High-Grade Nickel Sulphides Confirmed at Dogleg Prospect
Released
Released
Announcement PDF
ASX Release
6 Nov 2023
High-Grade Nickel Sulphides Confirmed at the Dogleg Ni-CuCo Prospect, West Kimberley Project, Western Australia
•
Assay results returned from first diamond drillhole at the Dogleg Prospect:
o 13.85 m (True Width 13.24 m) at 4.35% Ni, 0.34% Cu, 0.15% Co from
177.34 m, Including:
5.86 m (True Width 5.60 m) at 7.47% Ni, 0.31% Cu, 0.25% Co
from 179.08 m
•
Downhole electromagnetic (DHEM) survey completed on 23WKDD004 shows
strong in-hole response and provides additional focus outside the original
moving-loop electromagnetic (MLEM) conductor for potential follow-up drilling.
•
Assay results expected on the second hole (23WKDD004) in 3-7 weeks with a
program of work and future drill testing at Dogleg to be planned post assays.
•
This result triggers $500k payment to Buxton from JV partner IGO adding to the
$2.35M at the end of last quarter (see ASX announcement 31 October 2023)
Buxton Resources CEO Marty Moloney commented: “The Buxton and IGO technical
teams are extremely excited to report high grade nickel and cobalt mineralisation in
sulphides from the first diamond hole at the Dogleg Prospect within our West
Kimberley Project JV.
This result, along with previous exploration success at the Merlin Prospect, validates
our view that the West Kimberley Project has the potential to host Nova-Bollinger
style nickel sulphide deposits. Such deposits are notoriously difficult to find but the
success of the first two diamond holes at Dogleg, combined with highly anomalous
down-hole EM responses, provide Buxton and our JV partner IGO with enormous
encouragement.
We look forward to reporting the assays from the second hole in this program and
hope to build on this momentum with future drilling programs designed to fully
reveal the emerging exploration potential at Dogleg”.
PO Box 661
Nedlands WA 6009
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Buxton Resources (ASX:BUX) is pleased to announce that assay results have been
received for the first hole (23WKDD003) drilled into the Dogleg Prospect by joint
venture partner IGO Limited (ASX:IGO). Assay results have established the highgrade nature of the massive sulphides at the Dogleg Ni-Cu-Co Prospect that lie
within a broader zone of low-to-moderate grade mineralisation (Table 1).
The assays support the sulphide mineralisation species logged in the drill hole as
being a combination of pyrrhotite, pentlandite and chalcopyrite (Figure 1 - refer to
BUX ASX announcement 4th October 2023). No other deleterious elements have
been noted.
Table 1: Dogleg Prospect Significant Drill Intersections. Relationship of intercept length to estimated
true width is 95.6% for 23WKDD003.
Intercept (m)
Hole ID
Note
23WKDD003
includes
Assay Results
From
To
Length
Estimated
True Width
(m)
177.34
191.19
13.85
13.24
4.35
0.34
0.15
179.08
184.94
5.86
5.60
7.47
0.31
0.25
Ni
(pct)
Cu
(pct)
Co
(pct)
Figure 1: 23WKDD003 at 179.1 m - massive sulphide mineralisation with visually logged Ni and Cu
sulphides (refer to BUX ASX announcement 4th October 2023).
PO Box 661
Nedlands WA 6009
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Conditional Payments Pertaining to these Reported Drill Results
The reported drill intercept from 23WKDD003, satisfies the criteria (i.e., identification
of intercept with ≥20% m Ni) for deal structures (for the Quick Shears Project) with
New World Cobalt Limited (readers are referred to ASX:BUX announcement on the
6th November 2018 for further information) and IGO Limited (readers are referred to
ASX:BUX announcement on the 2nd October 2019) for the following conditional
payments (within 5- business days of this release):
•
•
Buxton Resources issues New World Cobalt Limited additional shares equal
to $250,000.
IGO Limited pays Buxton Resources a cash payment of $500,000.
