ASX Release Buxton Resources Ltd (ASX:BUX) 12 August 2026
Madman Project: Maiden Drilling Program Completed
• Maiden drilling program at Madman complete — two diamond holes for
1,367.05 m, plus water bore MD001WB
• Both holes, which are separated by ~200 m, intersected a sulphide-bearing
hydrothermal system, comprising extensive disseminated sulphides with
discrete zones of more intense quartz-carbonate stockwork veining,
brecciation and associated sulphide mineralisation — consistent with a large,
structurally controlled mineral system of the style hosting the major Paterson
Orogen Cu-Au deposits
• Downhole electromagnetic surveying (DHEM) of MD002DD has identified a
discrete off-hole conductor, providing a new target for follow-up drilling
• The hydrothermal system is developed from just above the base of the Skates
Hills Formation and intermittently over several hundred metres of the cored
basement sequence.
• Magnetite-bearing basement intersected towards the base of both holes
provides a coherent geological explanation for the ~200 nT, ~1 km² Madman
magnetic anomaly that was the original drill target
• DHEM surveying of MD003DD expected to be completed by the end of
August 2026
• Gold-only assays for the lower portion of MD002DD (below Skates Hills
Formation conglomerate) expected mid-August 2026, full multi-element assay
results for both holes expected by the end of September 2026
• Planning underway for a follow-up drill program to test the off-hole conductor
target, subject to rig availability and any additional heritage clearances arising
from interpretation of the MD003DD DHEM results
• Heritage work program notices submitted for expanded drilling areas, plus
ground EM and gravity surveys
Buxton Managing Director Marty Moloney commented: “The maiden drilling
program at Madman has concluded with multiple intersections of veining, alteration
and mineralisation styles consistent with the major Paterson Orogen copper-gold
deposits. We expect assay results for these holes by the end of September, with
partial gold assays available earlier. Downhole electromagnetics on MD002DD have
identified an off-hole conductor, and we will survey MD003DD by the same method
shortly. In parallel, we are working on plans to return and conduct broader EM and
gravity survey and to drill test these conductors as soon as rig availability and
heritage clearances allow. “
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
View online: https://buxtonresources.com.au/link/yE223e
ASX:BUX
Figure 1: Madman Project summary cross section showing the targeted magnetic anomaly (UBC
inversion (0.03 SI shell), interpreted stratigraphic logs for drillholes MD002DD and MD003DD, along
with the suite of equivalent conductive plate models derived from the downhole EM on MD002DD
(note these are ~350 m north of that drillhole) and a conceptual structural model developed from
preliminary measurements on core. Note the marked thickness variation in the Skates Fm
conglomerate. A preliminary planned drill trace to test the MD002DD DHEM plates is presented
which is provisional on MD003DD DHEM results.
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
View online: https://buxtonresources.com.au/link/yE223e
ASX:BUX
Buxton Resources Ltd (ASX: BUX) is pleased to report the completion of its maiden
diamond drilling program at the 100%-owned Madman Cu-Au Project, located in the
Paterson Orogen of Western Australia.
The program was designed as a first-pass test of a large, discrete magnetic anomaly
interpreted to lie in basement beneath Officer Basin cover sequences — a setting
directly analogous to the major gold-copper discoveries of the Paterson Orogen.
The program comprised two diamond drill holes, MD002DD and MD003DD, for a
combined 1,367.05 m, supported by water bore MD001WB. Both diamond holes
were drilled to completion, cased to end of hole with 50mm PVC, and have been
geologically logged, with samples submitted for multi-element analysis.
Drilling has confirmed the presence of an extensive hydrothermal mineral system in
basement rocks beneath cover, together with magnetite-bearing lithologies at the
base of both holes that account for the target magnetic response.
Significant results include
Hydrothermal system intersected in both holes. Despite a separation of
approximately 200 m, MD002DD and MD003DD each intersected multiple zones of
quartz-carbonate stockwork veining and intense brecciation with associated sulphide
mineralisation, developed from just above the base of the Skates Hills Formation and
within the basement interval of each hole, apparently around the margins of the
magnetite body. The consistency of the system across both holes indicates a
mineralised architecture of substantial scale rather than an isolated or narrow
structure.
