QUARTERLY ACTIVITIES REPORT for
the period ending 31 December 2023
Graphite Bull Project (100% BUX)
•
•
Dual-stream electrochemical testwork to test multiple process options
continued with ProGraphite and Dorfner Anzaplan GmbH
Loupe Ground EM survey reveals numerous graphite targets for shallow
resource extension
Copper Wolf Project; Arizona USA (100% BUX, IGO option to earn 70%)
•
•
Assay results reported from CPW0002DD, including 405.38m @ 0.35% Cu
and 0.05% Mo.
Site visit by an independent expert, which confirmed a large, mineralised
porphyry Cu-Mo system
Dogleg Prospect, West Kimberley JV (16% BUX)
•
High-grade nickel sulphide assays (13.85m at 4.35% Ni, 0.34% Cu and 0.15%
Co) confirm significant magmatic nickel sulphide discovery 13km along strike
from Merlin
Narryer Project (100% BUX)
•
Coincident soil sample anomalies (Ni/Cu) over gravity high along strike from
existing ground EM conductor at Ranger
Centurion Project (100% BUX)
•
Agreements signed with three Native Title groups to allow for heritage
surveys and track construction in 2024 field season.
Corporate
•
•
•
AGM held 17 November 2023, all resolutions that were put to shareholders
were passed by a poll
Cash balance (31 December 2023) of approximately $1.6 million
$579k Copper Wolf exploration cash call received from IGO Limited post
balance date (and not included in the Appendix 5B)
PO Box 661
Suite 1, First Floor
T. 08-9380 6063
Nedlands WA 6009
14-16 Rowland Street
E. info@buxtonresources.com.au
Subiaco WA 6008
www.buxtonresources.com.au
Buxton Resources Limited (ASX: BUX or “Buxton”) is pleased to release the Quarterly
activities report and Appendix 5B for the period ended 31 December 2023 (the
Quarter).
Graphite Bull Project (BUX 100%)
The Graphite Bull Project (Exploration License E09/1985) is located 280 km East of
Carnarvon in the Murchison Region of Western Australia. In 2014, Buxton released
an updated, JORC 2012 compliant, Mineral Resource Estimate for the main zone of
graphite mineralisation. The Inferred Mineral Resource is 4.0Mt @ 16.2% TGC, using
a 4% TGC cut-off (see ASX announcement 24th October 2014).
During the Quarter, continued the dual-stream electrochemical testwork aimed at
evaluating multiple process options for the Graphite Bull concentrate material.
Initial results from ProGraphite on the first bulk concentrate sample directed toward
the assessment of Li-ion battery quality benchmarks were exceeded by simple caustic
bake purification achieving 99.97% TGC. Spheronising gave excellent shape and size
distribution, yield also above average. Concentrate micronised well with relatively
little energy input – see ASX Announcement 7th August 2023 for further details.
During the Quarter Buxton announced the results of an extensive high-resolution
ground EM survey (Loupe EM) which detected numerous shallow conductors which
represent shallow targets for additional graphite resources.
During the Quarter a heritage survey scheduled for early November was deferred
due to a death in the community. Buxton continues to engage with the Wajarri
Yamaji Aboriginal Corporation and the Burringurrah Land Committee with a view to
undertaking this survey in H1, 2024.
Copper Wolf Project (BUX 100% / IGO option to earn 70%)
Buxton’s Copper Wolf Project consists of Lode Mining Claims and Mineral
Exploration Permits in Yavapai County, Arizona. The Copper Wolf Project has
multiple historical resource estimates available that confirm the presence of a large
Laramide porphyry Cu-Mo system (see ASX Announcement 25 October 2021).