About the Dogleg Prospect and Latest DHEM Results
The Dogleg Prospect (Figure 2) is located within tenement E04/1972 of the Quick
Shears Project (E04/1972, E04/2314, and E04/2423), targeting Nova-style magmatic
Ni-Cu sulphide mineralisation in the Proterozoic belt of the West Kimberley Region
of Western Australia.
The Dogleg Prospect was originally identified as an area of interest, based on the
interpretation of magnetic data suggesting it being in an analogous position to the
magnetic features that are associated with the Merlin Ni-Cu-Co Prospect.
A moving-loop electromagnetic (MLEM) geophysical survey was undertaken over the
magnetic features at Dogleg in 2022 identifying a 280 x 75 m, 12,000 Siemen
conductor (refer to BUX ASX announcement 14th September 2023).
An initial drilling program, consisting of a single diamond drillhole, targeted this
conductor. This hole, 23WKDD003, intersected massive sulphides from 179.06 m,
within a broader intersection of disseminated sulphide mineralisation (refer to BUX
ASX announcement 4th October 2023).
This sulphide mineralisation is hosted in the Ruins Dolerite, which sits within a similar
package of quartz-muscovite bearing metasediments of the Marboo Formation to
Merlin. A second hole (23WKDD004) was drilled 65 m down-plunge (pierce point) of
23WKDD003, and outside the area of the original MLEM conductor (Figure 3 and
Figure 4). This drillhole intersected 2.85 m (downhole length) of semi-massive (>60%)
sulphide mineralisation (refer to BUX ASX announcement 19th October 2023). Assay
results are expected from this drillhole in the next 3-7 weeks.
PO Box 661
Nedlands WA 6009
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Figure 2: Location of Dogleg Prospect in relation to the Merlin Ni-Cu-Co Prospect.
Downhole surveying of drillholes 23WKDD003 and 23WKDD004 both show strong
in-hole responses from sulphide mineralisation immediately surrounding the drill
holes. As such, the effectiveness of the DHEM technique to see away from the holes
is limited in terms of both strike and plunge. Combined interpretation of the DHEM
data does suggest a potential extension of the MLEM conductor down-plunge.
Modelling of the combined DHEM surveys has produced a 15,000 Siemen conductor
with dimensions of 100 m x 125 m, which supersedes the DHEM conductor previously
announced (refer to BUX ASX announcement 19th October 2023) but does not
supersede the original MLEM conductor (Figure 3 and Figure 4).
Moving Forward
• Lab assay results expected from 23WKDD004 in 3-7 weeks.
• After lab results are received from 23WKDD004, a program of works will be
defined that may include further drill testing of the Dogleg Prospect in 2024.
PO Box 661
Nedlands WA 6009
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Figure 3: Long Section showing the Dogleg MLEM and DHEM conductors, diamond drillhole traces
of 23WKDD003 and 23WKDD004, intersected sulphide mineralisation with assays reported here from
23WKDD003, and previously reported sulphide mineralisation intersected by 23WKDD004 (refer to
BUX ASX announcement 19th October 2023).
PO Box 661
Nedlands WA 6009
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Figure 4: North-South Section showing the Dogleg MLEM and DHEM conductors, diamond drillhole
traces of 23WKDD003 and 23WKDD004, intersected sulphide mineralisation with assays reported
here from 23WKDD003, and previously reported intersected sulphide mineralisation intersected by
23WKDD004 (refer to BUX ASX announcement 19th October 2023).
PO Box 661
Nedlands WA 6009
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
This release is authorised by the Board.