Structural complexity consistent with syn-mineralisation deformation. The Skates
Hills Formation conglomerate is over four times thicker in MD003DD than in
MD002DD over only ~200 m of lateral separation. Bedding is essentially flat lying at
the base of this sequence in both holes which is interpreted to reflect syn-
depositional structural thickening. This indicates that the faults that controlled the
thickening of this sequence were structurally active at or around the time of
mineralisation — a characteristic feature of structurally controlled hydrothermal
systems, and a positive indicator for fluid focusing.
Magnetite-bearing basement explains the Madman magnetic anomaly. Magnetite-
bearing gneissic basement was intersected at the base of both holes, providing a
direct geological explanation for the ~200 nT, ~1 km² magnetic anomaly that defined
the drill target. Localised replacement of magnetite by sulphide was observed,
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
View online: https://buxtonresources.com.au/link/yE223e
ASX:BUX
confirming that magnetite-destructive hydrothermal alteration has operated within
the magnetic source rock.
Off-hole conductor mapped by DHEM. Downhole electromagnetic surveying of
MD002DD, has identified a discrete off-hole conductive response located
approximately 350 m north of that drillhole. Approximately half the anomaly
wavelength was recorded before logging reached the end of hole. A suite of
equivalent conductive plate models has been derived, any one of which could
account for the observed response; the models are alternative solutions to the same
anomaly rather than separate conductive bodies. Modelled plate size and
conductance are inversely related, with smaller plates requiring higher conductance
to fit the data — modelled conductance ranges from 200 to 1,000 Siemens and 500
x 500 m to 1000 x 1000 m areal size across the solution set. Plate orientation is
consistently resolved across all models, striking northwest and dipping 60–80° to the
southwest, and is interpreted to reflect a structural control on the conductive body.
The conductor lies outside the sections drilled by both holes and is untested.
Figure 2: Plan view of the drill holes, which are offset by around 200 m, with the magnetic model and
the suite of EM plate models.
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
View online: https://buxtonresources.com.au/link/yE223e
ASX:BUX
These results establish Madman as a large, structurally controlled hydrothermal
system hosted in basement beneath Officer Basin cover, with a demonstrated
magnetite-bearing source for the target magnetic anomaly and sulphide
mineralisation developed over several hundred metres of drilled section in both
holes. This mineralisation is apparently focused on the margin of the magnetite
body, which may represent a previously uplifted basement block.
Buxton considers the off-hole conductor identified by DHEM to be the highest-
priority targets for the next phase of drilling. Completion of DHEM surveying on
MD003DD, expected by the end of August 2026, is anticipated to refine the
conductor geometry and support final collar selection.
Planning for a follow-up program will then be finalised, with timing subject to drill rig
availability and completion of heritage clearance requirements under the Company's
Land Access Agreement with the Native Title Holders. New heritage work program
requests are currently under review with a view to scheduling clearance programs
that include scope for additional areas for drilling, plus ground EM and gravity
surveys.
Gold-only assays for the lower portion of MD002DD (below the Skates Hills
Formation conglomerate) are expected by mid-August 2026. Full multi-element
assay results for the basement sections of both holes are expected by the end of
September 2026 and will be reported when received and validated.
---o0o---
This announcement is authorised by the Board of Buxton Resources Ltd. For further
information, please contact:
Martin Moloney
Managing Director
marty@buxtonresources.com.au
Sam Wright
Company Secretary
sam@buxtonresources.com.au
Table 1: Madman Project drill hole collar details.
Hole ID North (m) East (m) RL (m) Dip Azi Depth (m) Type
MD001WB 518,566 7,283,238 421.5 -90 360 34.6 Rotary Mud
MD002DD 518,561 7,283,220 421.7 -81.2 231.1 635.76 Rotary Mud / Diamond
MD003DD 518,614 7,283,434 423.2 -68.5 228.8 731.29 Rotary Mud / Diamond
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
View online: https://buxtonresources.com.au/link/yE223e
ASX:BUX
Table 2: Lithology with preliminary assignment to Officer Basin stratigraphic units. Note the marked
thickness variation in the Skates Fm conglomerate between the two holes.
