QUARTERLY ACTIVITIES REPORT
for the period ending 30 June 2024
Graphite Bull Project (100% BUX)
•
Heritage survey provides clearances for extensive drilling activities, which
have commenced subsequent to the quarter
Copper Wolf Project; Arizona USA (100% BUX, IGO option to earn 70%)
•
•
Magnetic surveys enhance prospectivity at Wolverine
Received permits to drill and two miscellaneous licenses to support a drill
program in the following months
Narryer Project (100% BUX)
•
High conductance EM plates in reconnaissance survey at Oculus,
establishing confidence for the forthcoming drill program
Centurion Project (100% BUX)
•
•
Native title engagement and planning for heritage surveys in H2
Miscellaneous license applications lodged to secure legal access rights in
preparation for drilling later in the year
Matrix Project, Arizona USA (BUX earning 100%)
•
Project acquisition and commencement of the drone survey subsequent to
the quarter
Corporate
•
•
•
Institutional Share Placement raises $2.5m
Cash balance (30 June 2024) of approximately $2.9 million
SPP & IGO Top-Up in July raises a further $370k (not included in this
quarterly’s 5B), taking the pro forma cash balance to c. $3.2 million
PO Box 661
15 Robinson St
T. 08-9380 6063
Nedlands WA 6009
Belmont WA 6104
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Buxton Resources Limited (ASX: BUX or “Buxton”) is pleased to release the Quarterly
activities report and Appendix 5B for the period ended 30 June 2024 (the Quarter).
Graphite Bull Project (BUX 100%)
The Graphite Bull Project (Exploration License E09/1985) is located 280 km East of
Carnarvon in the Murchison Region of Western Australia. In 2014, Buxton released
an updated, JORC 2012 compliant, Mineral Resource Estimate for the main zone of
graphite mineralisation. The Inferred Mineral Resource is 4.0Mt @ 16.2% TGC, using
a 4% TGC cut-off (see ASX announcement 24th October 2014).
During the Quarter, Buxton completed a heritage survey. Extensive clearances from
this survey provide a basis for extensive Resource growth (see ASX announcement
29th April 2024). Buxton also continued the preparation of a ~200 kg bulk
concentrate sample at ALS Metallurgy which will allow the commencement of thirdparty qualification work.
Copper Wolf Project (BUX 100% / IGO option to earn 70%)
Buxton’s Copper Wolf Project consists of Lode Mining Claims and Mineral
Exploration Permits in Yavapai County, Arizona. The Copper Wolf Project has
multiple historical resource estimates available that confirm the presence of a large
Laramide porphyry Cu-Mo system (see ASX Announcement 25 October 2021).
Porphyry Cu-Mo mineralisation at Copper Wolf is largely concealed by a post-mineral
(Tertiary) sequence of volcanic and sedimentary rocks. The Project is located within
one of the most prolifically endowed copper belts in the world, yet it has not seen
any drilling since the early 1990s. Buxton’s 2022 airborne magnetic survey was the
first geophysical work undertaken since the early 1960s. Historic exploration has
consisted of relatively wide spaced drilling which focussed on significant supergene
copper mineralisation. Buxton is targeting high grade, underground bulk mineable
copper-molybdenum mineralisation.
On the 4th October August 2022, Buxton received shareholder approval for Buxton
and IGO to enter into an earn-in and joint venture agreement for the Copper Wolf
Project (Arizona, USA).
PO Box 661
15 Robinson St
T. 08-9380 6063
Nedlands WA 6009
Belmont WA 6104
E. info@buxtonresources.com.au
www.buxtonresources.com.au
During the Quarter Buxton received permits to drill and reported results from a
drone magnetic survey which enhanced Cu-Mo porphyry prospectivity at the
Wolverine Prospect (see ASX Announcement 1st May 2024). Buxton also continued
preparations for the re-commencement of drilling activities on the BUX/IGO Joint
Venture ground.
During the Quarter, two miscellaneous licenses (L09/102
groundwater search and L09/103 access, infrastructure) were granted after
objections were lifted.