For further information, please contact:
Martin Moloney
Chief Executive Officer
marty@buxtonresources.com.au
Sam Wright
Company Secretary
sam@buxtonresources.com.au
About the West Kimberley JV Projects
The West Kimberley Project (Figure 5) is targeting Nova-style magmatic Ni-Cu-Co sulphide
mineralisation in Proterozoic belts of the West Kimberley Region of Western Australia. On the 10th
August 2015 Buxton announced the discovery of high tenor magmatic sulphide mineralisation in hole
DMRC003 at the Merlin Prospect. After additional technical work including substantial drilling
programs Buxton secured an Earn-In and Joint Venture agreement with IGO Limited whereby IGO
could earn up to 70% in the Double Magic Project tenements for $8M over 4 years. Buxton now have
Farm-In and JV agreements over three separate Project areas (Merlin / Double Magic Project, Quick
Shears Project and West Kimberley Regional Project) which fall within the overall BUX/IGO West
Kimberley JV Projects Area of Interest. On the 4th October 2022 Buxton received shareholder
approval for Buxton and IGO to amend the existing Merlin Project Joint Venture in the West Kimberley
(then at IGO 51% and BUX 49% ownership level) allowing IGO to earn a further 29% interest to take
IGO to 80% for a cash payment to Buxton of $1,000,000.
Figure 5: Location of BUX / IGO West Kimberley JVs (Quick Shears JV, Merlin / Double Magic JV and
the West Kimberley Regional JV).
PO Box 661
Nedlands WA 6009
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Competent Persons
Information in this report that relates to Exploration Results for the Quick Shears Project is based on
information compiled by Dr Ben Cave, who is a Member of Australasian Institute of Mining and
Metallurgy (MAusIMM; 318334). Dr Cave has sufficient experience relevant to the style of
mineralisation and type of deposit under consideration, and to the activities undertaken, to qualify as
a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC)
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr Cave
is a full-time employee of IGO Ltd and consents to the inclusion in the report of the matters based on
his information in the form and context in which it appears. Information in this report that relates to
previously reported Exploration Results has been crossed-referenced in this report to the date that it
was reported to ASX. Buxton Resources confirms that it is not aware of any new information or data
that materially affects information included in the relevant market announcements.
References to Previous Results
There is information in this announcement relating to exploration results previously announced on:
1)
2)
3)
4)
5)
6)
10 August 2015 - New Nickel Copper Discovery at Double Magic Ni-Cu Project
6 November 2018 – Buxton Acquires Large Land Holding Adjacent to Merlin, Double
Magic
2 October 2019 – West Kimberley JV Restructure
14 September 2023 - Drilling commences at the Double Magic Project
4 October 2023 - Massive Sulphides at Dogleg Ni-Cu-Co Prospect
19 October 2023 - Second Hole Intersects Semi-Massive Sulphides at Dogleg Ni-Cu-Co
Prospect
Buxton Resources Ltd confirms that it is not aware of any new information or data that materially
affects the information included in this announcement or the announcement referenced above.
PO Box 661
Nedlands WA 6009
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
JORC CODE, 2012 EDITION: SECTION 1 – KIMBERLEY – SAMPLING TECHNIQUES AND DATA
JORC Criteria
Explanation
Sampling techniques
•
Drilling
Diamond core drilling was completed using standard industry best practice.
•
Reported results are from diamond drilling with core samples taken from halved or quartered
(for duplicate samples) NQ2 core.
•
Sample intervals were determined according to the geology logging of the drill core.
•
Further information about the diamond drill holes is detailed in the following subsections.
Assay
Sample preparation was undertaken at ALS Limited – Perth and details of the methodology
and QA/QC provided in the following subsections.
•
DHEM
Down-hole Electromagnetic (DHEM) surveying was undertaken on 23WKDD004 by IGO’s inhouse geophysical crews, using the following configuration/parameters:
Configuration: Down-hole EM (DHEM)
Receiver: Digital Atlantis (A, U, V)
Transmitter: DRTX-e
Loop-Size: 400 m x 400 m
Current: 60A
Station Spacing: 5-10 m
Base Frequency: 0.5-0.25Hz
Drilling techniques
Drill sample recovery
Logging
PO Box 661
Nedlands WA 6009
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
•
DHEM surveys are an industry standard practice in testing the presence of bedrock conductors
potentially representing mineralised sulphide bodies.