HoleID From To Interval Lithology Strat. Unit
MD002DD 0.00 4.60 4.60 red dune loose sands Quaternary sands
MD002DD 4.60 16.60 12.00 brown sands and silts Cretaceous
Samuel Fm
MD002DD 16.60 46.60 30.00 claystone, siltstone and sandstone Permian Paterson
Fm
MD002DD 46.60 82.60 36.00 poor sample quality - claystones
MD002DD 82.60 228.00 145.40 red mudstones,
dolomitic/carbonates and
stromatolites, carbonates and
siltstones
Boondawari Fm
(Disappointment
Group)
MD002DD 228.00 333.60 105.60 medium-coarse well sorted
sandstone
Mundadjini /
Skates Fm
Sunbeam Group
MD002DD 333.60 393.00 59.40 Stromatolitic carbonates, dolomite
and argillaceous muds and silts -
start of vertical fracture and some
calcite veining, lesser sandstones
MD002DD 393.00 455.00 62.00 lower member, silts and mudstones,
heavily gypsum veined (bedding
parallel and subvertical)
MD002DD 455.00 488.50 33.50 Conglomerate, brecciated at the base
- cemented by iron oxides and minor
qtz veinlets
Skates Fm -
conglomerate
member
MD002DD 488.50 533.90 45.40 Sericite altered metasediments, alkali
phyric meta felsic volcanics,
hydrothermal breccias.
Basement
Volcanics
MD002DD 533.90 635.76
eoh
101.86 magnetite layers replaced by sulphide
and ferroan dolomite on fault
structures, transitions to meta mafic
with extensional qtz-cb veinlets,
magnetite and sulphides replacing
bedding and preferentially forming
around flat lying fold hinges
Basement meta-
BIF & chloritic
metasediments
MD003DD 0.00 4.60 4.60 loose dune sand with minor laterite
(red/brown)
Quaternary
MD003DD 4.60 28.60 24.00 fine sand stone + siltstone
(Yellow/white)
Cretaceous -
Samuel Fm
MD003DD 28.60 64.60 36.00 claystone, siltonstone, minor
sandstone (yellow/white)
Permian -
Paterson Fm
MD003DD 64.60 118.60 54.00 siltstone and carbonates
MD003DD 118.60 238.60 120.00 mudstone, carbonates and
siltstones, (red)
Boondawari Fm
MD003DD 238.60 325.50 86.90 medium well sorted sandstone Mundadjini /
Skates Fm
Sunbeam Group
MD003DD 325.50 405.10 79.60 stromatolitic carbonates, dolomite
and mudstone
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
View online: https://buxtonresources.com.au/link/yE223e
ASX:BUX
HoleID From To Interval Lithology Strat. Unit
MD003DD 405.10 466.25 61.15 mudstone and siltstone with gypsum
veins
MD003DD 466.25 614.00 147.75 Iron oxide cemented quartzite
conglomerate, becoming heavily
veined at the base
Skates Fm -
conglomerate
member
MD003DD 614.00 642.00 28.00 Gneissic meta seds Basement meta-
BIF & chloritic
metasediments
MD003DD 642.00 664.00 22.00 Metamorphosed banded iron
formation (altered)
MD003DD 664.00 706.00 42.00 Gnessic meta mafic + seds
MD003DD 706.00 731.29
eoh
25.30 Metamorphosed banded iron
formation (generally unaltered)
Figure 3: Wet core photography, MD003DD 627.29–662.72 m (trays 77–84, NQ3 core, 45.0 mm
diameter). The interval contains two zones of intense quartz-carbonate stockwork veining and
brecciation — 627–636 m, most intense at 630–631 m, and 645–663 m, where vein intensity increases
progressively downhole and remains elevated at the base of the imaged interval. These are separated
by a finely laminated unit at 636–645 m of lower vein abundance which nonetheless hosts localised
massive pyrite, indicating that sulphide distribution is not controlled by vein intensity alone.
Disseminated and fracture-controlled pyrite with trace chalcopyrite occurs throughout the interval,
averaging approximately 0.5% total sulphide abundance excluding the discrete massive sulphide
zones. Assay results are expected by the end of September 2026.