Narryer Project (BUX 100%)
The Narryer Project is targeting magmatic Ni-Cu-PGE sulphide mineralisation along
the Yilgarn Craton margin within the Murchison Region of WA. Buxton has
completed substantive systematic exploration programs since 2021, including
regional gravity / airborne EM programs and two rounds ground EM which have
defined high conductance drill targets at the Ranger and Oculus Prospects, and a
low conductance target at the Bandito prospect.
During the Quarter Buxton completed a high-power Moving Loop Electromagnetic
(MLEM) survey which defined several new high conductance EM plates (up to 10,000
Siemens) at the Oculus prospect (see ASX 22nd May 2024). Follow-up EM surveys
and RC drilling are planned for H2 2024. During the Quarter, Buxton undertook
voluntary reductions to the exploration license tenure – the Project now covers 147
blocks, or approximately 450 km2 resulting in a reduction in exploration
commitments from $624,000 to $147,000.
West Kimberley Project (BUX / IGO JV)
The West Kimberley Project is targeting Nova-style magmatic Ni-Cu sulphide
mineralisation in Proterozoic belts of the West Kimberley Region of Western
Australia. Buxton have Farm-In and JV agreements over three separate Project areas
(Merlin Project, Quickshears Project and West Kimberley Regional Project) which fall
within the overall West Kimberly Project.
During the previous field season, IGO intersected massive sulphides in the maiden
drillhole at the Dogleg prospect (ASX 4th Oct 2023). A second hole intersected semimassive sulphides (ASX 19th Oct 2023). Assays received for the first Dogleg hole
contained 13.85m (true width 13.24m) at 4.35% Ni, 0.34% Cu, 0.15% Co from
PO Box 661
15 Robinson St
T. 08-9380 6063
Nedlands WA 6009
Belmont WA 6104
E. info@buxtonresources.com.au
www.buxtonresources.com.au
177.34m, including: 5.86m (true width 5.60m) at 7.47% Ni, 0.31% Cu, 0.25% Co from
179.08m (ASX 6th Nov 2023).
Buxton subsequently announced assay results for the second hole 23WKDD004
returned 2.89 m (True Width 2.63 m) at 4.17% Ni, 0.83% Cu, 0.14% Co from 233.63
m (see ASX 1st Feb 2024). These extremely high tenor results lie outside the initial
ground moving loop EM plate / drill target.
JV partner IGO Ltd has indicated that they intend to undertake a significant drilling
program in the 2024 field season (Q3-Q4) at Dogleg to follow-up this outstanding
nickel sulphide discovery. Buxton will provide further updates on this project in the
coming Quarters.
Fraser Range Project (BUX 10% / IGO 90%)
Exploration in the Fraser Range Project is targeting magmatic Ni-Cu sulphide
mineralisation along strike from IGO’s operating Nova mining operation. Buxton
remain free carried until completion of a feasibility study with Buxton retaining an
exclusive right to explore and develop iron ore on the Tenements. During the
Quarter, IGO reported having commenced a strategic review of all Fraser Range JV
Project tenure. Buxton retains 100% interest in the iron-ore rights for the two Fraser
Range BUX/IGO JV tenements.
During the Quarter, Buxton commenced an internal review of the Zanthus Magnetite
project, located on E28/1959, just 35km from the Zanthus rail siding on the TransAustralia Rail Line.
Previously, Buxton has undertaken geophysical and drilling programs, with the most
recent being completed in 2011 (ASX 12th September 2011). Buxton then declared
and Exploration Target (ASX 2nd November 2011) followed by a pre-JORC 2012
Inferred Resource (ASX 5th December 2011). DTR met work indicates that a >67%
mFe con could be produced at grind sizes of 150-106 micron with DTR potentially
over 30% (ASX 7th December 2011).
PO Box 661
15 Robinson St
T. 08-9380 6063
Nedlands WA 6009
Belmont WA 6104
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Centurion Project (BUX 100%)
The Centurion Project consists of a single EL covering ~80 km2 located in the Great
Sandy Desert between Kiwirrkurra and Balgo. The EL covers a prominent dipolar and
offset magnetic and gravity anomaly pattern which is characteristic of Iron Oxide
Copper Gold (IOCG) deposits such as Olympic Dam and Prominent Hill.
The principal target is defined by magnetic & gravity anomaly 3,500 m by 5,000 m in
extent and 1500 nanoTesla magnetic and 10.1 milligal gravity in amplitude.
