Graphite Bull Project Heritage Clearances Received
Released
Released
Announcement PDF
ASX Release
29th April 2024
Graphite Bull Project - Heritage Clearances Pave the Way
for Major Resource Upgrade Drilling Program
Buxton Resources Ltd (‘Buxton’; ASX:BUX) is pleased to announce that clearances
have been received from recent Aboriginal Heritage surveying at Buxton’s 100%
owned Graphite Bull Project, allowing for recommencement of drilling in Q2 CY24.
The 2014 Inferred Resource of 4 Mt @ 16.2% TGC is defined over a strike length of
~460 metres and to a depth of ~220 metres (Figure 1). The new clearances allow:
•
•
•
Infill drilling along 2.1 km of prospective strike where scout drilling has
confirmed the presence of high-grade graphite mineralisation;
Testing depth extensions as defined by ground EM surveys (Figure 2); and
Following-up new hanging wall zones as encountered in GB001RC (33m @
18.7% TGC) during the 2023 scout RC drilling program.
Figure 1: 2024 Heritage Clearance Surveys have been completed over a 1.5 km2 area. Initial clearance works are
concentrating in the area to the South and East of the existing Resource to provide surface access for extensional
resource drilling where the 2023 scout exploration program returned outstanding grades and thicknesses of
graphite mineralisation.
PO Box 661
Nedlands WA 6009
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Additional follow-up heritage surveys are planned for later this year to support future
work through 2025 and beyond.
Buxton’s CEO Marty Moloney said; “This is a fantastic outcome which provides
clearances to support a resource upgrade and pre-feasibility study. We are looking
forward to seeing rigs turning again at Graphite Bull. I'd like also to gratefully
acknowledge the Burringurrah heritage custodians who undertook this work."
Figure 2: Graphite Bull Project long section showing the 2014 resource in relation to the extent of ground EM
plates and the location of 2023 scout RC drillholes, all of which intersected graphite mineralisation.
---ooo--This announcement is authorised by the Board of Buxton Resources Ltd.
For further information, please contact:
Martin Moloney
Chief Executive Officer
marty@buxtonresources.com.au
PO Box 661
Nedlands WA 6009
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
Sam Wright
Company Secretary
sam@buxtonresources.com.au
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Previously Reported Information
There is information in this announcement relating to exploration results previously announced on:
1.
2.
3.
4.
24th October 2014 – Buxton significantly expands Graphite Resource At Yalbra
7th February 2023 – Graphite Bull Exploration Update (Ground EM results)
19th April 2023 – Graphite Bull Drilling Assays
23rd October 2023 - Outstanding shallow conductors identified at Graphite Bull
Validity of Referenced Results
Buxton confirms that it is not aware of any new information or data that materially affects the
information from previous ASX announcements which has been referenced in this announcement.
About the Graphite Bull Project
The at-surface, high-grade Graphite Bull (formerly Yalbra) Project is in the Tier 1 jurisdiction of
Western Australia, Gascoyne region, on granted Exploration License E09/1985. Graphite Bull was
acquired by Buxton in 2012; by 2014 an airborne EM survey, several drilling programs and two
resource estimates were completed. The Graphite Bull project currently has a JORC (2012) compliant
Inferred Resource of 4 Mt @ 16.2 % TGC (ASX 24/10/2014).
Due to projected growth of the global Lithium-ion battery market, and the essential part graphite will
play in that – graphite is the single largest component of Li-ion batteries – Buxton recommenced work
at Graphite Bull in 2022. Work since then has been focused on metallurgical test work through to final
product (Activated Anode Material), and increasing Resource confidence and size, with very promising
results to date.
Forecast battery-related demand (Benchmark Mineral Intelligence) means that by 2027, global
graphite production needs to double and that, by 2040, eight times current production will be
required to supply the world’s lithium-ion battery anode market. Non-China battery anode capacity,
and investment, is being spurred by US IRA legislation. Graphite Bull is therefore a very attractive
project, being a high-grade deposit located in a Tier 1, US FTA mining jurisdiction, with excellent
electrochemical performance and outstanding Resource growth potential.
PO Box 661
Nedlands WA 6009
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Figure 3: Location of Buxton’s Graphite Bull Project, 750km north of Perth.
Cautionary Note Regarding Forward-Looking Information
This Announcement contains forward-looking statements and forward-looking information within the
meaning of applicable Australian securities laws, which are based on expectations, estimates and
projections as of the date of publication. This forward-looking information includes, or may be based
upon, without limitation, estimates, forecasts and statements as to management’s expectations with
respect to, among other things, the timing required to execute the Company’s programs, and the
length of time required to obtain permits, certifications and approvals.
Wherever possible, words such as “anticipate”, “believe”, “expect”, “intend”, "should", "intend",
“may” and similar expressions have been used to identify such forward-looking information. Forwardlooking information is based on the opinions and estimates of management at the date the
information is given, and on information available to management at such time. Forward-looking
information involves significant risks, uncertainties, assumptions, and other factors that could cause
actual results, performance or achievements to differ materially from the results discussed or implied
in the forward-looking information. These factors, including, but not limited to, fluctuations in
currency markets, fluctuations in commodity prices, the ability of the Company to access sufficient
capital on favourable terms or at all, changes in national and local government legislation, taxation,
controls, regulations, political or economic developments in Australia or other countries in which the
Company does business or may carry on business in the future, operational or technical difficulties in
PO Box 661
Nedlands WA 6009
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
connection with exploration or development activities, employee relations, the speculative nature of
mineral exploration and development, obtaining necessary licenses and permits, contests over title
to properties, especially title to undeveloped properties, the inherent risks involved in the exploration
and development of mineral properties, the uncertainties involved in interpreting drill results and
other geological data, environmental hazards, industrial accidents, limitations of insurance coverage
and the possibility of project cost overruns or unanticipated costs and expenses, and should be
considered carefully.
Many of these uncertainties and contingencies can affect the Company’s actual results and could
cause actual results to differ materially from those expressed or implied in any forward-looking
statements made by, or on behalf of, the Company. Prospective investors should not place undue
reliance on any forward-looking information. Although the forward-looking information contained on
in this Announcement is based upon what management believes, or believed at the time, to be
reasonable assumptions, the Company cannot assure prospective purchasers that actual results will
be consistent with such forward-looking information, as there may be other factors that cause results
not to be as anticipated, estimated or intended, and neither the Company nor any other person
assumes responsibility for the accuracy and completeness of any such forward-looking information.
The Company does not undertake, and assumes no obligation, to update or revise any such forwardlooking statements or forward-looking information contained herein to reflect new events or
circumstances, except as may be required by law. No stock exchange, regulation services provider,
securities commission or other regulatory authority has approved or disapproved the information
contained in this Announcement.
PO Box 661
Nedlands WA 6009
Suite 1, First Floor
14-16 Rowland Street
Subiaco WA 6008
T. 08-9380 6063
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Share your feedback
Discover