•
Diamond drillholes were drilled by truck mounted rigs owned and operated by Westcore.
•
Holes were collared from surface with PQ-core (85mm inside diameter) and the diameter
decreased to HQ-core (63.5mm inside diameter), and NQ2-core (50.6 mm inside diameter) at
depths directed by the geologists.
•
The reported drill hole was drilled to a depth directed by IGO geologists.
•
All NQ core was orientated using a REFLEX ACT III orientation tool.
•
Sample recovery for core loss is recorded by the drillers with any core loss intervals noted on
annotated wooden blocks inserted into the core boxes by the driller.
•
Rod counts are routinely carried out and marked on the core blocks by the drillers to ensure
the marked core block depths are accurate.
•
Full assessment of recovery and orientation of drillcore was conducted at IGO’s core
processing facility in Broome, with QA/QC of the recovery assessed by reconstructing the core
into continuous runs in an angle iron cradle.
•
No core loss is recorded in the reported mineralised interval.
•
Qualitative logging of DD core included lithology, mineralogy, mineralisation, weathering,
colour and other features of the samples.
•
DD core was additionally logged in a quantitative manner in terms of structure and
geotechnical parameters.
•
The total lengths of all drill holes have been logged (unless stated otherwise).
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
JORC CODE, 2012 EDITION: SECTION 1 – KIMBERLEY – SAMPLING TECHNIQUES AND DATA
JORC Criteria
Sub-sampling
preparation
techniques
Explanation
and
sample
•
Photographs of all DD trays are taken and retained on file with the original core trays stored in
the core library.
•
The logging is considered adequate to support downstream exploration studies and follow-up
drilling.
•
DD core was generally subsampled into half-core using an automated wet-diamond-blade core
saw. Lengths of cut intervals submitted for assay were between 0.3 and 1 m. All samples
submitted for assay were selected from the same side of the core. Exceptions were for
duplicate samples of selected intervals, where quarter-core subsamples were cut from the halfcore.
•
Sample intervals were determined according to the geology logging of the drill core.
•
The sample sizes are appropriate to the grain size of the material being sampled.
•
The primary tool used to ensure representative drill core assays was monitoring and ensuring
near 100% core recovery.
•
The nature of the drilling method means representation is investigative with sampling aimed at
finding anomalous concentrations rather than absolute values for MRE work.
•
Sample preparation was undertaken at ALS Limited – Perth. ALS Limited – Perth:
−
Prepares each sample by oven drying 2.5 to 3kg of material for 12 hours at 100°C
(DRY-21). Samples are then crushed in a jaw-crusher to 70% passing 6 mm (CRU-21).
The entire sample is then pulverized in LM5 grinding robotic mills with low Cr-steel
pulverising bowls (particle size distribution (PSD) target of 85% passing 75 micron;PUL32). A 300g master pulp is collected for analysis, with the remaining “reject” pulp being
retained in storage.
− Quality control procedures involve insertion of certified reference materials (OREAS 85 and
OREAS 86), blanks, and collection of duplicates at the pulverisation stage.
− The results of quality control sampling are consistent with satisfactory sampling precision.
− The nature, quality, and sample preparation technique are considered appropriate for the style
of mineralisation submitted for assay.
Quality of assay data and laboratory tests
•
No geophysical tools were used to determine any element concentrations for reported
intervals.
•
ALS laboratories, Perth complete pulveriser size checks every 50th sample to ensure particle
size distribution compliance as part of routine internal quality procedures to ensure the target
PSD of 85% passing 75 µm is achieved.
•
Field duplicates, CRMs and blanks were routinely inserted at frequencies between 1:10 and
1:20 samples for DD sample streams.
•
Laboratory quality control processes include the use of internal lab standards using certified
reference materials (CRMs) and duplicates.
•
Certified reference materials (OREAS 85 and OREAS 86) were used to monitor accuracy and
have expected values ranging from low to high grade. These were inserted randomly into the
routine sample stream to the laboratory. Nickel, Cu, Co, Cr, and Mg were consistently checked
for accuracy.