Although little is known of the pre-Canning geology, the Centurion Project is situated
in an excellent regional structural setting. Magnetic data indicates that the target is
located between 520 - 700 metres beneath ground level under post mineral cover
sequences of the Canning Basin.
A previous drillhole by CRA in 1993 encountered drilling difficulties and was
terminated at 432.30 m and failed to reach basement. The geological logs noted
chlorite-pyrite altered clasts in a boulder conglomerate assigned to the Permian
Grant Formation toward the end of the hole. This observation provides strong
encouragement that the geophysical response may be related to a hydrothermal
system, and that the basement interface may not be far below the base of that hole.
Buxton has entered in Heritage Protection Agreements with the Ngurra Kayanta and
Parna Ngururrpa Aboriginal Corporations. Provision for Buxton personnel and
contractors to pass through lands of the Kiwirrkurra People is provided by a third
access agreement. Buxton has also received permits from the Aboriginal Lands Trust
to complete statutory requirements to access the Project.
During the Quarter, Buxton undertook stakeholder engagement and planning
activities for heritage survey to allow for the commencement of drilling activities.
Buxton also received an Exploration Incentive Scheme grant for up to $220,000 to
offset the cost of this drilling program (ASX 23rd May 2023). Subsequent to the
Quarter, Buxton announced that it had commenced heritage surveys.
During the Quarter, Buxton lodged two miscellaneous licenses (L80/116 & L80/117)
to secure legal access rights between the EL and the Balgo- Kiwirrkurra Track.
PO Box 661
15 Robinson St
T. 08-9380 6063
Nedlands WA 6009
Belmont WA 6104
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Matrix Project (BUX earning 100%)
During the Quarter, Buxton announced that it had entered into a binding Earn-In
Agreement to acquire 100% of the Matrix Manganese Project ("Matrix") located in
Mohave County, Arizona, from Solution Mining Pty Ltd ("Solution") (ASX 14th May
2024).
The Matrix Project consists of 154 Lode Mining Claims (MTX 001 - MTX 154) covering
~12 km2 in Mohave County, Arizona. The Matrix Project claims cover the interpreted
western extension of the Artillery Peak manganese mineralisation.
The material terms of the Agreement are as follows:
1. Buxton will Earn-In to 100% ownership of 154 BLM Lode Mining Claims by
spending AU$1.0M over a maximum of 2 years.
2. Buxton will issue Solution AU$150k equivalent in shares within 20 days after
the agreement is executed (priced at the 20-day VWAP), and a 1.5% NSR
royalty.
3. Buxton retains a right of first refusal over this royalty.
4. Buxton will issue Solution a second tranche of AU$100k in shares at the 2 years
anniversary, or on completing the Earn-In, whichever comes earliest.
5. Mandatory commitments are limited to the claim maintenance fees (currently
US$25,410), which are to be paid on Jan 1 each year.
6. Should BUX subsequently either;
a. IPO the project: Solution will get 10% of the new entity's capital
structure, plus priority right to subscribe to an additional 9.9% on the
same terms as for other investors of that IPO; or
b. Progress the project: Solution to get milestone payments payable, at
BUX's discretion in BUX shares or cash, as follows; 3% (of fair market
value of the project) at Resource, 2% at Feasibility Study and 1% at
Decision to Mine
Manganese was first discovered in the region around 1880. The deposits at the
Artillery Peak occur as two distinct types of deposit, stratiform manganese deposits
and vein manganese deposits. In 2011 American Manganese Inc. (now Recyclico
AMY.V) defined Indicated & Inferred Resources of 277 Mt @ 2.8% Mn. A Tetra Tech
study in 2012 focused on a smaller area with Indicated and Inferred Resources of 82
Mt @ 2.3% Mn (with 198 Mt remaining current outside this area).
PO Box 661
15 Robinson St
T. 08-9380 6063
Nedlands WA 6009
Belmont WA 6104
E. info@buxtonresources.com.au
www.buxtonresources.com.au
In the 1980s the US Bureau of Mines (USBoM) evaluated the feasibility of in-situ and
heap leaching for Mn extraction from domestic US ores. Of the 25 deposits
examined, the material tested from the Artillery Peak project area presented the
fastest and highest Mn recovery characteristics in column leaching, and was the only
deposit selected for further evaluation targeting suitability for in-situ recovery (ISR)
methods - work which was curtailed when the USBoM was abolished in 1996.
