161.54
164.59
167.64
103.63
109.73
112.78
115.82
118.87
121.92
124.97
128.02
131.06
134.11
137.16
140.21
143.26
146.30
149.35
152.40
155.45
158.50
161.54
164.59
167.64
169.16
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
1.52
0.010
0.097
0.008
0.010
0.040
0.028
0.069
0.069
0.019
0.060
0.040
0.072
0.102
0.103
0.088
0.061
0.093
0.074
0.070
0.050
0.041
0.042
0.045
0.039
0.042
0.106
0.024
0.028
0.032
0.022
0.028
0.039
0.027
0.020
0.022
0.031
0.055
0.031
0.030
0.039
0.077
T. 08-9380 6063
E. info@buxtonresources.com.au
47
32
98
21
27
48
28
18
46
34
26
24
54
29
55
39
47
34
75
30
41
39
51
27
23
34
22
20
23
25
46
35
25
20
25
23
34
22
18
43
34
www.buxtonresources.com.au
Hole ID
From (m)
SMC0702
170.08
SMC0702
SMC0702
SMC0702
SMC0702
SMC0702
SMC0703
SMC0703
SMC0703
SMC0703
172.21
173.74
176.78
0.00
3.05
6.10
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
PO Box 661
Nedlands WA 6009
170.99
0.91
0.070
51
173.74
176.78
179.83
3.05
6.10
9.14
9.14
12.19
15.24
18.29
18.29
SMC0703
Mo (ppm)
172.21
SMC0703
SMC0703
Cu (pct)
170.99
12.19
SMC0703
Interval (m)
170.08
SMC0703
SMC0703
To (m)
169.16
21.34
24.38
27.43
30.48
33.53
36.58
39.62
42.67
44.50
45.72
48.77
51.82
54.86
57.91
60.96
64.01
67.06
70.10
73.15
76.20
79.25
82.30
85.34
87.17
91.44
93.57
15.24
21.34
24.38
27.43
30.48
33.53
36.58
39.62
42.67
44.50
45.72
48.77
51.82
54.86
57.91
60.96
64.01
67.06
70.10
73.15
76.20
79.25
82.30
85.34
87.17
91.44
93.57
97.54
97.54
100.58
103.63
106.68
100.58
103.63
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
0.91
1.22
1.52
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
1.83
1.22
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
3.05
1.83
4.27
2.13
3.96
3.05
3.05
3.05
0.058
29
0.082
23
0.091
27
0.022
27
0.058
28
0.015
46
0.041
48
0.302
47
0.062
46
0.040
36
0.088
48
0.039
28
0.028
33
0.079
19
0.029
26
0.130
24
0.272
86
0.173
51
0.181
97
0.512
53
0.117
19
0.052
33
0.035
46
0.035
33
0.046
23
0.045
33
0.040
28
0.029
26
0.039
77
0.025
56
0.028
0.035
52
35
0.062
110
0.075
25
0.057
0.309
0.275
0.072
0.075
0.248
0.054
T. 08-9380 6063
E. info@buxtonresources.com.au
67
44
43
30
36
24
23
www.buxtonresources.com.au
Hole ID
From (m)
SMC0703
109.73
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
SMC0703
PO Box 661
Nedlands WA 6009
To (m)
Interval (m)
Cu (pct)
Mo (ppm)
112.78
3.05
0.135
51
106.68
109.73
112.78
115.82
115.82
118.87
121.62
124.66
128.02
130.45
131.37
133.20
133.81
137.16
140.21
143.26
146.30
149.35
152.40
155.45
158.50
161.54
164.59
167.64
170.69
173.74
176.78
179.83
182.88
185.93
188.98
192.02
195.07
198.12
201.17
204.22
207.26
210.31
213.36
216.41
219.46
222.50
225.55
118.87
121.62
124.66
128.02
130.45
131.37
133.20
1
Share your feedback
Discover