PO Box 661
Suite 1, First Floor
T. 08-9380 6063
Nedlands WA 6009
14-16 Rowland Street
E. info@buxtonresources.com.au
Subiaco WA 6008
www.buxtonresources.com.au
Porphyry Cu-Mo mineralisation at Copper Wolf is largely concealed by a post-mineral
(Tertiary) sequence of volcanic and sedimentary rocks. The Project is located within
one of the most prolifically endowed copper belts in the world, yet it has not seen
any drilling since the early 1990s. Buxton’s 2022 airborne magnetic survey was the
first geophysical work undertaken since the early 1960s. Historic exploration has
consisted of relatively wide spaced drilling which focussed on significant supergene
copper mineralisation. Buxton is targeting high grade, underground bulk mineable
copper-molybdenum mineralisation.
On the 4th October August 2022, Buxton received shareholder approval for Buxton
and IGO to enter into an earn-in and joint venture agreement for the Copper Wolf
Project (Arizona, USA).
During the Quarter Buxton completed the first drilling campaign in the Project in
over 30 years and reported assay results from CPW0002DD, including 405.38m @
0.35% Cu and 0.05% Mo.
Also during the Quarter, a site visit was undertaken by an independent expert, which
confirmed a large, mineralised porphyry Cu-Mo system, the hypogene Cu-Mo grades
equalling or higher than those reported by previous explorers and recognition of
multiple Cu-Mo mineralising vein events and associated potassic alteration over a
vertical extent of >600 m. The scale and continuity of mineralisation provides
evidence of a large multi-phase porphyry copper-molybdenum mineral system.
Narryer Project (BUX 100%)
The Narryer Project is targeting magmatic Ni-Cu-PGE sulphide mineralisation along
the Yilgarn Craton margin within the Murchison Region of WA. The Narryer Project
consists of four ELs covering > 1800 km2. Buxton has completed substantive
systematic exploration programs since 2021.
During the Quarter Buxton received results from the soil sampling program
undertaken in the previous Quarter. A soil sample anomaly was detected coincident
with a gravity high and along strike from existing ground EM conductor at Ranger.
An additional MLEM program to cover this gravity high is scheduled for Q1 2024.
PO Box 661
Suite 1, First Floor
T. 08-9380 6063
Nedlands WA 6009
14-16 Rowland Street
E. info@buxtonresources.com.au
Subiaco WA 6008
www.buxtonresources.com.au
West Kimberley Project (BUX / IGO JV)
The West Kimberley Project is targeting Nova-style magmatic Ni-Cu sulphide
mineralisation in Proterozoic belts of the West Kimberley Region of Western
Australia. Buxton have Farm-In and JV agreements over three separate Project areas
(Merlin Project, Quickshears Project and West Kimberley Regional Project) which fall
within the overall West Kimberly Project.
During the Quarter, IGO intersected massive sulphides in the maiden drillhole at the
Dogleg prospect. A second hole intersected semi-massive sulphides.
Assays received for the first Dogleg hole contained 13.85m (true width 13.24m) at
4.35% Ni, 0.34% Cu, 0.15% Co from 177.34m, including: 5.86m (true width 5.60m)
at 7.47% Ni, 0.31% Cu, 0.25% Co from 179.08m.
Assay results for the second hole are pending.
Fraser Range Project (BUX 10% / IGO 90%)
Exploration The Fraser Range Project is targeting magmatic Ni-Cu sulphide
mineralisation along strike from IGO’s operating Nova mining operation. During the
Quarter IGO have continued their thorough exploration of these licenses. Buxton
remain free carried until completion of a feasibility study with Buxton retaining an
exclusive right to explore and develop iron ore on the Tenements.
During the Quarter, IGO reported having undertaken the following work programs;
-
interpretation of pseudo-3D seismic data within E28/2201 to generate
potential drill targets.
completed MLEM program was completed at Valetudo, in the northern
portion of tenement E28/1959.
Geophysical review of V5 Mag target within E28/2201.