•
The results of the CRMs confirm that the laboratory sample assay values have good precision
and accuracy. The results of blank assays indicate that any potential sample cross
contamination has been minimised.
•
Following sample preparation, samples were analysed by:
−
PO Box 661
Nedlands WA 6009
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
Four- acid digestion, with inductively coupled plasma spectroscopy (ICP-MS) finish
(ME-MS61r) for Ag, Al, As, Ba, Be, Bi, Ca, Cd, Ce, Co, Cr, Cs, Cu, Dy, Er, Eu, Fe, Ga,
Gd, Ge, Hf, Ho, In, K, La, Li, Lu, Mg, Mn, Mo, Na, Nb, Nd, Ni, P, Pb, Pr, Rb, Re, S, Sb,
Sc, Sc, Se, Sm, Sn, Sr, Ta, Tb, Te, Th, Ti, Tl, Tm, U, V, W, Y, Yb, Zn, Zr.
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
JORC CODE, 2012 EDITION: SECTION 1 – KIMBERLEY – SAMPLING TECHNIQUES AND DATA
JORC Criteria
Verification of sampling and assaying
Explanation
•
•
•
Location of data points
−
The digestion method can be considered near total for all elements.
−
Loss on ignition (LOI) was determined by robotic thermo gravimetric analysis at 1000˚C
(ME-GRA05).
Significant intersections were checked by senior IGO geological personnel.
Only two holes have been completed at the Dogleg Prospect; there are no twinned or scissor
holes.
The logging has been validated by an IGO on-site geologist and compiled onto the IGO
acQuire SQL drill hole database by IGO’s Geological Database Administrator.
•
Assay data are imported directly from digital assay files from contract analytical company ALS
(Perth) and are merged in the Company acQuire SQL drill hole database by IGO’s Geological
Database Administrator.
•
Data is backed up regularly in off-site secure servers.
•
No geophysical or portable XRF results are used in exploration results reported.
•
There have been no adjustments to the assay data.
•
The surface hole collar location was surveyed using a handheld Garmin GPS unit and
averaging for 90 seconds with an expected accuracy of ±6m for easting and northing with
elevation also recorded.
Drill path gyroscopic surveys were at 0m and at subsequent 18m downhole intervals to final
hole depth using a Reflex Gyro Omni tool.
The grid system is GDA94/MGA Zone 51 using AHD for elevation.
•
•
•
Two diamond drillholes have been completed to date at Dogleg Prospect. The first hole
(23WKDD003) intersected the middle of the modelled moving-loop electromagnetic (MLEM)
conductor. The Second drillhole (23WKDD004) was drilled 60 m down-plunge of the first
drillhole and intersected the bottom third of the modelled downhole electromagnetic (DHEM)
conductor, which was outside of the original MLEM modelled conductor.
•
Data spacing and distribution are not considered sufficient to establish the degree of geological
and grade continuity appropriate for Mineral Resource and Ore Reserve estimation.
•
All samples have been composited using length-weighted intervals for Public Reporting.
Orientation of data in relation to geological
structure
•
Drilling was undertaken perpendicular to the angle of the interpreted strike and dip of the
modelled MHEM and DHEM conductors. The true thickness is estimated to be 95.6% for
23WKDD003 and 91.0% for 23WKDD004. Downhole thickness is estimated using the dip and
orientation of the drillholes from survey data and measured dip and orientation of the target
geology.
Sample security
•
The chain-of-sample custody is managed by IGO staff from collection at the rig to the
submission of the samples to ALS Limited – Perth for analysis.
Samples were stored at the drill site before being transported and processed (cut) at IGO’s
core processing facility in Broome.
Samples were placed in pre-numbered calico bags and further secured in sample bags with
cable ties. The samples are further secured in a bulk bag and delivered to the ALS -Perth by
contractor Bishops Transport.