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
View online: https://buxtonresources.com.au/link/yE223e
ASX:BUX
Figure 4: Selected alteration textures, altered basement sequence (gneissic metasediment and
metamorphosed banded iron formation), MD003DD (627.29–662.72 m NQ3 core, 45.0 mm diameter),
illustrating quartz-carbonate vein breccia, cm-scale veins of massive pyrite>>chalcopyrite, silica-
carbonate and hematite alteration, folded and transposed banding, and cross-cutting carbonate,
quartz-carbonate and quartz veining. Images are selected to illustrate complex textural variability and
are not representative of the interval; assays are pending and no mineralisation is implied. Per figure
3, the entire interval 627.29–662.72 m has disseminated and fracture-controlled pyrite and traces of
chalcopyrite averaging 0.5% total sulphide abundance.
Cautionary Statement: Visual estimates of mineral abundance should never be considered a proxy or
substitute for laboratory analyses where concentrations or grades are the factor of principal economic
interest. Visual estimates also potentially provide no information regarding impurities or deleterious
physical properties relevant to valuations. Visual estimates of vein abundance and sulphide content
reported in this announcement were made from photographs of wet core surfaces, have not been
verified by laboratory analysis, and should not be relied upon. Assay results are expected during
September 2026 and will be reported when received and validated.
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
View online: https://buxtonresources.com.au/link/yE223e
ASX:BUX
Previously Reported Information – Madman
There is information in this announcement relating to exploration results previously
announced on:
- 01 Jul 2026 Madman Project - Drilling Program Commenced
- 16 Jul 2026 Madman Project - Drilling Update
Validity of Referenced Results
Buxton advises that the identification of magnetite-bearing basement below 533.90 m in
MD002DD post-dates the Company's announcement of 16 July 2026, which correctly
reported pyrrhotite as the only magnetic mineral species identified in the intervals then
drilled. Both mineral species are now recognised within the system, with magnetite likely
driving the major component of the anomaly.
Buxton confirms that it is otherwise not aware of any new information or data that materially
affects the information from previous ASX Announcements which has been referenced in this
Announcement.
About the Madman Project
The Madman Project is focussed on a Havieron “look-a-like” ~200nT magnetic feature ~1
km2
in extent (Figure 4).
Figure 5: GSWA statewide magnetic imagery comparing the Madman geophysical anomaly to the
Havieron magnetic feature. Madman lies under shallow cover and close to the Marloo Fault – a major
crustal boundary.
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
View online: https://buxtonresources.com.au/link/yE223e
ASX:BUX
Madman is located 375 km northeast of Wiluna and is accessible via the Gunbarrel and Eagle
Highways, then along a historic seismic line track in good condition. Buxton have improved
the last ~6 km of this seismic line, then established 56 km of new access tracks.
Figure 6: Regional setting of the Madman Project showing the key supporting geological elements
including the Marloo Fault and extensions and the nearby gold-bearing mineral occurrences at
Quadrio Lake and in the GSWA Trainor 1 stratigraphic drillhole. The extent of the Paterson Orogen
and related major mineral deposits is also shown.
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
View online: https://buxtonresources.com.au/link/yE223e
ASX:BUX
JORC Table: Section 1 – Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling techniques Nature and quality of sampling (eg cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down-hole gamma sondes, or
handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
Diamond drilling was used to obtain continuous HQ3 and
NQ3 core through the basement sequence, sawn in half
along its long axis for sampling. No assay results and no
mineralisation are reported in this Announcement;
accordingly, no aspect of the determination of
mineralisation is currently Material.
Diamond core provides a continuous, undisturbed
sample of the drilled interval and is considered
representative of the in-situ material at the scale of the
intervals reported. Core recovery has been recorded per
run (see Drill sample recovery) and is high across the
intervals logged, supporting sample representivity.
Sampling for laboratory analysis has been undertaken on
nominal 1.0 m half-core intervals, reduced where
geological variability warranted, with the sampling
interval selected to reflect observed lithological and
alteration boundaries rather than at fixed spacing alone.
Quarter-core field duplicates have been collected.
Certified reference materials and blanks have been
inserted into the sample stream at industry-standard
frequency. QAQC performance will be reported when
results are received and validated.