Centurion Project (BUX 100%)
The Centurion Project consists of Exploration License E80/5579 located
approximately 180 km south-southwest of Balgo Western Australia on unclaimed
crown land and accessible via shire roads and several 1960s-1980s seismic lines. This
PO Box 661
Suite 1, First Floor
T. 08-9380 6063
Nedlands WA 6009
14-16 Rowland Street
E. info@buxtonresources.com.au
Subiaco WA 6008
www.buxtonresources.com.au
license covers a prominent dipolar and offset magnetic and gravity gradiometer
anomalies characteristic of Iron Oxide Copper Gold deposits including Olympic Dam
and Prominent Hill. Magnetic data indicate that the target is located approximately
700 metres beneath ground level under post mineral cover sequences of the Canning
Basin.
During the Quarter, Buxton executed three native title agreements to allow for
heritage surveys to be undertaken during the 2024 field season.
Shogun & Royale Projects (BUX 100%)
The Shogun and Royale Projects form a contiguous package covering 2617 km2
located in the Paterson Region of Western Australia. Exploration on the two (2)
Shogun Project ELA 45/6533 and 45/6534 is targeting magmatic Ni-Cu-Co-PGE
sulphide deposits. The five (5) Royale Project ELAs (E45/6228 through E45/6232)
cover exploration targets for hydrothermal Cu +/- Au – Mo deposits.
During the Quarter, Buxton continued to undertake negotiations with the Native
Title group with a view to executing a Heritage Agreement.
Lateron Project (BUX 100%)
The Lateron Project consists of Exploration License E80/5545 located on unclaimed
crown land close to the Tanami Road, approximately 10 km East of Billiluna and 150
km South of Halls Creek in Western Australia. During the Quarter Buxton received
the results of petrological analysis on fragments of diamond drill core recovered from
the site of AFMECO’s 1982 diamond drillhole S19. The report indicates the core
fragments consist of “biotite hornblende quartz diorite, with coarse titanite and
sericite / muscovite pyrite-magnetite-chalcopyrite overprint” – such rocks are
typically associated with magmatic-hydrothermal Cu-Au mineralisation. Airborne
mag indicates these intrusive rocks cover > 7 km2.
During the Quarter Buxton commenced negotiations with the new Native Title
Representative Body for the Tjurabalan (Jura-palan) People with a view to executing
a Heritage Agreement.
PO Box 661
Suite 1, First Floor
T. 08-9380 6063
Nedlands WA 6009
14-16 Rowland Street
E. info@buxtonresources.com.au
Subiaco WA 6008
www.buxtonresources.com.au
Corporate
The Company’s Quarterly Cashflow Report (Appendix 5B) follows this activities
report. The Company had $1.583 million in cash as 31 December 2023. A further
$0.579 million was received from IGO Limited in January 2024 and is not included in
the Appendix 5B. Exploration Expenditure for the Quarter was $0.733 million with
most of this expenditure being associated with field work in support of the Copper
Wolf Project, metallurgical studies in support of the Graphite Bull Project, along with
other ongoing project assessment. Buxton is also continuing to actively pursue
copper and other commodity opportunities in the USA.
The aggregate amount of payments to related parties and their associates included
in the current Quarter cash flows from operating activities were approximately $47k
comprising directors fees, salaries and superannuation. Corporate and other
administration expenditure was $222k for the Quarter which represents general costs
associated with running the Company, including ASX fees, legal fees, rent,
marketing, etc. Cash outflows for the Quarter were in line with management
expectations. The company is adequately funded to continue its current activities
and will continue to demonstrate appropriate fiscal management.
Annual General Meeting
On 17 November 2023, Buxton held its Annual General Meeting of Shareholders at
Suite 1, First Floor 14 - 16 Rowland Street, Subiaco, Western Australia. All resolutions
that were put to shareholders were passed by a poll.
Resignation of Non-Executive Director
Subsequent to the end of the Quarter, Buxton announced that non-executive
director, Eamon Hannon, had resigned from the Board with effect from 15 January
2024.
This announcement is authorised by the Board.