Buxton will undertake exploration programs targeting saturated deposits of highly
soluble manganese hosted by porous sandstones which will provide a basis for ISR
mining method amenability.
Shogun & Royale Projects (BUX 100%)
The Shogun and Royale Projects form a contiguous package covering 2617 km2
located in the Paterson Region of Western Australia. Exploration on the two (2)
Shogun Project ELA 45/6533 and 45/6534 is targeting magmatic Ni-Cu-Co-PGE
sulphide deposits. The five (5) Royale Project ELAs (E45/6228 through E45/6232)
cover exploration targets for hydrothermal Cu +/- Au – Mo deposits.
During the Quarter, Buxton continued to undertake negotiations with a view to
executing a Heritage Agreement.
Lateron Project (BUX 100%)
The Lateron Project consists of Exploration License E80/5545 located on unclaimed
crown land close to the Tanami Road, approximately 10 km East of Billiluna and 150
km South of Halls Creek in Western Australia. During the Quarter Buxton received
the results of petrological analysis on fragments of diamond drill core recovered from
the site of AFMECO’s 1982 diamond drillhole S19. The report indicates the core
fragments consist of “biotite hornblende quartz diorite, with coarse titanite and
sericite / muscovite pyrite-magnetite-chalcopyrite overprint” – such rocks are
typically associated with magmatic-hydrothermal Cu-Au mineralisation. Airborne
mag indicates these intrusive rocks cover > 7 km2.
During the Quarter Buxton continued negotiations with the new Native Title
Representative Body for the Tjurabalan People with a view to executing a Heritage
Agreement.
PO Box 661
15 Robinson St
T. 08-9380 6063
Nedlands WA 6009
Belmont WA 6104
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Madman Project (BUX 100%)
The Madman Project consists of Exploration License E69/4182located on unclaimed
crown land in the Little Sandy Desert approximately ~375km NE of Wiluna in Western
Australia. Interpretation of publicly available magnetic data indicated a relatively
shallow (~290-325m deep) aeromagnetic anomaly similar in amplitude and
geological setting to the Winu and Havieron discoveries in the northern Paterson
Province. During the Quarter Buxton commenced negotiations a view to executing
a Heritage Agreement.
Project Generation
Buxton has continued to undertake generative work, both in Western Australia and
Arizona. Buxton also undertook detailed assessment for copper opportunities in
Arizona.
Placement & Share Purchase Plan
On 30 May 2024, Buxton announced that the company had received firm
commitments of $2.5 million (before costs) to place shares to institutional and
sophisticated investors (Placement).
The initially intended Placement quantum of $2.0M was increased due to significant
demand. The Placement is 29,411,765 fully paid ordinary shares issued at 8.5 cents
per share (New Shares) with one free attaching listed option for every two New
Shares subscribed for (New Options) with an exercise price of 16 cents and an expiry
date 31 July 2026.
In order that shareholders could participate in a capital raising on the same terms,
Buxton undertook a Share Purchase Plan (‘SPP’) to eligible shareholders. The SPP
closed on 22 July 2024 and the Company received total SPP application funds, plus
the IGO Top-Up, of $0.368 million.
Buxton’s major shareholder and Joint Venture (‘JV’) Partner at the Copper Wolf,
Fraser Range and West Kimberley Projects, IGO Limited (ASX:IGO), participated in
the Placement and subsequently a ‘Top-up Placement’ to increase its shareholding
from 17.98% to 19.95%.
PO Box 661
15 Robinson St
T. 08-9380 6063
Nedlands WA 6009
Belmont WA 6104
E. info@buxtonresources.com.au
www.buxtonresources.com.au
The funds raised under the Placement and SPP will be applied to exploration activity
across Buxton’s portfolio of critical minerals projects, including Graphite Bull, Narryer
and Centurion Project in Australia and the newly acquired Matrix Manganese Project
in Arizona.