Mud rotary sampling of the cover sequence is not
representative of the in-situ material (see Drill sample
recovery) and no results from that interval are relied
upon in this Announcement.
Downhole electromagnetic surveying of MD002DD
augmented by limited surface (fixed-loop)
electromagnetic surveying, have been completed,
acquired by GEM Geophysics with modelling by Southern
Geoscience Consultants. Survey details are:
- Loop Sizes: 700m x 700m
- Downhole Station Spacing: 10m / 5m / 2m
Intervals
- Surface Station Spacing: 100m
- Sensor: EMIT DigiAtlantis (downhole) / Jessy
Deep High-Temperature SQUID (HTS) B-field
sensor.
- Tx Current: 58 >> 75 Amps
- Tx Frequency: 0.5Hz
The presence of HWT casing over 400–450 m in
MD003DD (see Drilling Techniques section below) has
been assessed and is not expected to materially affect
the interpretation of downhole electromagnetic data
from that hole.
Electromagnetic plate modelling is non-unique. The suite
of plate models presented represents a range of
geometries and conductances, each of which
independently satisfies the observed downhole and
surface EM response; the models are not interpreted as
separate conductive bodies. Plate size and conductance
trade off against one another, such that smaller
modelled plates require correspondingly higher
conductance. Plate orientation is the best-constrained
parameter across the solution set. Modelled
conductance values should not be interpreted as
measurements of the conductivity of any physical body,
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report. In cases where ‘industry
standard’ work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases,
more explanation may be required, such as where there is
coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of detailed
information.
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
View online: https://buxtonresources.com.au/link/yE223e
ASX:BUX
and no inference as to the presence, size, tenor or
continuity of sulphide mineralisation should be drawn
from them.
Calibration of measurement tools: magnetic
susceptibility measurements were acquired with a
Terraplus KT-10 v2 instrument, checked against the
manufacturer's calibration standard at the start and end
of each logging session. Portable XRF measurements
were acquired with Olympus Vanta and Thermo Niton
XLT3+ GOLDD instruments, each subject to the
manufacturer's internal energy calibration on start-up
and verified against certified reference materials at the
start and end of each session. pXRF results are used for
lithological and pathfinder discrimination only and are
not reported as assay-grade data. Core orientation was
undertaken with a Reflex ACTx tool; orientation
confidence was recorded per run and orientation marks
were rejected where confidence criteria were not met.
Visual estimates: estimates of vein abundance and
sulphide content reported in this Announcement are
semi-quantitative visual observations, made in part from
photographs of wet core surfaces rather than from
measurement of the physical core. They have not been
verified by laboratory analysis, point counting or image
analysis, and should not be regarded as representative
measurements of mineral abundance. Refer to the
Cautionary Statement in the body of this
Announcement.
Drilling techniques Drill type (e.g., core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (e.g. core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit or other type, whether
core is oriented and if so, by what method, etc).
MD002DD and MD003DD were drilled by McKay Drilling
Pty Ltd using a truck-mounted diamond rig (MKY023)
operating 12-hour day and night shifts, with a
combination of mud rotary / rock-roller (PCD) pre-collar
and HQ3 and NQ3 diamond coring. Method selection
was driven by ground conditions.
MD002DD: rotary/PCD 0–149.9 m; HQ3 coring 149.9 m –
333.6 m; rotary/PCD through abrasive sandstone; HQ3
coring 333.6–561.1 m; NQ3 coring 561.1–635.76 m.
MD003DD: rotary/PCD 0–325.5 m; HQ3 coring 325.5–
450.0 m; NQ3 coring 450.0–731.29 m.
MD001WB was drilled by mud rotary to 34.6 m as a
water supply bore and was not cored.
All HQ3 and NQ3 core runs were oriented using a Reflex
ACTx tool. Core diameters are HQ3 61.1 mm and NQ3
45.0 mm.
Approximately 50 m of HWT casing was lost in hole in
MD003DD over the interval 400–450 m during
completion of the hole. The casing remains in the hole.
The 50 mm PVC casing was subsequently run inside the
HWT to end of hole, and the hole is accessible for
downhole geophysical surveying. No core loss is
attributed to this event.
Drill sample recovery Method of recording and assessing core and chip sample
recoveries and results assessed.