For further information, please contact:
Martin Moloney
Chief Executive Officer
marty@buxtonresources.com.au
Sam Wright
Company Secretary
sam@buxtonresources.com.au
PO Box 661
Suite 1, First Floor
T. 08-9380 6063
Nedlands WA 6009
14-16 Rowland Street
E. info@buxtonresources.com.au
Subiaco WA 6008
www.buxtonresources.com.au
Appendix 1: Changes in interests in mining tenements - Buxton
Resources Ltd 1/10/23 – 31/12/23
% at
beginning
of Quarter
% at end of
Quarter
Copper Wolf Project, Yavapai Co,
Arizona (Federal Lode Mining Claims)
0
option for 100
Copper Wolf Project, Yavapai Co,
Arizona (Federal Lode Mining Claims)
0
100
Madman Project
0
100
Tenement
Location / Project
Copper Chief
#1-5 &
Copper Chief
#18-19
Interests in mining
tenements relinquished,
reduced or lapsed
Interest in mining
tenements acquired or
increased
CW-216
through
CW-342 *
ELA69/4182
* changes occurred between end of the Quarter and issuing this report
E04/2451
West Kimberley - Baracus / IGO JV
16
E04/2060
West Kimberley Regional - IGO JV
20
20
E04/2407
West Kimberley Regional - IGO JV
20
20
E04/2408
West Kimberley Regional - IGO JV
20
20
E04/2411
West Kimberley Regional - IGO JV
20
20
E04/2527
West Kimberley Regional - IGO JV
20
20
E04/2530
West Kimberley Regional - IGO JV
20
20
E04/2536
West Kimberley Regional - IGO JV
20
20
E04/2549
West Kimberley Regional - IGO JV
20
20
E04/2550
West Kimberley Regional - IGO JV
20
20
E04/2578
West Kimberley Regional - IGO JV
20
20
E04/2579
West Kimberley Regional - IGO JV
20
20
E04/2580
West Kimberley Regional - IGO JV
20
20
E04/2581
West Kimberley Regional - IGO JV
20
20
E04/2584
West Kimberley Regional - IGO JV
20
20
E04/2585
West Kimberley Regional - IGO JV
20
20
E04/2609
West Kimberley Regional - IGO JV
20
20
E04/2611
West Kimberley Regional - IGO JV
20
20
E04/2612
West Kimberley Regional - IGO JV
20
20
E04/2613
West Kimberley Regional - IGO JV
20
20
E04/2614
West Kimberley Regional - IGO JV
20
20
E04/2615
West Kimberley Regional - IGO JV
20
20
E04/2617
West Kimberley Regional - IGO JV
20
20
E04/2629
West Kimberley Regional - IGO JV
20
20
PO Box 661
Suite 1, First Floor
T. 08-9380 6063
Nedlands WA 6009
14-16 Rowland Street
E. info@buxtonresources.com.au
Subiaco WA 6008
16
www.buxtonresources.com.au
E04/2630
West Kimberley Regional - IGO JV
20
20
E04/2631
West Kimberley Regional - IGO JV
20
20
E04/2648
West Kimberley Regional - IGO JV
20
20
E04/2649
West Kimberley Regional - IGO JV
20
20
E04/2650
West Kimberley Regional - IGO JV
20
20
E04/2651
West Kimberley Regional - IGO JV
20
20
E04/1972
West Kimberley – IGO/NWC/TT JV
16
16
E04/2314
West Kimberley – IGO/NWC/TT JV
16
16
E04/2423
West Kimberley – IGO/NWC/TT JV
20
20
E28/1959
Fraser Range - IGO JV
10
10
E28/2201
Fraser Range - IGO JV
10
10
E09/2427
Narryer Project
100
100
E09/2428
Narryer Project
100
100
E09/2429
Narryer Project
100
100
E09/2922
Narryer Project
100
100
E09/1985
Graphite Bull Project
100
100
LA09/102
Graphite Bull Project
100
100
LA09/103
Graphite Bull Project
100
100
EL80/5545
Lateron
100
100
EL80/5579
Centurion Project
100
100
MEP 008121028
MEP 008123390
MEP 008124215
SM-01
through
SM-54
CW-01
through
CW-215
Copper Wolf Project
(Section 16 T8NR1W G&SR Meridian)
Copper Wolf Project
(Section 9 T8NR1W G&SR Meridian)
Copper Wolf Project
(Section 29 T8NR1W G&SR Meridian)
Copper Wolf Project, Yavapai Co,
Arizona (Federal Lode Mining Claims)
100
100
100
100
100
100
100
100
Copper Wolf Project, Yavapai Co,
Arizona (Federal Lode Mining Claims)
100
100
Copper Wolf Project, Yavapai Co,
Arizona (Federal Lode Mining Claims)
0
100 (option)
CW-216
through
CW-342