Corporate
The Company’s Quarterly Cashflow Report (Appendix 5B) follows this activities
report. The Company had $2.89 million in cash as 30 June 2024. A further $0.368
million was raised under the Share Purchase Plan and Top-Up from from IGO Limited
in July 2024 and is not included in the Appendix 5B. Exploration Expenditure for the
Quarter was $0.846 million with most of this expenditure being associated with field
work in support of the Copper Wolf Project, metallurgical studies and heritage
surveys in support of the Graphite Bull Project, EM surveys at the Narryer Project,
along with other ongoing project assessment. Buxton is also continuing to actively
pursue copper and other commodity opportunities in the USA.
The aggregate amount of payments to related parties and their associates included
in the current Quarter cash flows from operating activities were approximately $36k
comprising directors fees, salaries and superannuation. Corporate and other
administration expenditure was $239k for the Quarter which represents general costs
associated with running the Company, including ASX fees, legal fees, rent,
marketing, etc. Cash outflows for the Quarter were in line with management
expectations. The company is adequately funded to continue its current activities
and will continue to demonstrate appropriate fiscal management.
This announcement is authorised by the Board.
For further information, please contact:
Martin Moloney
Chief Executive Officer
marty@buxtonresources.com.au
Sam Wright
Company Secretary
sam@buxtonresources.com.au
PO Box 661
15 Robinson St
T. 08-9380 6063
Nedlands WA 6009
Belmont WA 6104
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Appendix 1
Changes in interests in mining tenements Buxton Resources Ltd
01/04/24 – 30/06/24
Interests in mining
tenements relinquished,
reduced or lapsed
Interest in mining
tenements acquired or
increased
Tenement
Location / Project
E09/2427
Narryer Project
% at
beginning
of Quarter
100
E09/2428
Narryer Project
100
E09/2429
Narryer Project
100
E04/2314
West Kimberley – IGO/NWC/TT JV
16
MTX 001 MTX 154
Matrix Project, Mohave Co, Arizona
(Federal Lode Mining Claims)
0
* changes occurred between end of the Quarter and issuing this report
E04/2451
West Kimberley - Baracus / IGO JV
16
% at end of
Quarter
100 (voluntary
reduction)
100 (voluntary
reduction)
100 (voluntary
reduction)
0
0 (earning
100%)
16
E04/2060
West Kimberley Regional - IGO JV
20
20
E04/2407
West Kimberley Regional - IGO JV
20
20
E04/2408
West Kimberley Regional - IGO JV
20
20
E04/2411
West Kimberley Regional - IGO JV
20
20
E04/2527
West Kimberley Regional - IGO JV
20
20
E04/2530
West Kimberley Regional - IGO JV
20
20
E04/2536
West Kimberley Regional - IGO JV
20
20
E04/2549
West Kimberley Regional - IGO JV
20
20
E04/2550
West Kimberley Regional - IGO JV
20
20
E04/2578
West Kimberley Regional - IGO JV
20
20
E04/2579
West Kimberley Regional - IGO JV
20
20
E04/2580
West Kimberley Regional - IGO JV
20
20
E04/2581
West Kimberley Regional - IGO JV
20
20
E04/2584
West Kimberley Regional - IGO JV
20
20
E04/2585
West Kimberley Regional - IGO JV
20
20
E04/2609
West Kimberley Regional - IGO JV
20
20
E04/2611
West Kimberley Regional - IGO JV
20
20
E04/2612
West Kimberley Regional - IGO JV
20
20
E04/2613
West Kimberley Regional - IGO JV
20
20
E04/2614
West Kimberley Regional - IGO JV
20
20
PO Box 661
15 Robinson St
T. 08-9380 6063
Nedlands WA 6009
Belmont WA 6104
E. info@buxtonresources.com.au
www.buxtonresources.com.au
E04/2615
West Kimberley Regional - IGO JV
20
20
E04/2617
West Kimberley Regional - IGO JV
20
20
E04/2629
West Kimberley Regional - IGO JV
20
20
E04/2630
West Kimberley Regional - IGO JV
20
20
E04/2631
West Kimberley Regional - IGO JV
20
20
E04/2648
West Kimberley Regional - IGO JV
20
20
E04/2649
West Kimberley Regional - IGO JV
20
20
E04/2650
West Kimberley Regional - IGO JV
20
20
E04/2651
West Kimberley Regional - IGO JV
20
20
E04/1972
West Kimberley – IGO/NWC/TT JV
16
16