Mud Rotary Method: Sampling was undertaken using a
10-litre bucket in-line with the borehole fluid return
channel between the drillhole and sump. One sample
was collected per 6 metre drill rod. Mud Rotary sample
recovery and sample quality is considered extremely
poor with generally only 0.5-1kg of sample collected
which represents ~1% recovery, and all samples having
apparent contamination from up-hole sediments, and
steel flakes from the drill string (a result of the 80 degree
dip drilling angle). Since the focus was on the pre-Officer
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
View online: https://buxtonresources.com.au/link/yE223e
ASX:BUX
Basin “basement” rocks, a high sample quality for the
mud-rotary section was not an objective of the program.
Mud rotary sample recoveries are estimated by
calculating the drilled borehole volume, converted to
weight using a nominal density of 2.6 g/cc and then
comparing that value with weight of each sample. These
“bulk” samples were initially stored in green bio-
degradable bags and were then sub-sampled (un-sieved)
using a spoon into chip trays for visual logging, pXRF
analysis and future reference.
Diamond Drilling: Diamond core recovery is recorded
per run during mark-up by qualified geologists, typically
within 24 hours of drilling, allowing quality checks on the
drillers' core block marking.
Recovery over the intervals logged to date is:
MD002DD: 319.34 m recovered from 320.70 m cored
(99.6%) over the interval 149.9–530.6 m
MD003DD: 245.34 m recovered from 246.67 m cored
(99.5%) over the interval 325.5–572.7 m
Recovery logging for the remaining cored intervals —
530.6 m to end of hole in MD002DD and 572.7 m to end
of hole in MD003DD, totalling 263.7 m — is in progress.
Core recovery over these intervals is estimated at
approximately 100% based on driller's core block
records, which indicate full recovery across all runs
inspected to date. On that basis, indicative recovery for
the full cored length of each hole is approximately
99.7%. These estimates will be confirmed once recovery
logging is complete.
Total core loss recorded across logged intervals is 2.69
m, with the largest single loss being 0.70 m over the run
494.7–497.7 m in MD003DD.
A relationship between sample recovery and grade has
not been established.
Logging Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
Geological logging is qualitative to semi-quantitative,
comprising lithology, alteration, veining, mineralogy and
estimated sulphide abundance recorded digitally.
Quantitative measurements comprise magnetic
susceptibility (Terraplus KT-10 v2), specific gravity and
portable XRF. All core trays and chip trays have been
photographed wet and dry at the Project sample facility
and at Buxton's storage facility in Belmont, Perth.
All cored intervals in MD002DD (425.9 m) and MD003DD
(405.3 m) have been geologically logged in full — 100%
of cored length. Geotechnical logging, including recovery
and RQD, is complete over 320.7 m of MD002DD and
246.7 m of MD003DD, representing approximately 68%
of total cored length, with the balance in progress. Mud
rotary cover intervals were logged from chip trays at
nominal 6 m intervals.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
The total length and percentage of the relevant
intersections logged.
Sub-sampling
techniques and
sample preparation
If core, whether cut or sawn and whether quarter, half or
all core taken.
Core was sawn in half along its long axis using a diamond
blade rock saw. Half-core was submitted for analysis,
with quarter-core taken for field duplicates. Remaining
half-core is retained.
Mud rotary cover-sequence samples were collected wet
from the fluid return line and sub-sampled un-sieved
with a spoon into chip trays for visual logging and pXRF.
If non-core, whether riffled, tube sampled, rotary split,
etc and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
PO Box 661
Nedlands WA 6009
15 Robinson Av
Belmont WA 6104
T: 08-9380 6063
E: info@buxtonresources.com.au
W: www.buxtonresources.com.au
View online: https://buxtonresources.com.au/link/yE223e
ASX:BUX
Measures taken to ensure that the sampling is
representative of the in-situ material collected, including
for instance results for field duplicate/second-half
sampling.
These samples are not considered representative and no
results from them are reported.
Sample preparation is being undertaken at a certified
commercial laboratory using industry-standard
procedures for diamond core. Preparation details will be
reported with assay results.
Quarter-core field duplicates, certified reference
materials and blanks have been inserted into the sample