A sample reconciliation advice is sent by the ALS-Perth to IGO’s Geological Database
Administrator on receipt of the samples.
Data spacing and distribution
•
•
•
PO Box 661
Nedlands WA 6009
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
•
Any inconsistences between the despatch paperwork and samples received is resolved with
IGO before sample preparation commences.
•
Sample preparation and analysis is completed only at ALS-Perth.
•
The risk of deliberate or accidental loss or contamination of samples is considered very low.
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
JORC CODE, 2012 EDITION: SECTION 1 – KIMBERLEY – SAMPLING TECHNIQUES AND DATA
JORC Criteria
Audits or reviews
PO Box 661
Nedlands WA 6009
Explanation
•
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
No specific external audits or reviews have been undertaken.
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
JORC CODE, 2012 EDITION: SECTION 2 – KIMBERLEY– EXPLORATION RESULTS
JORC
CRITERIA
Mineral
tenement and
land tenure
status
EXPLANATION
•
•
•
Dogleg Prospect is located within WA Exploration Lease E04/1972, covering 157Km2 which is part of the Quick Shears
Project.
The Quick Shears Project consists of 3 granted exploration licences (E04/1972, E04/2314 & E04/2423).
Buxton Resources acquired the Quick Shears Project from New World Cobalt in 2018 (readers are referred to ASX:BUX
announcement on the 6 November 2018 for further information). This transaction was compromised of an initial issue of
1,333,333 fully paid ordinary shares in Buxton Resources, and 3 deferred issues of fully paid ordinary shares (equal to the
$1,000,000) in Buxton Resources, conditional upon satisfaction of milestones as set out below:
■
Within 5 days of Buxton Resources announcing it has intersected in drilling on the Quick Shears Project, on
a grade-thickness basis, >20%m Ni equivalent, providing the grade of the mineralisation intersected is
>1.5% Ni equivalent (e.g., ≥10m @2.0% Ni, or ≥13.33m @ 1.5%Ni). The issue of an additional number of
Buxton Resources shares equal to $250,000.
■
Within 5 days of Buxton Resources announcing it has a JORC compliant resource (inferred, indicated and/or
measured; of any size and/or grade; for any commodity) within the Project Tenements. The issue of an
additional number of Buxton Resources shares equal to $250,000.
■
Within 5 days of Buxton Resources announcing it has a JORC compliant resource that exceeds 15,000
tonnes of contained nickel equivalent within the Project Tenements. The issue of an additional number of
Buxton Resources shares equal to $500,000.
In each case the number of Shares to be issued to New World will be based on the 10-days VWAP prior to the date
on which each relevant milestone is met.
Under this arrangement, Buxton were able to acquire:
■
100% interest in E04/2423; and
■
80% interest in E04/1972 and E04/2314. With Timothy Tatterson holding the remaining (20%) interest.
IGO entered into an agreement with Buxton Resources in relation to the Quick Shears Project (readers are referred to
ASX:BUX announcement on the 2 October 2019 for further information). Under this agreement:
−
IGO manages exploration.
−
Buxton Resources is free carried until completion of a feasibility study and Timothy Tatterson is free carried until a
decision to mine (in respect of his interest in E04/1972 and E04/2314).
−
Buxton Resources is to be paid 3 deferred cash payments of $500,000 each, conditional upon satisfaction of
milestones as set out below (being total deferred payments of up to $1,500,000):
■
the first time IGO or its subsidiaries identifies that it has intersected in drilling on the Project Tenements, on
a grade-thickness basis, ≥20%m Ni equivalent provided the grade of the mineralisation intersected is ≥1.5%
Ni equivalent (e.g., ≥10m @2.0% Ni, or ≥13.33m @ 1.5%Ni). Ni equivalent is to be based on the spot price
for the relevant metals as published by the London Metals Exchange (LME) on the date of the relevant
calculation.
−
•
■
the first time IGO or its subsidiaries identifies a JORC compliant resource (inferred, indicated and/or
measured; of any size and/or grade; for any commodity) within the Project Tenements.