ELA45/6228
Copper Wolf Project, Yavapai Co,
Arizona (Federal Lode Mining Claims)
0
100
Royale Project
100
100
ELA45/6229
Royale Project
100
100
ELA45/6230
Royale Project
100
100
ELA45/6231
Royale Project
100
100
ELA45/6232
Royale Project
100
100
Copper Chief
#1-5 &
Copper Chief
#18-19
PO Box 661
Suite 1, First Floor
T. 08-9380 6063
Nedlands WA 6009
14-16 Rowland Street
E. info@buxtonresources.com.au
Subiaco WA 6008
www.buxtonresources.com.au
ELA45/6233
Shogun Project
100
100
ELA45/6234
Shogun Project
100
100
Abbreviations and Definitions used in Tenement Schedule:
E = Exploration Licence (WA), ELA = Exploration Licence Application (WA), LA – Miscellaneous License Application (WA),
MEP = Mineral Exploration Permit (Arizona)
PO Box 661
Suite 1, First Floor
T. 08-9380 6063
Nedlands WA 6009
14-16 Rowland Street
E. info@buxtonresources.com.au
Subiaco WA 6008
www.buxtonresources.com.au
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Buxton Resources Limited
ABN
Quarter ended (“current quarter”)
86 125 049 550
31 December 2023
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(6 months)
$A’000
500
898
(733)
(2,512)
(b) development
-
-
(c) production
-
-
(d) staff costs
(336)
(562)
(e) administration and corporate costs
(222)
(424)
(a) exploration & evaluation
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
7
19
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other - GST
66
51
1.9
Net cash provided by/(used in) operating
activities
(718)
(2,530)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
-
-
(b) tenements
(44)
(44)
(c) property, plant and equipment
(1)
(4)
(d) exploration & evaluation
-
-
(e) investments
-
-
(f)
-
-
(a) entities
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(6 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements interests
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash provided by/(used in) investing
activities
(45)
(48)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other
-
-
3.10
Net cash from financing activities
-
-
4.
Net increase/(decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
2,349
4,145
4.2
Net cash provided by/(used in) operating
activities (item 1.9 above)
(718)
(2,530)
4.3
Net cash provided by/(used in) investing
activities (item 2.6 above)
(45)
(48)
4.4
Net cash from financing activities
(item 3.10 above)
-
-
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(6 months)
$A’000
4.5
Effect of movement in exchange rates on
cash held
(3)
16
444.
6
Cash and cash equivalents at end of
period
1,583
1,583
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
5.2
Current quarter
$A’000
Previous quarter
$A’000
1,479
2,249
Call deposits
-
-
5.3
Term deposits
128
128
5.4
Credit card
(28)
(28)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,583
2,349
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
47
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
8.3
Total relevant net cash inflow (item 8.1 + item 8.2)
(718)
8.4
Cash and cash equivalents at quarter end (item 4.6)
1,583
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
-
$A’000
(718)
-
1,583
2.20
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer:
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer:
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer:
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
30/01/2024
Date:
...................................................................................
By the Board
Authorised by: ...................................................................................
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.