E04/2423
West Kimberley – IGO/NWC/TT JV
20
20
E28/1959
Fraser Range - IGO JV
10
10
E28/2201
Fraser Range - IGO JV
10
10
E09/2427
Narryer
100
100
E09/2428
Narryer
100
100
E09/2429
Narryer
100
100
E09/2922
Narryer
100
100
E09/1985
Graphite Bull
100
100
L09/102
Graphite Bull
100
100
L09/103
Graphite Bull
100
100
E69/4182
Madman
100
100
EL80/5545
Lateron
100
100
EL80/5579
Centurion
100
100
LA80/116
Centurion
100
100
LA80/117
Centurion
100
100
MEP 008121028
MEP 008123390
MEP 008124215
SM-01
through
SM-54
CW-01
through
CW-215
Copper
Chief #1-5
& Copper
Chief #1819
Copper Wolf
(Section 16 T8NR1W G&SR Meridian)
Copper Wolf
(Section 9 T8NR1W G&SR Meridian)
Copper Wolf
(Section 29 T8NR1W G&SR Meridian)
Copper Wolf, Yavapai Co, Arizona
(Federal Lode Mining Claims)
100
100
100
100
100
100
100
100
Copper Wolf, Yavapai Co, Arizona
(Federal Lode Mining Claims)
100
100
Copper Wolf, Yavapai Co, Arizona
(Federal Lode Mining Claims)
0
100 (option)
PO Box 661
15 Robinson St
T. 08-9380 6063
Nedlands WA 6009
Belmont WA 6104
E. info@buxtonresources.com.au
www.buxtonresources.com.au
CW-216
through
CW-342
ELA45/6228
Copper Wolf, Yavapai Co, Arizona
(Federal Lode Mining Claims)
0
100
Royale
100
100
ELA45/6229
Royale
100
100
ELA45/6230
Royale
100
100
ELA45/6231
Royale
100
100
ELA45/6232
Royale
100
100
ELA45/6233
Shogun
100
100
ELA45/6234
Shogun
100
100
Abbreviations and Definitions used in Tenement Schedule:
E = Exploration Licence (WA), ELA = Exploration Licence Application (WA), LA – Miscellaneous License Application (WA),
MEP = Mineral Exploration Permit (Arizona)
PO Box 661
15 Robinson St
T. 08-9380 6063
Nedlands WA 6009
Belmont WA 6104
E. info@buxtonresources.com.au
www.buxtonresources.com.au
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Buxton Resources Limited
ABN
Quarter ended (“current quarter”)
86 125 049 550
30 June 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(12 months)
$A’000
647
2,124
(846)
(3,852)
(b) development
-
-
(c) production
-
-
(d) staff costs
(243)
(1,081)
(e) administration and corporate costs
(239)
(794)
-
-
11
34
(a) exploration & evaluation
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other - GST
(16)
(18)
1.9
Net cash provided by/(used in) operating
activities
(686)
(3,587)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
(44)
(5)
(10)
(d) exploration & evaluation
-
-
(e) investments
-
-
(f)
-
-
(c) property, plant and equipment
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(12 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements interests
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash provided by/(used in) investing
activities
(5)
(54)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
2,500
2,500
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(133)
(133)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other
-
-
3.10
Net cash from financing activities
2,367
2,367
4.
Net increase/(decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
1,217
4,145
4.2
Net cash provided by/(used in) operating
activities (item 1.9 above)
(686)
(3,587)
4.3
Net cash provided by/(used in) investing
activities (item 2.6 above)
(5)
(54)
4.4
Net cash from financing activities
(item 3.10 above)
2,367
2,367
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
444.
6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
5.2
Current quarter
$A’000
Year to date
(12 months)
$A’000
6
16
2,887
2,887
Current quarter
$A’000
Previous quarter
$A’000
2,759
1,089
Call deposits
-
-
5.3
Term deposits
128
128
5.4
Other
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
2,887
1,217
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
36
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
8.3
Total relevant net cash inflow (item 8.1 + item 8.2)
(686)
8.4
Cash and cash equivalents at quarter end (item 4.6)
2,887
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
-
$A’000
(686)
-
2,887
4.21
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Li
Share your feedback