■
the first time IGO or its subsidiaries identifies a JORC compliant resource that exceeds 15,000 tonnes of
contained nickel equivalent within the Project Tenements. Contained nickel equivalent is to be calculated
based on the spot price for the relevant metal as published by the LME on the date of the relevant
calculation.
•
For clarity, the interests in E04/1972 and E04/2314 are held IGO (64%), Buxton Resources (16%), Timothy Tatterson
(20%). The interests in E04/2423 are held IGO (80%) and Buxton Resources (20%).
Exploration
done by other
parties
•
Historical exploration (prior to Buxton Resources involvement) on the Quick Shears tenements was limited to a single phase
of work conducted by Ram Resources Limited (ASX:RMR) during the period 2015- 2016. This comprised a helicopter EM
survey (VTEM), ground EM and three diamond drill holes on E04/1972.
Geology
•
The regional geology setting is a low-grade metamorphic terrane in the Wunaamin-Miliwundi Orogeny of WA.
Mafic to ultramafic intrusions have intruded a metasedimentary package within the belt and are the hosts to the Ni-Cu
mineralisation.
The deposits are analogous to many mafic-ultramafic hosted orthomagmatic Ni-Cu deposits worldwide.
•
•
PO Box 661
Nedlands WA 6009
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
JORC CODE, 2012 EDITION: SECTION 2 – KIMBERLEY– EXPLORATION RESULTS
JORC
CRITERIA
EXPLANATION
•
•
Drill hole
Information
The sulphide mineralisation is interpreted to be related to the intrusive event with mineralisation occurring in several styles
including massive, network texture, and disseminated sulphides. The main sulphide mineral is pyrrhotite (barren), with
lesser amounts of nickel sulphides (pentlandite) and copper sulphides (chalcopyrite).
The region is considered by Buxton and IGO to have the potential to host mafic or ultramafic intrusion related Ni-Cu-Co
deposits based on Buxton’s discovery of the Merlin Prospect.
Hole ID
Easting (m)
Northing (m)
RL (m)
Dip (°)
Azimuth (°)
EOH (m)
23WKDD003
643688
8133781
67
-73
020
373
23WKDD004
643677
8133713
67
-73
020
379
Drill Collar Data (GDA94 MGA Zone 51; RL AHD)
No capping or top-cutting of high grades were undertaken.
The intercepts are calculated on a length weighted basis.
Data
aggregation
methods
•
Relationship
between
mineralisation
widths and
intercept lengths
•
Drilling was undertaken perpendicular to the angle of the interpreted strike and dip of the modelled MHEM and DHEM
conductors. The true thickness is estimated to be 95.6% for 23WKDD003 and 91.0% for 23WKDD004. Downhole thickness
is estimated using the dip and orientation of the drillholes from survey data and measured dip and orientation of the target
geology.
Balanced
Reporting
•
•
The exploration results reported here give the best and most balanced view of the undertaken works from available data.
Assay results from the second drill hole (23WKDD004; BUX ASX announcement 19th October, 2023) are expected in 3-7
weeks, once these results are received, they will be presented to the market.
Other
substantive
exploration data
•
Visual results for the second hole (23WKDD004) have previously been reported in BUX ASX announcement 19th October,
2023.
All meaningful data available has been included.
Diagrams
•
A representative cross section and long section is shown in the main body of this Public Report, this highlights the reported
assay results reported here for 23WKDD003 and the previously reported visual sulphide intersection in 23WKDD004. These
are also shown on a plan map in the main body of the Public Report. DHEM and MLEM conductors are shown as are drill
collar positions.
Further work
•
Lab assay results are expected from 23WKDD004 in 3-7 weeks.
•
After lab results are received from 23WKDD004, a program of works will be defined for 2024 that may include further drill
testing of the Dogleg Prospect in 2024.
PO Box 661
Nedlands WA 6009
•
•
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Share your feedback
Discover